A review of water issues in Maharashtra in 2013

2013 will remain a memorable year for Maharashtra’s water sector in many ways. The year saw several remarkable events, including country’s the biggest dam scam, a severe drought followed by floods, unprecedented intrastate water conflicts, court rulings in many hues, disaster management preparedness, push for urban and industrial water, etc. These issues have raised a question mark over institutions and governance mechanisms around water in the state. 2013 year has been a crucible of sorts through which the flaws and strengths of prevailing water management in Maharashtra can possibly be assessed. This is an attempt to give an overview of the important water happenings in Maharashtra during this year.

As the year 2012 ended, a White Paper on Irrigation Projects[i] was published by the Water Resources Department (WRD)  Government of Maharashtra after much pressure from civil society and media following colossal corruption charges[ii] against the WRD, and also against the NCP (Nationalist Congress Party) which held the portfolio for more than 11 years. This was looked at primarily as a political move in the ongoing tussle between NCP and Congress. Immediately after its publication, Deputy Chief Minister Ajit Pawar who had resigned over corruption charges in WRD was reinstated, without clearing his name. Modus operandi of the dam scam included pushing and initiating multiple projects, incomplete works, unbelievable and irregular cost escalations post tendering: some to the tune of 300%, favoring a cartel of contractors, poor quality of construction, absence of essential studies like water availability, detailed designs, DPRs, absence of canal networks, etc.  All this culminated into the fact that after spending Rs 70000 crores on irrigation projects in the past 10 years, the actual increase in irrigated area was extremely low.

Poor quality work at Gosekhurd Canals, Vidarbha Photo: Tehelka
Poor quality work at Gosekhurd Canals, Vidarbha Photo: Tehelka

The white paper provided a status report of projects under the WRD, the money spent, cost escalations and reasons, status of clearances, etc. As was predicted by many, the white paper has been a white wash. Not only has it presented false information about many projects, it has chosen not to report many controversial projects, and has not given any convincing reasons for delay and cost hikes. It nonchalantly reported illegalities like the on-going work without mandatory Forest and Environmental clearances.

One of the remarkable features of the dam scam and white paper has been that both issues were highlighted and pushed by the civil society and the media and also the CAG report.  Parts of the Dam scam was unearthed after organizations like IAC (India Against Corruption), Shramik Mukti Sangathan, SANDRP, etc. which worked on individual projects, mainly of the Konkan Irrigation Development Corporation (KIDC), strung together evidence to understand the scope and scale of the scam. One of the eloquent voices in this group has been that of Ms Anjali Damaniya, now with the AAP (Aam Aadmi Party), who joined the dots across Maharashtra and collected a body of evidence which irrefutably indicated the massive corruption and problems in the WRD. Equally remarkable was Chief Engineer Vijay Pandhare’s unshaking stand against the functioning of his own department. Not surprisingly, he was deemed as being mentally imbalanced by the Ministers.[iii]

In this entire episode, Chief Minister of Maharashtra and his government succumbed to the pressures of vested interests in the pro dam lobby, losing a golden opportunity to purge the irrigation sector of its collective corruption.

The White paper was followed by the constitution of a Special investigation Team (SIT) in December 2012 under the chairpersonship of Dr. Madhav Chitale, to investigate the corruption charges and to recommend further action to the WRD. Unfortunately, not only did the constitution of the SIT interfere with taking the WRD into the court, the members, including Chitale, are all known for toeing the government line. Chitale is also known for his pro-dam stance. On top of this, the SIT refused to accept any evidence about the scam from anyone outside the WRD. This move was criticized by many, after which the SIT started accepting such submissions. However, many view the constitution only for buying time and diluting and delaying actual strong action which is deserved by the WRD. [iv] This again shows how the Maharashtra government led by Chavan did not understand the issue and did not have the courage to provide transparent governance.

Massive Drought: Monsoon of 2012 had been poor in many regions across Maharashtra. End of 2012 itself saw severe water stress in many regions and increasing conflicts. The situation needed quick appraisal and strong, urgent measures. But the MWRRA (Maharashtra Water Resources Regulatory Authority), expressly constituted in 2005 to provide equitable water distribution in the state was busy holding meetings about water rates.[v] By December 2012 live storages of many projects, including Ujani, touched zero. Months that followed saw one of the most severe droughts experienced by Maharashtra. This was dubbed as a drought worse that 1972 by political leaders, to underline the “natural disaster” and escape responsibility. However, SANDRP’s analysis proved that rainfall in 2012 had been more than that of 1972 in almost all of the 17worse drought-affected districts in Maharashtra. This proved that 40 years after 1972 and after spending thousands of crores on dams and institutions, the impact of a drought less severe than that of 1972 was more severe, highlighting the mismanagement of water on a large scale.[vi]

Water released from Bhama Askhed Dam to downstream Ujani, as per High Court orders. Photo: SANDRP
Water released from Bhama Askhed Dam to downstream Ujani, as per High Court orders. Photo: SANDRP

Sugarcane concentrated in the worst drought hit regions There were many reasons behind this situation, including inequitable water allocation, pollution, dam scam, etc. One of the major culprits was wide spread cultivation of water intensive sugarcane, promoted by the politicians and the government. The water use efficiency of Maharashtra’s cane farming is dismally low, as compared to other states like Uttar Pradesh.[vii] Solapur region, worse hit by drought has the maximum concentration of sugar factories (28) and maximum area under sugarcane.[viii] It also includes Union Agricultural Minister’s (Shri Sharad Pawar) constituency of Madha. Water required for cultivating sugarcane on 155 864 ha area under sugarcane in Solapur works out to be 2630 Million Cubic Meters (MCM). This is 1.73 times the live storage capacity of Ujani Dam (Live Storage: 1517 MCM), the largest reservoir in Bhima basin and third largest reservoir of Maharashtra.[ix] All this cane was crushed when drought was at its worst. In regions like Osmanabad, all of the cane over 50,000 ha was crushed when all of the dams in the region were at dead storage! The same drought-hit region was also going to host several new (mostly private) sugar factories. SANDRP analysed the impact of sugarcane on drought and highlighted this at multiple fora[x]. Some, like Rural Minister Dhobale, promised that new factories will not come up in drought regions. But this has not been implemented.

Most of the water of Ujani Dam in Solapur was diverted for sugarcane, without any checks from anyone. As it reached dead storage, drinking water to villages was affected. The High Court, while hearing a case filed by Prabhakar Deshmukh of Solapur ordered in April 2013 that dams upstream Ujani should release water immediately for the downstream Ujani Dam and other areas. The rationale behind water releases to Ujani has been questioned. Importantly, even in the village of Prabhakar Deshmukh, sugar industries continued to crush cane using huge quantity of water every day, even when he was on fast.[xi] The government has been completely ineffective in dealing with this issue.

DSC00724

Marathwada was most severely hit by drought and was also at the receiving end of a complex upstream-downstream water conflict. After commissioning the massive Jayakwadi Dam near Aurangabad in this region, several (more than 11) dams have been built in the upstream Godavari Basin in Nashik and Ahmednagar Districts. These dams have reduced the water flow into Jayakwadi.[xii] In keeping with Section 11 and 12 of MWRRA, All dams within a basin should have approximately same percentage of water in October each year. However, in Godavari, upstream dams held upto 90% water, even when Jayakwadi was at Dead storage. Multiple cases were filed in Aurangabad bench of High Court which twice ordered release of water from upstream dams. How much water of it actually reached Jayakwadi remains an unanswered question.

Thus the year also saw complete ineffectiveness of MWRRA as an institution. It was shamed by the High Court. More than 13 posts, including the chairperson and expert members were not filled for several years and the authority was all together nonfunctional. Rules of the Act were not made 8 years after formulating the act. They were hastily made after HC orders and very significantly, tried to delete the same clauses which were significant for equitable water distribution. This again was and is being contested by civil society, especially in Marathwada. Now, the WRD has appointed a committee under the chairpersonship of Mr. Mendhegiri, Director WALMI, specifically tasked with making MWRRA “practicable”.  Marathwada groups see this as a clear threat to Jayakwadi and have written to the government as well as Mendhegiri Committee. The road ahead seems long.[xiii]

Drought of 2013 was not without bright sparks, though. Collectors from places like Beed, Jalna and Osmanabad took some strong stands. Notable amongst these was Dr. Nagargoze from Osmanabad. Many of their recommendations were however ignored. Civil society groups became active and vocal about equitable water management. Many villages joined initiated desilting tanks and weirs. Several new watershed structures were erected. All this led to considerable storage in 2013 monsoons.

However, quick fix methods like Shirapur pattern which entail deepening and widening of streams and rivulets, was pushed indiscriminately for all, as was string of cement nallah bunds, but this again was contested for its impacts on groundwater and environment. It is now reported that Government has applied for a Rs 60,000 crores loan for drought proofing works, with support from the World Bank. Before such big ticket expenses, we need to check what happened to the thousands of crores spent on watershed management and specifically minor irrigation projects? Large number of minor irrigation projects are dysfunctional and poorly maintained, like their big counterparts. People’s participation in management is the key, but is entirely absent.[xiv] The year 2013 also saw tragic death of five engineers of the WRD, while inspecting a flawed minor irrigation project, which caved in during the inspection.

Unviable LIS also violate laws At the same time, many Lift Irrigation Schemes (LIS) of Maharashtra applied for TOR clearance or Environmental clearances with the Ministry of Environment and Forests, Central Government. SANDRP was following this closely and we were shocked to find that many projects which applied for clearances were already underway, some were nearly finished. All such work before clearance is in complete violation of the Environmental Protection Act 1986 and EIA Notification Sept 2006. All of these projects: Lower Dnyan Ganga, Ar kacheri and Alewadi nalla, Shirpaur Lift Irrigation Scheme and Krishna Marathwada Lift Irrigation scheme were rejected clearance by the MoEF’s Expert Appraisal Committee on River Valley Projects after SANDRP wrote to the EAC about the violations. Though White paper stated Forest and Environmental clearances as hurdles to its work, we see that projects do not wait for these processes and WRD pushes on with illegal works.

2013 Monsoon 2013 monsoon (June-Sept) has been satisfactory for most of the state: Vidarbha got 1360.4 mm (43% above average) rainfall, Madhya Maharashtra got 880.1 mm (21% above average) rainfall, Konkan got 3502.6 mm (20% above average) rainfall and Marathawada got 747.3 mm (9% above average) rainfall. Thus Vidarbha, already stressed by water diversions for thermal power plants and farmers plight, faced severe floods this year. Standing crops of cotton and soyabean were destroyed and the impacts of soil erosion continue till date. Same is the case with Dhule and Jalgaon districts. Operation of Dams has been held responsible for compounding the flood losses in places like Wardha and Chandrapur. Compensation announced to the farmers is meager, with some receiving single digit checks.

The Krishna Water Disputes Tribunal announced its final verdict in November 2013, disallowing Maharashtra to make any further interbasin transfers, especially through the Krishna Marathwada Lift Irrigation project. The work on this project is already progressed to considerable extent. Mostly, this again will be money down the drain. The project also applied for environment clearance, but was denied that following SANDRP submission that work has already progressed before the clearance.

Western Ghats 2013 also saw a huge upheaval and public discourse surrounding the Western Ghats, following the Western Ghats Expert Ecology Panel (WGEEP) Report by Prof. Madhav Gadgil and the problematic Kasturirangan Committee report, mainly to dilute WGEEP recommendations[xv]. The affidavit submitted by Principal Secretary Maharashtra on the WGEEP report is extremely flawed. Even when SANDRP and other organizations highlighted the gross violations in KIDC irrigation projects, the Forest and Irrigation department continued to ignore that[xvi]. The affidavit[xvii] says that interbasin water transfers in Western Ghats are necessary in Maharashtra for the water security of the drought affected region in the Deccan plateau, but ironically, all the current water transfers of more than 2000 MCM annually though Koyana HEP and TATA HEPs is transferring water FROM this very drought hit region TO the water surplus region of Konkan And this was not checked even when the 2012-13 drought was at its peak and organizations like SANDRP raised this issue during the drought.[xviii]

Bhivpuri

The dithering ways of Congress government at the centre and state are epitomsed in a recent event of appointing Veerapa Moily, a completely unsuitable candidate[xix], as the Union Environment Minister. One of the first persons Mr. Moily met after becoming the Minister of Environment was Mr. Prithviraj Chavan, along with Kerala CM, with the CMs advocating putting a hold on the ESAs in Western Ghats recommended by the Kasturirangan committee and Mr. Moily promptly obliging. In earlier meetings, which I attended, Mr. Chavan intentionally depicted WGEEP report in incorrect light. This may have something to do with entrenched interests another congress MLA, Narayan Rane, in mining and destructive activities in the Western Ghats of Maharashtra.

Looking at Rahul Gandhi’s absolutely incorrect depiction of Environment and Environmental clearances as hurdles at the FICCI meet, it looks like the congress establishment has just not got the message from the AAP episode in Delhi. People have indicated that they want clean, participatory and responsive governance and not just growth at any cost. The establishment seems to have no clue about the dependence of the poor on the environmental resources.

Dams around Mumbai, in the Western Ghats 2013 saw frenzied activity by the Mumbai Metropolitan Regional Development Authority (MMRDA) and Municipal Corporation of Greater Mumbai (MCGM) to push more and more drinking water supply dams in the tribal areas of Western Ghats MMR region. Around 12 dams are now in various stages of completion, construction and planning for the MMR Urban areas. They will together affect more than 100,000 tribals and submerge more than 22,000 hectares of land including over 7000 hectares of forests and protected areas. Looking at options that Mumbai has and its current water management, these dams are totally unjustified. Some dams like Kalu started even before statutory Forest clearance. Balganga dam is 90% complete without land acquisition! In Suseri Dam, the contractor secured permission for a farm house and built a site office instead. SANDRP and other organizations held a workshop focusing on these issues in Mumbai on the 18th December 2013.[xx]Here too, the fight for sustainable and equitable water management looks tough as the power equation is skewed in favour of the urban areas.

Forests in Tansa Wildlife Sanctuary. 750 hectares of these forests will be submerged for the Gargai Dam. Photo: SANDRP
Forests in Tansa Wildlife Sanctuary. 750 hectares of these forests will be submerged for the Gargai Dam. Photo: SANDRP

Significantly, it was at Mr. Chavan’s request letter to Union Environment Minister that Kalu Dam was considered again by the Forest Advisory Committee, MoEF in April 2013 and was given in-principle clearance a month later, after being categorically rejected just one year back. The dam will submerge 1000 hectares of forests in Western Ghats and will affect at least 18000 tribals. Mr. Chavan, in one of his meetings, had said that no project will go ahead without assessing its impact on the environment. I had then publicly reminded him there that no assessment has taken place for Kalu and he himself is pushing it without assessment.

The urban water scenario in Maharashtra is seriously problematic at the moment. Many urban areas are in a hurry to build new dams as the only option to their increasing water supply, but are not ready to harvest rain, or to treat and reuse any sewage they generate or to revive their rivers and other local water sources or achieve any participatory governance. Nashik, which receives additional funds from the National River Conservation Directorate for cleaning up Godavari is converting the river into a drain, while hankering for a new dam called Kikvi. SANDRP raised objections about this proposal and it is yet to receive final Forest Clearance from the MoEF.[xxi] Godavari Gatarikaran Virodhi manch, a civil society group in Nashik has filed 3 petitions against the Municipal Corporation and MIDC for polluting Godavari. The corporation is actually releasing untreated sewage in the river, just a few hundred meters upstream the holy Ramkund in which devotees take a dip and consume teerth, especially during Kumbh Mela.

All in all, 2013 exposed the gaping holes in Maharashtra’s water governance. Events which happened this year are not one-off accidents but underline systemic flaws. Some of the main factors include blind push for big dams, no post facto analysis of existing projects, absence of equitable water distribution, exclusion of communities in decision making and management, absence of transparency and accountability in management and corruption and arrogance linked to powerful vested interests.

As the year 2013 closes, Chief Minister, Union Agriculture Minister and all the dignitaries so very linked with sugar sector again came together at the Vasantdada Sugar Institute’s Annual General Meeting in December 2013. The same leaders had met at the same forum in March 2013 in the middle of the drought, when the Union Agriculture Minister had said that from next year flow irrigation to sugarcane will be stopped and drip will be made compulsory.[xxii]  But just after 9 months from the “worse drought in 40 years”, these promises seem to have been forgotten. The same Minister did not even mention drip in his December 2013 address.

Union Agriculture Minister Sharad Pawar, Maharashtra Chief Minister Prithviraj Chavan, Deputy CM Ajit Pawar at the award presentation ceremony at the 37th Annual General Meeting (AGM) of the Vasantdada Sugar Institute (VSI) at Manjri in Pune, Maharashtra. Photo: ePrahaar
Union Agriculture Minister Sharad Pawar, Maharashtra Chief Minister Prithviraj Chavan, Deputy CM Ajit Pawar at the award presentation ceremony at the 37th Annual General Meeting (AGM) of the Vasantdada Sugar Institute (VSI) at Manjri in Pune, Maharashtra. Photo: ePrahaar

In conclusion 2013 ends in India on a historical note, with the Aam Admi Party taking over the reins of the government in Delhi, riding to power on the promise of clean, corruption free, pro-people and hence pro-environment governance. The key operative term here is transparent and democratic governance.

In Maharashtra, Chief Minister Prithviraj Chavan assumed office on a similar promise of clean governance, but the CM and his government has completely lost this claim. It was shocking to see that the Chavan government rejected the Adarsh Scam report hat indicting the ruling Cong and NCP leaders, highlighting the misguided, dishonest and weak governance in the State. Political opposition has also completely failed here. In the dam scam or other episodes described above, neither the BJP, nor the Shiv Sena nor any other party could play an effective pro-people role.

Thus, as far as current political set up in the state is concerned, the writing is clearly on the wall. Rural poor who do not receive irrigation, farmers whose water is stolen by industries, urban poor and the middle class who do not get assured water despite the city spending thousands of crores on water supply projects, rivers which are drying up, they all need alternatives and pro people governance.

Let us hope and work to ensure that 2014 will be a different year. It is a tough road ahead.

Parineeta Dandekar (parineeta.dandekar@gmail.com) ,

with inputs from Himanshu Thakkar (ht.sandrp@gmail.com)

END NOTES:


Dams

A review of the water sector in India in 2013: Increasing signs of crisis

Year-end provides a wonderful opportunity for us to take stock of siatuations. If we look at India’s water sector, the above-average rainfall in 2013 monsoon would mean good agricultural production.

But the water sector as a whole is showing increasing signs of trouble.

Let us take few examples. The most striking crisis of 2013 was the unprecedented flood disaster in Uttarakhand in June where thousands perished. Experts and media called it a man-made disaster with a significant role played by existing and under construction hydropower projects and other unsustainable infrastructure. (SANDRPs Report) The Supreme Court order of Aug 13, 2013 directed the Union Ministry of Environment and Forests to set up a committee to look into the role played by existing and under construction hydropower projects in the disaster and also directed that no further clearance to any hydropower projects be given till further orders. This order was possibly the only hopeful sign since Uttarakhand government, other Himalayan states or the central agencies including NDMA and MoEF, seem to have learnt no lessons from the disaster.

Destroyed Vishnuprayag HEP on Alaknanda . Courtesy: Matu Jan Sangathan
Destroyed Vishnuprayag HEP on Alaknanda . Courtesy: Matu Jan Sangathan

Earlier in 2012-13 we saw triple crisis in Maharashtra in the form of worst drought in 40 years, worst irrigation scam in independent India and agitation against diversion of huge quantity of water from agriculture to non agriculture sector without any participatory process. In Andhra Pradesh too, a massive irrigation scam was exposed by the CAG report. In fact inequity in the distribution of costs and benefits related to water sector project lies at the heart of the bifurcation of the troubled state.

 Dry Seena River in Madha in March 2013. Madha has a dense concentration of Sugar Factories. Photo: SANDRP
Dry Seena River in Madha in March 2013. Madha has a dense concentration of Sugar Factories. Photo: SANDRP

In Chhattisgarh and downstream Orissa, thermal power plans of massive capacities are going to impact the water situation so fundamentally that big trouble is likely to erupt there, which may impact several other sectors. Madhya Pradesh government is on a big dam building spree in all its river basins, including Narmada, Chambal and also the water scarce Bundelkhand. All of these projects are for canal irrigation when canal irrigation has failed to add any area to the total net irrigation at national level for over two decades now. We could see a new massive irrigation scam in MP in coming years, in addition to agitations and interstate disputes. Gujarat too saw a very bad drought in 2012-13, and there is increasing perception that Gujarat government is by design not building the distribution network to take the Narmada Dam waters to Kutch and Saurashtra, for whom the project was justified and built.

In North East India it is now two years since massive agitation has led to stoppage of work at ongoing 2000 MW Lower Subansiri hydropower project. This is India’s largest under construction hydropower project on which over Rs 5000 crores have been spent without putting in place basic studies or participatory decision making process. Similar fate awaits if the government goes ahead with other hydropower development projects in the region without learning lessons from this episode. During the year, Forest Advisory Committee’s rejection to grant forest clearance to 3000 MW Dibang and 1500 MW Tipaimukh projects in the region was a good sign, so is the stoppage of work at Maphithel dam in Manipur by the National Green Tribunal.

Breathtaking floodplains of the Lohit River, an important tributary of the Brahmaputra, threatened by the 1750 MW Lower Demwe Dam.  Photo: Neeraj Vagholikar
Breathtaking floodplains of the Lohit River, an important tributary of the Brahmaputra, threatened by the 1750 MW Lower Demwe Dam.
Photo: Neeraj Vagholikar

But we have seen no sign of improvement in environment governance. The year saw the questionable appointment of former Coal Secretary as chairman of the Expert Appraisal Committee on River Valley Committee, by Union Ministry of Environment and Forest. In fact, several of the new appointees in the committee do not have any background in environmental issues. The year also began on the wrong note with the environment clearance to the 620 MW Luhri hydropower project in Himachal Pradesh, designed to destroy the last flowing stretch of SutlejRiver in the state. In April 2013, the Forest Advisory Committee took the most shocking decision of approving the completely unjustifiable Kalu dam for Mumbai Metropolitan Region, without any assessments. The same FAC had rejected the proposal one year back and the reasons for that rejections stand even today.

In Western Ghats, the decision of the Union government of dumping the Western Ghats Expert Ecology Panel Report (Gadgil Report) and instead in principle accepting the-much criticized Kasturirangan committee Report has already led to full blown crisis in Kerala and is threatening to engulf more areas. This crisis was completely avoidable if the MoEF, in stead had used last two years to encourage public education on the need for implementing the Gadgil panel recommendations.

While relatively poorer states like Rajasthan, Madhya Pradesh, Chhattisgarh and Orissa has shown big jump in agriculture growth rates in recent years, these have come at the cost of huge depletion in groundwater levels. As Vijayshankar of Samaj Pragati Sahyog said at a conference in Delhi recently, in Rajasthan, the level of groundwater development (ratio of annual groundwater draft to annual utilizable recharge) increased alarmingly from 59% in 1995 to 135% in 2009, indicating that Rajasthan is now in the overexploited category. Of the 236 blocks in Rajasthan, massive 164 (69%) were in over exploited category in 2009. In Madhya Pradesh, while the state groundwater use has moved from 48 to 56%, about 89 blocks out of total 313 (28%) are using unsafe levels of groundwater.

This fresh news of groundwater depletion in new areas is bad sign in medium and long range. “Over the last four decades, around 84 per cent of the total addition to the net irrigated area has come from groundwater. India is by far the largest and fastest growing consumer of groundwater in the world. But groundwater is being exploited beyond sustainable levels and with an estimated 30 million groundwater structures in play, India may be hurtling towards a serious crisis of groundwater over-extraction and quality deterioration”, said Planning Commission member Mihir Shah at a recent meeting in Delhi. 12th Five Year Plan has started the new scheme of mapping groundwater aquifers of India, which is a useful step, but we have yet to crack the puzzle of how to regulate groundwater use to ensure its equitable and sustainable use for priority sectors.

The state of our rivers as also the reservoirs and other water infrastructure is deteriorating but our water resources establishment has shown little concern for that. The IIT consortium report on the Ganga River Basin Management Plan is due soon, but if the pathetic interim report is any sign, there is little hope there.

Ganga, completely dry downstream Bhimgouda Barrage, Haridwar Photo: Parineeta, SANDRP
Ganga, completely dry downstream Bhimgouda Barrage, Haridwar Photo: Parineeta, SANDRP

The year 2012 ended with the National Water Resources Council approving the National Water Policy 2012. At the end of 2013 we have yet to see a credible plan in place for implementing the policy provisions. The year saw proposal from Union Ministry of Water Resources for a new Draft National Water Framework Law, Draft River Basin Management Bill and draft National Policy Guidelines for water sharing/ distribution amongst states. None of them have reached finality and all of them are likely to be opposed by states as an encroachment on their constitutional domain. In fact the interstate Mahadayi River conflict has reached a flashpoint with upstream Karnataka and Maharashtra starting dams in the basin without even statutory clearances from the centre or consent from downstream state of Goa.

While all this looks rather bleak, increasing agitations and informed protests all over India on water issues is certainly hopeful sign. More community groups are challenging inadequately done environmental impact assessments, cumulative impact assessments, basin studies, downstream impact assessments, concepts like eflows etc, raising very informed and pertinent questions. Most of these studies have been the monopoly of select, fraudulent EIA agencies. Critical questions indicate that these studies cannot be done excluding local communities, their knowledge and their concerns. Among other hopeful signs include some of the decisions of the National Green Tribunal on Yamuna and other rivers.

The underlying theme of these events is the increasing trend of state in India working for the interest of the corporate interests to the exclusion of people, environment and democracy. It is a challenge for us all to see how to reverse this trend.

The year 2013 also marks the end of the current term of the Union government. While there is little to hope from the two main political parties ruling the centre and the states mentioned above, perhaps the emerging political alternative in Delhi will grow and move in right direction. Let us hope for the best.

 Himanshu Thakkar (https://sandrp.wordpress.com/, https://sandrp.in/)

(An edited version of this was published in January 2014 issue of Civil Society, see: http://www.civilsocietyonline.com/pages/Details.aspx?455)

Dams · Maharashtra

Multiple Dams for Mumbai Region have Severe Impacts and are Unjustifiable

Press Release                                                                                                                                                  18.12.13                           

Multiple Dams for Mumbai Region have severe impacts and are unjustifiable

More than 50 people including tribal groups, social activists, water experts, ecologists and wildlife experts, academics came together for a brainstorming workshop about Dams coming up for Mumbai Region. The meeting was organized by South Asia Network on Dams, Rivers and People, Shramik Mukti Sangathana, Jalbiradari and Keystone Foundation.

About 12 dams are planned or are under construction to satisfy the increasing thirst of the Mumbai Metropolitan Region (MMR). All of these dams fall in eco-sensitive region of the Western Ghats. They will together submerge more than 22,000 hectares of land, including nearly 7000 hectares of forests, lakhs of trees and more than 750 hectares of Tansa Sanctuary. They will affect a minimum of 100,000 tribals who depend on the forests and their ancestral lands for livelihoods. These dams include Kalu, Shai, Balganga, Susari, Khargihill, Bhugad, Pinjal, Gargai, Middle Vaitarna, Barvi and Poshir, among others. These are in addition to the dams already constructed for MMR water supply.

Tribals and other affected groups of Thane and Raigad region have been strongly opposing these projects. Most people in Mumbai seems unaware of their struggles or impacts of these projects.

Most of these dams are escaping the social and environmental impact assessments and management plans, environment clearance requirements, environmental monitoring or public consultations due  to blunders in environmental impact assessment notification of Sept 2006, which excludes domestic and industrial water supply projects from environmental clearance process.

MMR has not done any sort of options assessment before pushing these projects and cursory review show that many options exist. At the city or Region level, there is no shortfall in water supply currently and the existing problems are due to inequitable, non-transparent, non-participatory and wasteful water governance in MMR. Municipal corporations under the MMR which are pushing new dams do not treat even 15% of their sewage. Bhiwandi Nizampur & Vasai Virar Corp do not treat ANY of their sewage. The Mumbai Region has no estimate of its rainwater harvesting potential, and there is little effective action in this direction despite high rainfall. Water supply and distribution losses are over 30%. Local water sources like rivers, lakes and wells are being destroyed by pollution and encroachments. There is no interest in democratizing governance of MMR water sector.

We urge the MMR region to address these issues first, which would lead to sustainable water supply to the city and suburbs. Konkan Irrigation Department which is constructing most of these projects has violated several laws related to tribal and forest rights, environment, forests and resettlement and has been mostly favoring a single contractor, illegally.

We strongly urge the MMRDA, MCGM, Municipal Corporations of MMR, Maharashtra government, Union Ministry of environment and forests, Maharashtra Forest Department, National Board of Wildlife and all others concerned to ensure that following steps are taken up urgently and in a credible way:

  1. Undertake thorough options assessment for Mumbai’s (and also same for other cities of MMR) water needs which includes groundwater use, local water sources, rainwater harvesting, sewage treatment and reuse, water supply efficiency, etc.,
  2. Undertake Environmental and Social impact assessments for all the dams coming up for Mumbai Region
  3. Take immediate action against KIDC for violating multiple laws while bulldozing ahead with projects and MMRDA for funding projects in the absence of clearances
  4. Respect peoples protests and Gram Sabha resolutions against displacement, deforestation and their refusal to give permission for these projects
  5. Take strong penal action against the officers and the contractors who have displaced Adivasis illegally
  6. Not to resume any work or planning for any project before the above is done, stop work on projects in the meantime.
  7. Change the EIA notification to ensure that all large dams are included for environment clearance, public hearings and EIA requirements.
  8. Immediately institute a credible Cumulative Impact Assessment of the projects already constructed and advanced in implementation.
  9. Institutionalize decentralized, democratic governance of water sector in MMR from bottom to top.

 

Forests in the Western Ghats are Mumbai’s and MMR’s lungs. They are the watersheds of rivers and water sources like Tansa and Bhatsa and naturally purify Mumbai’s & MMR’s drinking water.

Rich tribal culture of Thane and Raigad is a shared heritage of Mumbai and we have no right to displace the tribals or destroy their livelihoods.

Stop this destruction in Mumbai’s backyard.

Indavi Tulpule (indavi62@gmail.com), Shramik Mukti Sangathana, Thane;

Surekha Dalvi, (surekhadalavi@yahoo.com) Shramik Kranti Sangathana: Raigad;

Brian Lobo, (brianlobo6@gmail.com) Shramik Kashtakari Sanagthana: Dahanu;

Prashant Sarkhot, (loksangramsamiti@gmail.com)Shai Dharan Viroddhi Samiti,

Sitaram Shelar (sitaram.shelar@yuvaindia.org) YUVA, Mumbai;

Janak Daftari (daffy@jalsangrah.org), Jal Biradari, Mumbai

Shripad Dharmadhikary (manthan.shripad@gmail.com), Manthan Adhyayan Kendra, Pune

Parineeta Dandekar (parineeta.dandekar@gmail.com, 09860030472), SANDRP, Pune

 

Dams

Note on Short film on Uttarakhand Flood Disaster

Uttarakhand Flood disaster, June 2013:

A Short film on: Role of Dams in Uttarakhand Flood Disaster

Return of Ganga, SANDRP and VAMTAM has produced a 12 minutes film Flood Ravage and the Dams of Uttarakhand (Uttarakhand Flood Disaster – June 2013), available in Hindi and English.

In June 2013, the state of Uttarakhand, nestled in Western Himalayas in Northern India faced its worst flood disaster in recorded history. During the disaster and after, both electronic and print media, in English and local languages played an important role in highlighting the manmade nature of this disaster. Some of the man-made facets include the climate change, callous administration with zero disaster preparedness or response and haphazard, coupled with unregulated and unscientific infrastructure building in fragile and vulnerable ecology of the Himalayas and the upper GangaRiver Basin. The building of huge road network, tourism onslaught & infrastructure and hydropower projects, neglecting the disaster vulnerabilities of the region was generally talked about.

This short film tries to give an idea of the role played by existing and under construction hydropower projects in the disaster. It presents information, photos, maps, videos, google images and voices of the affected areas and people in the context of hydropower projects. It contains photos of the dams and tunnels of the hydropower projects before and after the disaster. It provides some first hand accounts of the impacts of hydropower projects on communities. While climate change was a trigger for the disaster, the role played by the blasting, tunneling, damming and deforestation, related to hydropower projects was significant.

SANDRP and many concerned organisations had collectively written to the authorities to investigate the role of the hydropower projects in Uttarakhand disaster. All these writings and advocacy letters is available at – https://sandrp.wordpress.com/category/uttarakhand/.

However, it was the Supreme Court order of Aug 13, 2013 that clinched the matter, leading now to the constitution of a committee headed by Dr Ravi Chopra. It is hoped that since it is appointed following the orders of the Apex court, it will be able to perform its role independently, and get to the bottom of this issue.

We hope this short film will be useful to all concerned including the media, various arms of the governments in Himalayan region in India and neighbouring countries, academic institutions, judiciary, non government organisations and most importantly, the communities who have suffered in the disaster and who are struggling against the onslaught and impacts of massive hydropower projects being developed all across the Himalayan region. We hope the film helps contribute in our collective efforts so that when such event strikes again (climate scientists are telling us that more such disasters are likely all across the Himalayas with greater frequency and intensity in changing climate), their impacts are not compounded further by destructive hydropower projects.

DVD copies of the film are available from: Marthand Bindana marthand.bindana@gmail.com and SANDRP ht.sandrp@gmail.com.

The film is available at: https://sandrp.wordpress.com/2013/12/16/uttarakhand-flood-ravage-and-the-dams-short-film-english/ (English) and https://sandrp.wordpress.com/2013/12/16/uttarakhand-flood-ravage-and-the-dams-short-film-hindi/ (Hindi).

Comments on the film and contributions towards costs of this film are welcome. Please also help us take the film to wider groups of concerned people.

SANDRP

PS: Also see: http://phoenixuttarakhand.blogspot.in/2013/12/short-film-on-uttarakhand-disaster.html

Dams

Another Hydro fraud: Two small projects on paper, one large project on site

24.75 MW Mouneswar + 24.75 MW Basavanna ‘Small’ Hydel Projects = One large HEP

According to the Ministry of New and Renewable Energy (MNRE), hydel projects between 2-25 MW are classified as Small Hydel Projects (SHPs). These projects are exempt from Environmental Clearance, impact assessment, public consultation or any monitoring from the Ministry of Environment and Forests (MoEF), receive subsidies from the MNRE and apply for Carbon Credits from United Nations Framework Convention on Climate Change (UNFCCC).

Though the concept of encouraging small hydel projects as sources of decentralized energy, also supplying off grid power seem welcome, the happenings on ground are vastly different. As these projects are excluded from environmental governance, there are several examples of fraudulent Small Hydro projects, which exploit the lax governance mechanism to hoodwink all concerned.[i]

One such recurring fraud is showing two separate projects on paper, in order to avoid environmental scrutiny and avail subsidies meant for SHPs, while building one single big dam on site, clubbing the two projects. Projects like Perla and Shemburi by Greenco in Mangalore or Maruthi Gen projects in Sakaleshpur (http://www.dnaindia.com/bangalore/report-maruti-power-gen-s-hydel-project-an-environmental-disaster-1617237), all in Karnataka Western Ghats, are two example of this fraud.

One more case has now come to light, this one from Gulberga district in north Karnataka when I visited the project area recently. Although called by two different names, 24.75 MW Mouneswar Small Hydel Project and 24.75 MW Basavanna Hydro Project are operating from a single dam/diversion weir across the KrishnaRiver, just downstream Narayanpur Dam. As such, the project should be considered as a single 49.50 MW hydel project and should undergo immediate environmental, social and legal scrutiny and further assessment. We tried to conatct the officials of the company several times for questions related to the projects, but we got no response.

The Projects:

24.75 MW Mouneswar and 24.75 MW Basavanna SHEPs are built across river Krishna in Benchagaddi village of Shorpur taluk of Gulberga district in Karnataka.

The projects have also applied for Carbon credits under the United National Framework Convention on Climate Change (UNFCCC). Basavanna Hydro Project has been registered as a Clean Development Mechanasim (CDM) project with the UNFCCC on 28th December 2012 and its crediting period has been fixed as 1st March 2013 to 28th February 2023[ii]. 24.75 MW Mouneswar SHP has applied for registration[iii]. SANDRP has sent comments against registration of this project.[iv]

Shockingly, both projects have requested separate registrations, hiding the fact that both will be using the same dam, the same intake/power canal and the same tail race canal.

Project design documents (PDDs) submitted to United Nations Framework Convention on Climate Change Executive Board (UNFCCC – EB) mention the same coordinates as the project location:

Latitude- 16°19’52 “N

Longitude- 76°33’48” E

1
Figure 1. Mouneswara and Basavanna diversion weir_ Google Earth

PDDs of both the projects do not even mention the other project, clearly misleading the UNFCCC. Not only do the PDDs show same coordinates, the lengths of the intake canals are exactly the same at 2771 meters, so are the RCC conduits and penstocks, because we are talking of the same project!

Carbon Credits are supposed to be provided to projects only when they prove beyond doubt that they will be economically unfeasible without such support. However, in this case the expenses of dam, power canal, and tail race tunnel is shared and hence the costs will be lowered, the Internal Rate of Return (IRR) of the projects will be higher than what is quoted in the PDDs and they will be profitable even without additional ‘pocketable’ finance from the UNFCCC in the name of Clean Development! (IRR claimed in the PDD is 9.14% for Mouneswar SHP and 11.38% for Basvanna SHP.)

2
Figure 2. Common Dam/Diversion weir for Mouneswara and Basavanna HEPs. Photo- SANDRP

Same Proponent, different names

Interestingly, project proponents of both the projects are shown to be different in respective PDDs. For Mouneswar Small Hydel Project it is Lakshmi Jalavidyut Limited and that for Basavanna Hydro Project it is Krishna Hydro Energy Limited.  However, the registered office of both these firms is the same! This address also belongs to Penna Cements, Hyderabad, which is a player in Mini hydel projects in Karantaka. Penna Cements and its subsidiary Pioneer Genco already operate two SHPs, each of 24.75 MW capacity across Cauvery in Karnataka.

From the ground

When SANDRP visited the project sites, the officials were hostile to any entry in the premises or even near the site.

3
Figure 3. Dam/Diversion weir . Photo- SANDRP

The dam/ diversion weir built by the projects is inside the KrishnaRiver bed and diverts the water through a power canal which runs approximately 3 kms downstream. The power canal takes most of the water from the river rendering the river dry in lean season.

Farmers told power canal as irrigation canal:

When I talked with the farmers in the downstream, they told me that they were under the impression that this canal is meant for irrigation, like Narayanpur Dam canals in the upstream (about 26 km). However, Benchagaddi village which is situated next to the tail race canal of the project not allowed to take even its drinking water from the canal.

There have been strong protests from the villages to this project as the diversion has dried the river bed and more than 300 irrigation pumps of villages like Bechagaddi, Hosur and Yedalabhavi used for irrigating paddy are now useless. Karanataka Bhagya Jal Nigam had also taken serious exception to the projects and had ordered a stop work notice.[v]  (It subsequently issued an NOC, without providing any resolution to the issues raised by it earlier.)

The Benchagaddi village which is right next to the power canal experiences power cuts lasting 18-20 hours daily. Around 40 farmers from this village lost their lands for the canal. Rates of compensation given were Rs 25-85 thousand per acre.

Shockingly fraudulent Local Stakeholder Consultations!

The projects have claimed to have organised ‘Local Stakeholder Consultations’ about the CDM mechanism, which is mandatory when applying for CDM credits. PDD claims that Mouneswar project organised stakeholder consultations on 21st December 2011 and Basavanna project organized it on 26th September 2011.

Now see this, both PDDs mentions exactly the same people asking exactly the same questions with exactly the same answers being given!! It is absolutely clear that these meetings and these reports are fake. Amazingly, UNFCCC could not see through this clear fraud.

Local Development through Small Hydels?

As per the villagers, affected families were promised a job in the power plant although none of them received any jobs there. Even the JCB and truck operators are from other states. Security guards too aren’t from the same village.

Figure 4. Area submerged upstream of the dam or diversion weir
Figure 4. Submergence area in the upstream of the weir
Figure 5. Tail canal near Benchigaddi village and the construction work of power house (Source: Google Earth)
Figure 5. Tail race canal near Benchigaddi village and the construction work of power house (Source: Google Earth)

Unaddressed impacts of Submergence:

In Geddamari village near the diversion weir, around 15-20 families lost their lands for construction of the dam. Bill collector (Talathi) of the village told SANDRP that around 50 acres of land was SUBMERGED due to dam (diversion weir) construction. He further added that farmers whose lands were submerged, have not received the compensation as yet. They have been talking with the company and have been verbally promised some compensation, though nothing on paper. Problems in this village too are like Benchagaddi village. Limited drinking water, disturbed power supply etc.

Figure 6. Power houses near benchagaddi village. Photo- SANDRP
Figure 6. Power houses near Benchagaddi village. Photo- SANDRP

Applicable for Environmental Clearance:

As the projects use a single dam and are a single project of 49.50 MW and they qualify for a full environmental clearance process, including an EIA, public hearing, and Environmental appraisal by the state or central EAC and an Environmental Management Plan. However, the projects have illegally escaped all this.

Executive Engineer of Krishna Bhagya Jal Nigam (KBJN) – controlling state authority in case of Krishna River- confirmed, “Both the projects are operating using the same weir .The power houses of two projects are housed behind the same diversion weir. There are three 8.25 MW turbines for each of the projects situated downstream of the same diversion weir.”

According to the Executive Engineer, KBJN has granted NOCs to both the projects and that both of them being fully operational for last 6-8 months. When SANDRP visited the project site, the HEPs were found to be fully operational.

Conclusion:

24.75 MW Mouneswara and 24.75 Basvanna Projects are operating from the same diversion weir, use the same intake canal and same tail race. They are in fact one single project which has fraudulently shown itself as two separate projects. The proponent and the consultants have hidden this fact from the UNFCCC, the MoEF, the MNRE, KREDL, State Pollution Control Board and State Environmental Department. The Local Stakeholder Reports of the projects are a sham. Submergence impacts are still unaddressed.

These issues need to be addressed urgently by all concerned including the MoEF, the Karnataka Government, UNFCCC, MNRE and KREDL. Such frauds are giving a bad name to the all these institutes.

-Damodar Pujari (damodar.sandrp@gmail.com) with inputs from Parineeta Dandekar


Dams

Kasturirangan Report – a blueprint for political polarization in Kerala?

Guest Post by Dr. Latha Anantha, River Research Centre, Kerala

Possibly for the first time in the history of Kerala, a hartal led by the unlikely combination of a powerful section of the Church and the Left Democratic Front has rejected both the Western Ghats Panel Report (WGEEP) and the High Level Working Group Report (HLWG) claiming it as anti farmer. On November 18, 2013, the LDF and its supporters called for a state wide bandh which brought normal life to a standstill. Thousands of protestors took to streets, mainly from Idukki and Wayanad Districts. Events that are unfolding in Kerala hold significance for the entire country. Firstly it reveals the extent to which forces are trying to decide the fate of a common natural heritage like the Western Ghats through short sighted political means. Secondly it reveals the lack of democratic process by which the people of a region as diverse and ecologically significant as the Western Ghats are not taken into confidence by the Governments while introducing a new governance process. Thirdly the Western Ghats and the two reports on it has become the oven hot political weapon in an election year for Kerala.

Closed shops in Wayanad during the strike. Photo: Deccan Chronicle
Closed shops in Wayanad during the strike. Photo: Deccan Chronicle

Violent responses

The incidents of violence and destruction of public property started off with the issuance of directions by the MoEF on the 13th November 2013 under Section 5 of the Environmental Protection Act 1986. Kannur and Kozhikode districts witnessed widespread violence on the 15th November. Forest offices, government vehicles and public transport buses were set fire by the angry mob in several places in North Kerala[1]. The High Range Protection Council led by the Roman Catholic Church organised a 48-hour road blockade under the banner ‘occupy the streets’ at Kattapana the district headquarters in Idukki district on the 18th ad 19th of November. In fact the Wayanad MP Sri M. I Shanawas called on Mrs Sonia Gandhi in New Delhi along with Bishop Remigius Inchananiyel of Tharamassary Diocese, patron of the resistance group spearheading the campaign in north Kerala, to convey the anxieties of the people.[2] Not a day has passed since 14th November, 2013 when the discussions over the two reports have not taken over the prime time news hour in the television channels of Kerala. The debate continues.

Why the hue and cry?

The MoEF directions and the subsequent Office Memorandum (OM) dated 16th November both reiterate that the MoEF has accepted the High Level Working Group report on Western Ghats, headed by Dr. Kasturirangan ‘in principle’. It also explicitly means that the MoEF has rejected the Western Ghats Expert Ecology Panel Report under the chairpersonship of Prof. Madhav Gadgil, though the OM makes absolutely no mention of the WGEEP Report!

Plantations in Neliyampathy ESA Photo: Author
Plantations in Neliyampathy ESA Photo: Author

Atleast 123 villages in Kerala will fall within the ESA (natural landscape). The category of development activities banned in the ESAs are restricted to mining, quarrying and sand mining, thermal power plants, red category industries, building and construction projects of 20,000 sq.m and above.

The watered down HLWG report and the OM does not contain any clause which would force the farmers of Idukki and Wayanad districts out of their land as alleged by the agitators. Clearly farmers would not resort to hooliganism of the kind which was perpetuated in Kozhikode and Kannur. Presently, the sand mining and quarrying lobby hold the largest political clout in Kerala with many political leaders and legislators alleged to be having direct share and ownership over the large granite quarries operating in the heart of the Western Ghats districts. More and more farmers in the mountains are selling their land to quarry contractors. Now this is something which can become difficult if the restrictions are imposed. As somebody was remarking in a bus my friend was traveling in, ‘if mining stops, the JCBs will have to be sold at the price of scrap metal, that is the issue”!

Polluted stream in Valparai ESA  Photo: Author
Polluted stream in Valparai ESA Photo: Author

By this time a large section of population including the ruling party legislators in Kerala openly admit that the Kasturirangan panel report is a watered down version of the Gadgil panel report and is not going to bring in much changes in status quo conservation. Meanwhile, the clause (viii – d) on banning township and area development projects with an area of 50 ha and above and / or with a built up area of 1, 50 000 sq.m. shockingly reveals further dilution. The MoEF has gone against the ‘in principle’ acceptance by inserting this recommendation which was not included in both the reports! HLWG report has categorically stated that no more new townships and settlement areas will be allowed in the Western Ghats. This new insertion by the MoEF opens up the space for mining and quarrying in the name of township development within ESA areas diluting the concept and spirit of ESA. Meanwhile many ecologically sensitive areas have been left out of the HLWG report which will be opened up for mining and other development.

Baseless rumours are being spread over how the report will affect the high range population! Allegations are now reaching ridiculous levels include, ‘The hidden agenda is to convert all the ESAs into forest area in a stage by stage manner; tiger cubs are being introduced into the forest to evict the people; no more new houses will be allowed once the ESAs are declared; no more monoculture plantations in the Western Ghats; all houses in ESAs have to be painted green and lights have to be switched off by 8 pm; so on and so forth are the interpretations led by the church and the political fronts. The people living in the plains are being warned that they will have to bear the onslaught when lakhs of evicted farmers from the high ranges will settle in the plains! To top it all, the revenue department officials are warning people against land registration or land transfer citing that until further directions are given, no land transaction can be carried out in ESA villages!

There are misleading attempts to show that Ecologically Fragile Lands Act EFL Act (2005) and ESA are the same. The EFL Act is a state Act to provide for the vesting in the Government of ecologically fragile lands in the State of Kerala and for the management of such lands with a view to maintain ecological balance and conserving the bio-diversity. Ecologically fragile land denotes any forest land or any portion thereof held by any person and lying contiguous to or encircled by a reserved forest or a forest or any other forest land owned by the government and predominantly supporting natural vegetation. This Act allows the Government to vest such a land from the owner and make it part of the Reserve Forest. It also gives power to the government to evict any person occupying the notified land. The ESA meanwhile comes under the purview of the central Environment Protection Act 1986. It does not entail any eviction or vesting of land by the government or the Forest Department. There is no eviction of farmers entailed in either the WGEEP or the HLWG report. Any news about evictions is politically motivated and baseless.

The concerns and anxieties of the local communities who have made the mountains their home since three generations when a new regulation is being ushered in cannot be ruled out. The distressing state of the Western Ghats calls for stringent protection measures as well. ESA under the EPA (1986) is the best option available wherein conservation can be ensured without displacing people. Meanwhile the other states seem not too perturbed by the decision of the MoEF to accept the Kasturirangan Report. The high population density in Kerala Western Ghats plus the vested interests of the quarrying lobby and the church (which holds large tracts of land in the mountains) could be attributed as the reason for this uproar.

Reparative Measures

The Government of Kerala has meanwhile taken a guarded stance with respect to the Kasturirangan report instead of totally rejecting it. They have assured the people no decisions will be taken in haste. However, the GoK reacted late by stating that they will translate the notification when it is out and hold discussions in each of the ESA panchayaths. In response to the first OM issued on 19th October, 2013 (which was surprisingly cancelled by the MoEF and replaced by the OM on 16thNovember, 2013), the Kerala Government constituted a three member expert committee headed by the Kerala State Biodiversity Board (KSBB) Chairman to seek opinions from farmers’ organisations, environmentalists and people’s representatives from the regions that will be affected once the Kasturirangan report is implemented.  The state also plans to circulate the HLWG report’s Malayalam version to all the 123 villages[3]. Round the clock help lines have been opened by the Kerala Forest Research Institute (KFRI) and KSBB to clarify the doubts of the public. Chief Minister Ommen Chandy has decided to convene an all party meeting to seek opinion from the various political units of the state. The Kerala Pradesh Congress Committee (KPCC) has also constituted a five member committee to seek opinions through district level hearings.

Lapses in democratic processes come with a cost. If the Government had taken the pains to interpret the WGEEP report way back in 2011 when it was published and undergo the above processes, so much politically created antagonism towards the WGEEP report, the destruction of public property and loss of 900 crores to the public exchequer by an uncalled for bandh could have been avoided[4].  The LDF too could have organized discussions and debates on the two reports instead of rejecting both the reports.

Consciousness for the Western Ghats is growing

What was the need to constitute the HLWG by the MoEF? New ideas and governance mechanism takes time to sink in the public mind and the development sectors that are used to work in silos. The MoEF bowed to the pressure from different lobbies and went ahead with the new panel without giving time to the state governments or the people to understand the WGEEP report. And not surprisingly the HLWG panel digressed from its ToR and came out with a status quo report. Hence the pro Athirappilly project lobby is happy with the HLWG report. While the WGEEP report had totally rejected the Athirappilly project, the HLWG has given space to the Government to revaluate the project and take it up with the MoEF if needed.

Is the Western Ghats Ecology Expert Report (WGEEP) sent for a burial? The MoEF seems to have done so. But many in Kerala where the maximum opposition to both the reports came in, think otherwise. The dots are growing into a network of like-minded groups and individuals who believe the Gadgil report should be accepted and not the HLWG. There is increasing realization that the WGEEP report has mooted a completely new system of governance based on ecological limits and carrying capacity of a region, democratic decentralization and a futuristic perspective of inter-generational equity. While recommending sanctions and regulations, the process is intrinsically democratic where discussions and decisions about the wise use of natural resources have to be made by the local communities. Not surprisingly even the media discussions start with the HLWG report and end up supporting the WGEEP report! There is still scope for the public to demand with the MoEF that the WGEEP report be implemented after correcting the grey areas. The rest of the Western Ghats states need to take cue from the happenings in Kerala and start a process of democratic discussion with the ESA village communities and different development sectors to avoid future problems that may crop up.  The conflicts and riots have reinforced the conviction that it is time to start a peoples’ movement once again to save the Western Ghats!

Dr. Latha Anantha (latha.anantha9@gmail.com)

OTHER SANDRP BLOGS ON WESTERN GHAT REPORTS:

1. https://sandrp.wordpress.com/2013/04/24/how-much-does-the-kasturirangan-committee-understand-about-water-issues-in-western-ghats/

2. https://sandrp.wordpress.com/2013/05/18/prof-madhav-gadgil-writes-to-dr-kasturirangan/

3. https://sandrp.wordpress.com/2013/07/21/prof-madhav-gadgil-says-empower-the-panchayats-to-protect-environment/

4. https://sandrp.wordpress.com/2013/05/20/comments-on-hlwg-report-submitted-to-ministry-of-environment-and-forests/

Assam · Dam Induced Flood Disaster · Dams

Comments on Scoping Clearance Application of Panyor HEP on Ranganadi River in Arunachal Pradesh

The Arunachal Pradesh government has signed a MoU with Panyor Hydro Power Private Limited, a company based in Hyderabad to construct the Panyor hydro electric project. This will be the second hydroelectric project coming up on the Panyor River which is also known as Ranganadi in the downstream. This project with 80 (2x40MW) MW installed capacity is to be considered for ToR clearance in the 69th meeting of EAC to be held on 11-12 November, 2013.

Salient Features Panyor Hydropower project will be located a Lemma, a village five km upstream of the Yazali town in Lower Subansiri district. The proposed project is 12 km upstream of the Ranganadi dam Stage II with a surface power house on the left bank of the river and a 108 m high concrete gravity dam. This reservoir will cover 7.5 km of the river length. The catchment area of this dam is 1315.50 sq km. The tail race channel will be 300 m long. Total area required for the project is 390 ha. Out of this 42 ha is river area, 25 ha is reserve forest and 323 ha is private land. The total estimated cost of this project is Rs 820 crores which imply that per megawatt cost is Rs 10.25 crores.

First Wave of Flash Flood on June 14, 2008 near N Lakhimpur town, due to excess water released from Ranganadi HEP without prior warning
First Wave of Flash Flood on June 14, 2008 near N Lakhimpur town, due to excess water released from Ranganadi HEP without prior warning

Critical Issues It was surprising to see that even though the project has been on EAC agenda for ToR clearance MoEF website does not have the complete documents for this project. The PFR document of the project was not opening up in the website. Going through the Form I of the project we found several issues which need to be highlighted.

Downstream impacts In regard of the project on the Panyor river it is very important to remember that the catastrophic downstream impacts of hydropower dams in Arunachal, which has been a subject of much debate in Assam, with specific issues raised against the existing 405 MW HEP on Ranganadi. The release of water from the Ranganadi dam on June 14, 2008 had led to flash floods in a vast area and catastrophic devastation in the downstream. The Ranganadi dam is having severe downstream impacts not only in the Ranganadi valley, but also in the Dikrong valley since water from this dam is released in Dikrong or Pare River through an 8.5 km long diversion tunnel. Now construction of another dam on the same river which needs serious analysis since the Form I (p 45) states “Downstream impact on water, land, human environment due to drying up of the river at least 10 km downstream of the dam.”

The drying of the river for at least 10 km downstream of the proposed dam also need to seriously examined keeping in mind the reservoir spread of the Ranganadi stage I project.

Not a single village affected and no rehabilitation? Form I (p 33) states that not a single village would be affected and no rehabilitation needs to be done, which seems doubtful. The document at the beginning states that the project is located near Lemma village. It also suggests for socio-economic impacts where it mentioned about project affected families. These are serious contradictory issues within the same report and the developer should be asked to resolve this.

Environment Flow contradictory The Form I provides contradictory information regarding environment flow. On the last page, the document states “A scientific study shall be done to assess the downstream requirement of water to decide minimum assured release of water (Environmental Flows) for maintaining the aquatic ecology and water quality of river.” But on page 33 in the section 2.7 the document states that environment flow will be 3 cumecs.

Important aspects left out from scoping of EIA study In the scoping for EIA/EMP study there are several important aspect which the Form I has made no mention at all. These include:

1. Impacts of excavation and mining

2. Impact of the project on landslide and other disaster potential of the area and region.

3. Disaster management plan considering the previous flash flood event in June 2008.

4. Impacts of climate change and impacts of the project on local climate

5. Options assessment including potential of micro hydro (below 1 MW capacity)  projects. The project will submerge a huge 312 ha of land. The PP (Project Proponent) should look into the options for run of river project rather than a dam with such huge submergence.

Wrong answers given in Form 1 In case of some of the information given in the Form 1, it seems wrong and the PP should be asked to correct it. For example (this is not exhaustive list):

1. In case of point 1.26 (p 11), in response to question “Long-term dismantling or decommissioning or restoration works?”, the Form says “No”. This is clearly wrong. After the useful life of the dam, it will need to be decommissioned and this has to be part of the EIA and TOR.

2. Similarly answer to question 1.27 (“Ongoing activity during decommissioning which could have an impact on the environment?”) is wrongly given as No.

3. In para 1.2 (p 6) there is no mention of land requirement for mining material for the project like sand, gravel, boulders, etc.

4. Para 2.2 (p 12) how much water will be used (KLD) or source is not given.

5. Para 2.3, in answer to minerals No is given, where as the project will require sand, clay, gravel, boulders, etc.

6. In response to Para 2.7, the impact of project on aquatic biodiversity, including fisheries should have been mentioned.

7. In response to Para 3.1 use of explosives is admitted. However, it should be told to PP to minimize the use of explosives considering the impact of them on increased landslides and other disasters.

8. In response to Para 3.3 the PP should have mentioned the impact of project on the people who also use the forests, rivers, get affected by other aspects including destruction of biodiversity including fisheries upstream and downstream.

9. In para 4.2 (p 16) and elsewhere, estimate of 1000 populations for “400 technical and labour staff” is clearly wrong. Also estimate of 200 labour vs 150 technical staff also do not seem correct.

10. Para 4.3 should also include the remains of explosives among hazardous waste.

11. Para 5.8 (p 19) answer (Q: Emissions from any other sources) No is clearly wrong, the reservoir covering 312 ha will certainly emit methane needs to be assessed.

12. In para 8.3 (p 22) and point 12 under environmental sensitivity (p 25-6) the vulnerability due to floods and landslides such others also need to be mentioned and response to them included.

13. The whole document keeps mentioning 25 ha forest land without inclusion of the community managed forest land in Arunachal Pradesh. This is clearly wrong information.

14. Under point 3 in on Environmental sensitivity (p 24) in response to “Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration”, it is not sufficient to investigate with forest dept, as the response says, since there are several aspects here (e.g. aquatic biodiversity) that are beyond the domain of forest department.

Cumulative Impact Assessment The information given in para 9.4 (p 24) is clearly wrong. There are at least eleven hydropower projects at various stages in the combined Ranganadi-Dikrong basin, including one operating, one under construction, three TOR approvals given and five additional MoA signed (in addition to the proposed project), see details below:

1. 405 MW Ranganadi HEP (Existing, transferring water from Ranganadi to Dikrong)

2. 110 MW Pare HEP (under construction)

3. 60 MW Par HEP on Dikrong (TOR approved by EAC on 8/9/2012)

4. 60 MW Dardu HEP on Dikrong (TOR approved by EAC on 8/9/2012)

5. 66 MW Turu HEP on Dikrong (TOR approved by EAC on 8/9/2012)

6. 25 MW Adum (Upper) Panyor HEP: Upfront premium and application fee of Rs 11.05 lakhs received by Arunachal Pradesh government from BSS Arunachal Energy Development Pvt. Ltd. (on 10/03/2010)[1]

7. 21 MW Panyor Lepa Middle HEP: Upfront premium nad processing fee of Rs 9.4 lakhs received by Arunachal Pradesh Government from JMD Power Solutions Pvt, New Delhi (on 27/08/2010)

8. 25 MW Papumpam HEP: allotted to: Meena Entrade and Engineering Pvt. Ltd. Naharlagun, AP. on 19/08/2008[2]

9.  15 MW Papum HEP: allotted to Patel Tours and Travels (Mumbai) on Dec 12, 2008

10. 12 MW Poma HEP: allotted to Patel Tours and Travels (Mumbai) on Dec 12, 2008

Hence a credible basin study is required BEFORE any more (including Panyor) projects are considered in Ranganadi-Dikrong basin.

Costly Project Per MW cost of this project will be Rs 10.25 crores according to current estimates. This will be costly affair considering that per MW cost of solar PV project would be lower than this.

Until the above issues are resolved, the project should not be considered for Scoping clearance.

 

Himanshu Thakkar (ht.sandrp@gmail.com) & Parag Jyoti Saikia (meandering1800@gmail.com)

——————————————————

Annexure: Panchayati Raj Institutions question the project

http://www.arunachaltimes.in/archives/ju09l%2012.html

July 12, 2009

PRIs question Govt on power project

ITANAGAR, July 11: Panchayat leaders of Pistana and Yachuli circles of Lower Subansiri district have voiced their protest against coming up of Panyor Hydro Electric Project, which they claimed was ‘kept secret’ from the public.

In a representation to the Chief Secretary yesterday, the PR leaders led by Zilla Parishad Chairperson Likha Tongum said that  Panyor Hydro Electric Project came to light when M/S Raajratna Energy Holdings Private Ltd of Shimla, started surveying and investigation works in the area. They urged the Chief Secretary to cancel the MoA signed with the private company immediately in the interest of local sentiments.

To the surprise of the people of the area, MoA to this regard was already signed between the govt and the company on February 25 last for implementation of the 80 MW project on BOOT basis for which an amount of Rs 80 lakhs (at Rs 1 lakh per MW) as processing fees was already paid in the name of the Secretary Power, Govt of AP. The grass-root leaders alleged that the whole process was carried out secretly and kept under wraps.

They leaders further came down heavily on the agency for “totally undermining the project affected panchayats”.  

If any agency wants to tap the natural resources available, they have to take the confidence of at least the local panchayat leaders, which is a normal procedure in a democratic setup, the leaders said.

“The local panchayats are the sole custodian and owner of natural resources in the region since time immemorial,” the leaders said and have decided to protest against the execution of the project.

Dams

Gujarat is taking up massive project in ecosensitive zone in the middle of the river without impact assessments or legally mandatory clearances

Letters have been sent by some eminent citizens and activists of Gujarat to the Union Ministry of Environment and Forests and Gujarat Environment Impact Assessment Authority that the massive Gujarat Project of setting up world’s tallest statue is being taken up by the Gujarat government without social or environmental impact assessment, without necessary public consultation process and without clearance under the Environment Protection Act 1986, Environment Impact Assessment of 2006 and also wildlife protection Act of 1972. The necessary permission from the Environment and Rehabilitation Subgroups of the Narmada Control Authority has also not been taken, nor have the party states been taken into account. The Tourism project involves massive constructions in the middle of the eco-sensitive river, just 3.2 km downstream from the Sardar Sarovar Dam and Shoolpaneshwar Sanctuary. Given below is the letter to sent to the Union Minister of State (Independent Charge) Mrs Jayanti Natarajan and secretary, Union Ministry of Environment and Forests. Similar letter has gone to Secretary, Union Ministry of Water Resources since he is the ex-officio chairman of the Narmada Control Authority. Another letter has gone to the Gujarat state EIA authority and concerned state government agencies.

Considering the importance of this issue, SANDRP is happy to share it on our blog, SANDRP Coordinator is also a signatory to the letter.

7 November 2013

To,

Dr V. Rajagopalan

The Secretary

Ministry of Environment & Forests

Government of India

Paryavaran Bhavan, CGO Complex, Lodhi Road,

New Delhi – 110 003.

Sub:  To seek detailed environmental scrutiny of project called ‘Statue of Unity’ planned inside Narmada River, 3.2 Kms. downstream of Sardar Sarovar Dam and Shoolpaneshwar Sanctuary by a joint venture of Government of Gujarat and a trust – ‘Sardar Vallabhbhai Patel Rashtriya Ekta Trust’ (SVPRET) and to immediately stop all construction activity in the region.

Dear Sir,

We would like to bring to your attention that work on a project that proposes to build the world’s largest statue in the form of ‘Statue of Unity’ near Sardar Sarovar Dam in the river downstream from the dam, just 3.2 km from the Shoolpaneshwar Sanctuary, in eco-sensitive zone and involving massive infrastructure (see annexure) has started work without legally mandatory environment clearance, environment and social impact assessment or any public consultation process.

This is clearly illegal, in violation of the Environment Protection Act, 1986 and EIA notification of September 2006 and a number of NGT and Court orders about such massive kind of construction on the riverbed. On 31 October 2013, the foundation stone was laid for the project amidst huge fanfare and media attention. Tenders have also been floated. Even the work for the Garudeshwar weir, proposed about 12 km downstream of the Sardar Sarovar Dam, began without any social or environmental impact assessment, public consultation and environmental clearance from the Environmental Sub Group (ESG) of Narmada Control Authority’s (NCA).

The website http://www.statueofunity.in/ clearly state the purpose of tourism and involvement of the ‘Sardar Vallabhbhai Patel Rashtriya Ekta Trust’ (SVPRET) to build ‘Statue of Unity’,  3.2 km downstream of the Sardar Sarovar Dam  inside the Narmada River on an islet called Sadhu bet.

The website (http://www.statueofunity.in/execution.html#sthash.N9z6EHIu.dpuf) says:

“A 13km. long water body (pond) will create an excellent tourist spot with available infrastructure on both the banks.

The Statue of Unity is planned to be erected in the river bed on downstream of the main dam in the Garudeshwar Weir pond. A permanent standing water pool in and around the Statue of Unity will be created by Garudeshwar Weir, which will enable boating activity around the statue.” (Emphasis added.)

The estimated cost of the project is more than Rs. 2,500/- corers (Rs 2063 crores is the cost of “DESIGN, ENGINEERING, PROCUREMENT CONSTRUCTION, OPERATION AND MAINTENANCE OF THE STATUE OF UNITY D/S of Sardar Sarovar Dam, Village Kevadia Ta. Nandod, District of Narmada Gujarat State, India” as per tender notice, see: http://www.statueofunity.in/tendernotice.html). The Government of Gujarat website (http://www.statueofunity.in/) clearly state that “A monument, that will not just be a mute memorial like the rest, but a fully functional, purpose-serving tribute that will boost tourism and facilitate development in the surrounding tribal areas” and will involve huge infrastructure as described in the Annexure downloaded from the official website.

The key issues that beg immediate scrutiny is as follows:

(1)   The project clearly needs environment clearance under the EIA notification of September 2006, but has not applied for or obtained the clearance at any stage.

(2)   The Shoolpaneshwar Sanctuary boundary is touching the Sardar Sarovar Reservoir (as a part of the Environmental Protection measures of the Sardar Sarovar Project, the earlier Dhumkal Sloth Bear Sanctuary was extended to meet the reservoir boundaries and is called Shoolpaneshwar Sanctuary.) Since the statute is only 3.2 kms from the Sardar Sarovar Dam, it is certainly near by Shoolpaneshwar Sanctuary.

(3)   The Project involves construction in the river bed and proposed reservoir, close to sanctuary in eco-sensitive zone, and hence will have serious impacts on the ecology and environment. Hence, and EIA and EC is crucial.

(4)   The project will affect the downstream river, its biodiversity, people and livelihoods and other related aspects.

(5)   A comprehensive assessment of the environmental and social impacts of the ‘Statue of Unity’ and its contribution to the cumulative impact of all the projects and activities in the area has not been done.

(6)   The project also needs public consultation, but none has happened so far.

(7)   During the construction of the Sardar Sarovar dam due to hard rock digging, the seismic area already carries the burden of artificial activity in the bed rock and added load in what is deemed geologically fault line area. Public reports on geotechnical and geological studies on the proposed site have raised issues of structural stability as well as safety. This cannot be taken casually by authorities. The seismic hazard analysis claimed to have been done by the Gujarat Government’s in-house “Institute of Seismological Research” (http://www.statueofunity.in/execution.html#sthash.jEBrofSN.dpuf) or the Geological and Geotechnical investigation commissioned to another government institute WAPCOS cannot be considered credible unless peer reviewed and put in public domain.

In view of the above facts on record, we demand that:

  1. Direct the Government of Gujarat to submit application for environment clearance and till that is obtained, not to do any work related to the project.
  2. Direct the Government of Gujarat to immediately stop planned project called ‘Statue of Unity’ and direct them to stop all other activities related to the ‘Statue of Unity’.
  3. Declare the action – of the foundation stone installation on 31 October 2013 for the project called ‘Statue of Unity’ – of the Chief Minister of Gujarat State as illegal, in violation of the EIA notification of September 2006 and the Environment Protection Act, 1986.

We will look forward to your urgent action and also point wise response.

Yours Sincerely,

Rohit Prajapati

[Rohit Prajapati] (rohit.prajapati@gmail.com)

Girish Patel

[Girish Patel] (girishpatel512@gmail.com)

Himanshu Thakkar

[Himanshu Thakkar] (ht.sandrp@gmail.com)

Nandini Oza

[Nandini Oza] (nandinikoza@gmail.com)

Trupti Shah

[Trupti Shah] (trupti.vadodara@gmail.com)

Shripad Dharmadhikary

[Shripad Dharmadhikary] (manthan.shripad@gmail.com)

Lakhan Musafir

[Lakhan Musafir]

Chinu Srinivasan

[S. Srinivasan] (chinusrinivasan.x@gmail.com)

Persis Ginwalla

[Persis Ginwalla] (persis_ginwalla@yahoo.co.in)

Prasad Chacko

[Prasad Chacko] (prasad.chacko@gmail.com)

Rajni Dave

[Rajni Dave] (rajnidave@gmail.com)

Anand Mazgaonkar

[Anand Mazgaonkar] (anandpss@gmail.com)

Swati Desai

[Swati Desai] (swati43@gmail.com)

Krishnakant

[Krishnakant] (tokrishnakant@gmail.com)

Xavier Manjooran

[Xavier Manjooran] (rsss.narmada@gmail.com)

Ghanshyam Shah

[Ghanshyam Shah] (ghanshyam.shah2008@gmail.com)

Mahesh Pandya

[Mahesh Pandya] (paryavaranmitra@yahoo.com)

Saroop Dhruv

[Saroop Dhruv] (saroop_dhruv@yahoo.co.in)

Hiren Gandhi

[Hiren Gandhi] (darshan.org@gmail.com)

Ishwarbhai Prajapati

[Ishwarbhai Prajapati] (iaprajapati@yahoo.com)

Raju Deepti

[Raju Deepti] (jeevantirth@gmail.com)

Deepti Raju

[Deepti Raju] (jeevantirth@hotmail.com)

Amrish Brahmbhatt

[Amrish Brahmbhatt] (amrishdipti23@gmail.com)

Copy to:

The Chief Minister of Gujarat

Government of Gujarat

3rd Floor, Swarnim Sankul-1, New Sachivalaya, Gandhinagar-382 010.

The Chief Secretary, Government of Gujarat

1st Block, 3rd Floor, Sachivalaya, Gandhinagar.

The Principal Secretary, Forest & Environment Department

Government of Gujarat

14th Block, 8th Floor, Sachivalaya, Gandhinagar.

The Member Secretary

Sardar Vallabhbhai Patel Rashtriya Ekta Trust

1st Floor, Block No 12, New Sachivalaya Complex, Gandhinagar – 382 010

Annexure:

Features of the project as per the following links:

http://www.statueofunity.in/statue-of-unity-project-features.html#sthash.9PLgSpZw.dpuf

Stepping UP TO BUILD HIGH. Stepping ahead to THE FUTURE.

The Statue of Unity will be a naturalistic and historically accurate representation of Sardar wearing characteristic garments in a walking pose.

  • The rich bronze cladding on the Statue gives it a marvelous look
  • World’s fastest elevators to keep the visitor’s tour engaging
  • The public three-level base of the Statue – exhibit floor, mezzanine and roof – contains the Memorial Garden and a large continuous exhibit hall that will be developed as a visitor attraction focusing on the contributions of Sardar Vallabhbhai Patel
  • The observation deck at 500ft can accommodate 200 people at a time. The panoramic view from this level will enable visitors to see the beautiful Satpuda & Vindhyachal mountain ranges, the 256kms long Sardar Sarovar Reservoir and the 12kms long Garudeshwar Reservoir
  • Access to the statue is via boat ride (3.5kms)
  • An elaborate Gallery for a massive panoramic view of the World’s largest irrigation dam, the river and the hilly terrain, and an illustrious sight of Arabian Sea
  • A state-of-the-art Underwater Aquarium
  • A large modern canopied public plaza, overlooking the river and the Statue, will have scrumptious food stalls, ornate gift shops, retail kiosks and other visitor amenities

The project would include:

Museum & Audio Visual Gallery:

The Statue of Unity Project will also include a unique museum and audio-visual department depicting the life and times of Sardar Vallabhbai Patel.

  

A Laser, Light and Sound show:

A Laser, Light and Sound show on the efforts of Unification of India.

 

Research Centre:

A research centre dedicated to the research and development of subjects close to Sardar Vallabhbhai Patel’s heart like Good Governance and Agriculture Development. Here, subjects like Water Management and Tribal Development will also be studied and researched.

A Monumental Lift:

A heavy-load open lift with a panoramic view will be built alongside the Statue of Unity. Visitors will be able to rise up to the height of the structure’s head, walk into a viewing gallery and enjoy a panoramic view of the Sardar Sarovar Nigam project and the surrounding region from an astounding height of close to 400ft.

Hospitality & Entertainment:

Refreshment areas like restaurants and recreational spots to make the project area an attractive tourist spot, thus facilitating tourism and employment for the surrounding tribal region.

 

Ferry Services :

The statue and surrounding area will be accessed by special boats to avoid vehicular traffic and pollution

Sardar Patel brought the nation together and this tribute, the Statue of Unity, will bring the country national pride. Plans will be laid for convention and training centres, development and formulation of tourism plan and provision of technical and managerial assistance for bids to invite EPC contract.

 

http://www.statueofunity.in/project-objectives.html#sthash.zDluhmBy.dpuf

PROJECT OBJECTIVES INCLUDE:

  • The project site will be connected with modern connectivity infrastructure such as expressways, improved rail system and helipads
  • Through scientific area planning, clean industries will be located around the project site
  • Research facilities in the area of biotechnology, clean energy and ethnic crafts will generate white collar jobs in this area
  • Location and development of educational institutions in the areas of agriculture, animal husbandry, pisciculture will generate an educational and skill development complex to support economic activity in the region
  • Development of tourism infrastructure to support MICE – Meetings, Incentives, Conferences and Exhibitions; which will generate huge livelihood opportunities for the local tribal population

For Further Details: http://www.statueofunity.in/projectteams.html

For Project Organisation: http://www.statueofunity.in/organization.html

MEDIA COVERAGE:
1. http://ibnlive.in.com/news/modis-pet-sardar-patel-statue-project-yet-to-get-green-panel-go-ahead/433235-3-238.html

2. http://www.hindustantimes.com/india-news/gujarat-s-bid-to-build-patel-s-statue-faces-green-hurdle/article1-1148435.aspx

3. http://www.thehindu.com/news/national/other-states/activists-want-eia-done-on-patel-statue/article5333296.ece

4. http://www.downtoearth.org.in/content/sardar-patel-statue-project-has-no-green-clearance-activists

5. http://www.counterview.net/2013/11/prominent-citizens-of-gujarat-ask.html

6. http://www.dnaindia.com/india/report-sardar-vallabhbhai-patel-memorial-foundation-stone-laid-without-environment-nod-bharatsinh-solanki-1918618

7. http://articles.economictimes.indiatimes.com/2013-11-18/news/44202293_1_environment-ministry-narendra-modi-unity-project

8. http://www.frontline.in/cover-story/a-statue-and-its-cost/article5389185.ece#test