Arunachal Pradesh · brahmaputra · Landslide dam

Landslide DAM on Tsangpo creates flood disaster risk for Siang

A massive dam, created by landslide in early hours (around 5 am) of Oct 17,2018 has blocked the main stream of Yarlung Tsangpo in Tibet. The reservoir behind the dam already has humungous 360 Million Cubic Meters (MCM) of water by 7 am on Oct 18, 2018 and as per latest reports (subsequently saw the CWC tweet put out at 955 pm on Oct 18,  saying  that storage had reached 484 MCM by 8 pm on Oct 18), the reservoir is still growing in size. The exact location of the landslide dam is uncertain. According to one source, the latitude longitude could be 94.93754° E, 29.74957° N, but this may not be accurate the likely location may be a few kilometers downstream from here. The Chinese media[i] has reported that the landslide dam is located at near Gyalha village in Milin or Manling county. According to some experts who visited the site, the dam could breach very soon, possibly on Oct 19, bringing massive floods along Siang river in Arunachal Pradesh. Continue reading “Landslide DAM on Tsangpo creates flood disaster risk for Siang”

Arunachal Pradesh · Hydropower · Lohit River

NBWL pushes Lower Demwe HEP on Lohit River in Arunachal Pradesh based on fudged WII report

The Minutes of 50th Meeting of Standing Committee (SC) of National Board of Wild Life (NBWL), held on 7th Sept 2018, were made available on 26th Sept  2018. On viewing the Minutes of Meeting, the petitioner to NGT Bimal Gogoi wrote to the Chairman and the Members of SC Of NBWL about the recommendation of the SC of NBWL on Demwe Lower Project.

Date : September 26, 2018

To: Dr. Harsh Vardhan

The Chairperson,

Standing Committee of the National Board for Wildlife,

New Delhi.

URGENT: Grant of wildlife clearance to Demwe Lower project based on faulty WII report is shocking and should be reversed

Dear Dr. Harsh Vardhan and Members of the Standing Committee of the NBWL,

Greetings from the Northeast! I have just perused the minutes of the 50th meeting of the SCNBWL and I am shocked to see that your committee has granted wildlife clearance to the 1750 MW Demwe Lower project based on a seriously flawed report of the Wildlife Institute of India (WII). Continue reading “NBWL pushes Lower Demwe HEP on Lohit River in Arunachal Pradesh based on fudged WII report”

Dams · Floods

Overview of CWC Flood Monitoring Sites 2018: INDIA

Central Water Commission is the only agency doing flood forecasting in India. As per CWC’s Flood Forecasting website[i] the Data Flow Map has information about 226 Flood Forecast Sites in the country comprising of 166 Level Forecast Sites and 60 Inflow Forecast Sites. It also monitors 700 Flood sites, information made available through List Based Exploration and Hydrograph View, but no flood forecasting is done for these sites.

In order to better understand the CWC’s flood monitoring and forecasting work, SANDRP has published report of CWC’s Level Forecast, Inflow Forecast and level monitoring sites in 5 zones of North India[ii], North East India[iii], East India[iv], South India[v] and West India[vi].  Through this report, we have presented all the data at one place with links to separate zone wise reports with detailed description.

Continue reading “Overview of CWC Flood Monitoring Sites 2018: INDIA”

Dams · Floods

Overview of CWC’s Flood Forecasting Sites 2018: North East India

Central Water Commission (CWC) measures and monitors water level at 700 hundred Flood Forecasting site in the country. It publishes this information on its Flood Forecast website[I]. The website has three ways to get this information: Data Flow Map, List Based Exploration, and Hydrograph view. The Hydrograph view provides information for past 72 hours, supposed to be updated every hour. This is in addition to the list of current forecasts.

As per the website the Data Flow Map has information about 226 Flood Forecast Sites in the country comprising of 166 Level Forecast Sites and 60 Inflow Forecast Sites. It also monitors 700 Flood sites, information made available through List Based Exploration and Hydrograph View.

In order to better understanding the CWC’s flood monitoring and forecasting work, in this article we have given state wise list of CWC’s Level Forecast, Inflow Forecast and level monitoring sites in North East India. For better understanding, we have also included part of West Bengal that is in Brahmaputra basin here, in addition to the 8 North Eastern states. Similar report has been published for North India[II] and we hope to publish reports covering other regions of India too.

Continue reading “Overview of CWC’s Flood Forecasting Sites 2018: North East India”

Lohit River

Photo Journey along free flowing Lohit River in Arunachal Pradesh

Guest Blog by Nivedita Khandekar

An abundance of a river and fast diminishing forests This photo-story chronicles the various moods of Lohit river from the point it enters India to the point where it is joined by two equally big rivers to form the mighty Brahmaputra. All photographs taken by Nivedita Khandekar during various journeys over the last decade, mostly in winters.

From references in Indian mythology to the location for proposed cascade of hydro-power projects, Lohit river of Arunachal Pradesh in north-eastern India is unique in many ways. It enters India at the juncture of Tibet, Myanmar and India at the easternmost point. It is as if this free-flowing, almost tempestuous river, cutting across the Himalayan hills, draws its tenacity from the people abounding its path. It would not be wrong to say that the unpretentious Meyor and the Mishmi communities lend their character to the river they call their own. After meandering through the Mishmi Hills, it traverses a short distance at the foothills as if freed from hilly prison only to assimilate its huge volume of waters with two other giant rivers to form the colossal Brahmaputra. Continue reading “Photo Journey along free flowing Lohit River in Arunachal Pradesh”

Dams · DRP News Bulletin

DRP News Bulletin 4 June 2018: WED 2018: Environment Protection and Development is NECESSARY and POSSIBLE, provided there is will

How is development possible along with environment protection?  There are two kinds of answers possible to this question. The standard kind of reply would try to provide a list of options that are available to a given development need. Continue reading “DRP News Bulletin 4 June 2018: WED 2018: Environment Protection and Development is NECESSARY and POSSIBLE, provided there is will”

brahmaputra · China · Siang

Muddy Siang is sign of danger ahead, wake up call for Indian authorities

The current ongoing episode of Muddy Siang River water in Arunachal Pradesh is due to landslides in the upstream Tibet, triggered by the earthquakes starting on Nov 17, 2017 or possibly earlier. This is revealed by the satellite pictures and work of two researchers, first published in Arunachal Times on Dec 21, 2017[i]. These landslides are partly blocking the Siang flow and could lead to massive floods in the downstream Arunachal Pradesh and Assam any day.

A similar event in year 2000 led to sudden, massive floods in Siang River in Arunachal Pradesh on June 1, 2000. That episode, like the current one, started about 53 days before the floods, on April 9, 2000 due to landslides along a tributary of Yarlung Tsangpo, as Siang is known in Tibet. Continue reading “Muddy Siang is sign of danger ahead, wake up call for Indian authorities”

Dams · DRP News Bulletin

DRP News Bulletin 06 November 2017 (NGT Asks For Fresh Appraisal Of Lower Subansiri Hydro Project)

In a remarkable development, the National Green Tribunal (NGT) on October 24 has suspended the clearances given to the 1750-megawatt (MW) Demwe Lower Hydroelectric Project  (HEP) planned on the Lohit river in Arunachal Pradesh.

In its detailed order, released on October 27, the NGT ruled that the Environment Minister as Chairperson of the National Board for Wildlife (NWBL), a statutory body constituted under the Wildlife Protection Act, 1972, could not “just brush aside” the views of the majority of NBWL standing committee members.

Suspending the clearances given by the Centre and the state govt, the NGT order added that “the decision taken by the Standing Committee is not in accordance with established principles of law and hence the Standing Committee shall reconsider the issue and pass appropriate orders within a period of six months from the date of the judgment”.

Environmental clearance for the project was given by the Union environment ministry’s Expert Appraisal Committee (EAC) for river valley and hydroelectric projects back in 2009. An in-principle forest clearance for the Lower project was given in February 2012 and agreed upon in 2013.

However, the in-principle clearance of the project was opposed by a majority of the Standing Committee of the NBWL but subsequently cleared by the then-environment minister of state (independent charge), Jayanthi Natarajan, who was also the chairperson of the Standing Committee.

Natarajan is currently under the CBI’s scanner for alleged anomalies in clearance given for diversion of land in Saranda forest in Singhbhum district, Jharkhand to mining company Electrosteel during the previous UPA regime.

The NGT said that it is “of the view that either the Chairperson (Natarajan) should have given a proper reason for rejecting the objection of the majority of the non-official members or the decision ought to have been arrived at based on the opinion of the majority of the members. Even though the Standing Committee is a recommendatory body, the same being a statutory committee, is bound by the laudable principles of justice and fair play”.

Continue reading “DRP News Bulletin 06 November 2017 (NGT Asks For Fresh Appraisal Of Lower Subansiri Hydro Project)”

Arunachal Pradesh · Assam · brahmaputra · Dams · Lohit River

‘Banks of the Lohit will shine’: Glimpses of a free-flowing river

Above: Lohit River, Parshuram Kund on the right. Photo: Parineeta Dandekar

Assam, Arunachal and the North East India, West Bengal and Bangladesh are riverine entities in many ways. Ancient rivers flowing through this landscape have moulded not only the mountains and the silt-heavy banks, but cultural identity of the region itself.  Rivers permeate through the literature, folklore, songs, poems, cuisine, even dressing… Bhupen Hazarika, the Bard of the Brahmaputra, likened the red ripples of the Assamese Gamcha (red and white stole)  to the braided filigree of the Red River. When Guwahati University opened on the banks of Luit, Hazarika sang “Jilikabo Luiter Paar”..Banks of the Luit will Shine. Rivers stood for revolution as they stood for Love.. Jyoti Prasad Agarwal wrote “Luitar Parore Ami Deka Lora.. Moribole Bhoi Nai.” (“We are the youth from the banks of the Luit/ We are not afraid of death”). Older poets like Parvato Prasad Baruah wrote entire books full of poems of Luit and today modern poets in Assam like Jeeban Narah  link their creative processes inextricably to rivers. Continue reading “‘Banks of the Lohit will shine’: Glimpses of a free-flowing river”

Cumulative Impact Assessment · Dams · Ministry of Environment and Forests

Transparency in Environment Governance? Expert Meeting on River Projects does not have documents in open domain

Above: Protest against Lower Subansiri Project in Assam. Basin Study of Lower Subansiri is also a part of intense debate in Assam. Now these studies are under wraps by the MoEF and CC

Non-transparent Environment Governance does not help anyone, neither is it legal. In the upcoming Expert Meeting of the MoEF and CC on River Valley Projects (read dams), documents pertaining to 6 of the 8 projects being considered are not available!

We have appealed to the new Minister to take swift action against this non-transparent and non-democratic governance in the MoEF and CC. Please feel free to send similar letters to the email addresses mentioned below. Continue reading “Transparency in Environment Governance? Expert Meeting on River Projects does not have documents in open domain”