CWC - Central Water Commission

Monsoon 2022: CWC Changing HFLs in Ad-hock Manner

(Feature Image: Pillar with flood level marked on the bank of Yamuna river at Old Railway Bridge level forecast site in Delhi. Source:- Sanchit Khanna/HT Photos)

During monsoon season, Centre Water Commission’s (CWC) carries flood monitoring and forecast work through a network of 332 stations[i] covering 20 major river basins. The stations are comprised of Level Forecast (LF), Level Monitoring (LM) and Inflow Forecast (IF) sites. The LF sites have Warning Level (WL), Danger Level (DL), Highest Flood Level (HFL), date of HFL information while LM sites maintain HFL and HFL date records. At IF sites flood level for respective dams/ barrages with inflow, out flow figures are measured and forecast is issued accordingly.

However, there are plenty of concerns plaguing CWC’s flood forecast and monitoring work across country for years. In this 2022 SW monsoon season, the agency has exhibited one more problematic tendency which exhibits not only its careless approach vis-a-vis keeping accurate information of HFL breach events, but it also seems strange that it realises it has giving wrong HFL level and date information mostly only after crossing the HFL now. 

Continue reading Monsoon 2022: CWC Changing HFLs in Ad-hock Manner
Dam floods

Madhya Pradesh: Collapse of Lateri Stop Dam in Vidisha

(Feature image: Flood water rushing through damaged portion of Lateri stop dam. Source: Hum Samvet)

Portion of a stop dam in Lateri Block of Vidisha district of Madhya Pradesh collapsed in morning hours of Monday, August 22, 2022 amidst heavy rains. The earthen dam is located at Islamnagar near Murvas in Lateri block of Vidisha district. The stop dam in Betwa basin is reportedly built a year ago by forest department. The reason behind the collapse is stated to be heavy rainfall.

Continue reading Madhya Pradesh: Collapse of Lateri Stop Dam in Vidisha
DRP News Bulletin

DRP 220822: Salutes to Vimalbhai

(Feature Image:- Vimal Bhai with a group of villagers in Uttarakhand. Photo: Matu Jansangathan/ The Wire)

It’s very sad occasion. Vimalbhai, who has been tirelessly active on issues related to dams, rivers and environment in Uttarakhand in particular and India in general, left us on Aug 15, 2022 for his journey beyond this world. He was a remarkably dedicated, committed and yet always smiling, simple man with simple needs. His loss is already being felt. May his soul rest in peace and may his friends and family get the strength to bear the loss.

Continue reading “DRP 220822: Salutes to Vimalbhai”
Dams · Yamuna River

August 2022: Yamuna flood reclaims encroached floodplains in Delhi

(Feature Image: RMC plants located in active floodplain of Yamuna at Noida More submerged in flood water on Aug. 13, 2022. Image Credit:- Vikrant Tongad, SAFE)

A much awaited flood spell has flowed through Delhi during August 13-14, 2022. It came after more than two months of south west monsoon. Usually by this time, Yamuna river would have witnessed two or three flood spells in national capital lending a fresh lease of life to one of the most polluted rivers of India.

The small scale flood spell in the river has invaded parts of floodplains under abuse and encroachment by government agencies in open defiance of National Green Tribunal (NGT) January 13, 2015 judgement[i]. Apart from this flood, Delhi stretch of the river has witnessed few more abnormal events in this monsoon season so far.

Continue reading August 2022: Yamuna flood reclaims encroached floodplains in Delhi
DRP News Bulletin

DRP 080822: Why is Centre not taking action against violations, defects of Kaleshwaram Project of Telangana?

(Feature image source: Pratidin News)

Union Water Resources or what is now called Jal Shakti minister Shri Gajendra Shekhawat made a rare and rather interesting statement this week about Kaleshwaram Lift Irrigation Project of Telangana, supposed to be the world’s biggest lift irrigation project, India’s most expensive ever irrigation project. The Union Minister publicly said that the Kaleshwaram project did not have all the clearances, project thus involved violations, and had defects, leading to submergence of three barrages and a massive power house last month. It is not clear if the Union Minister has also written to this effect to the Telangana state government and also taken action against the project. This is because the allegations made by the Union Minister are about such a huge project and are serious in nature.

If the Union Minister has done neither, as seems to be the case, he hope he is doing something on these lines soon. We do not expect a responsible Union Minister not take any action on such an important matter and is only making such statements for public consumption (incidentally, he seems to have made these statements in Karnataka, not in Telangana). Questions will be raised if the Union Minister fails to take such an action.

Continue reading DRP 080822: Why is Centre not taking action against violations, defects of Kaleshwaram Project of Telangana?
DRP News Bulletin

DRP 01 Aug 2022: Dams reduce sediment load in rivers leading to higher coastal erosion

(Feature image: Delta Land Loss Mechanisms. Source Wikimedia Commons)

A new study this week has reminded us what has been known for long. Dams not only store water but also trap the sediment flowing in the river. Whatever smaller quantity of water flow from dams to downstream areas, has much lower or no silt. A lot of that silt was supposed to reach the coast, helping fight against the erosion of the coast due to sea tides and waves. With drastically lower sediment reaching the coasts, higher coastal erosion is the result. While climate change is definitely contributing to the increased coast erosion due to more frequent and higher intensity storms from the sea, the role of dams tend to work as force multiplier in increasing the coastal erosion due to less sediment reaching the coasts from river.

While a new study by a Pune University has highlighted this phenomena in case of Godavari river, peninsular India’s biggest river, this is also happening at most other rivers and where they meet the coasts. As in case of Farakka, closer the terminal dam is to the coast, greater is its effectiveness to trap the river sediment and higher is its contribution likely to be to the increase in coastal erosion.

Continue reading “DRP 01 Aug 2022: Dams reduce sediment load in rivers leading to higher coastal erosion”
DRP News Bulletin

DRP 180722: Polavaram, Kaleshwaram projects damaged, Kadam dam overflowed

(Feature image: An aerial view of the flood-affected areas in Godavari districts on July 15. Photo by arrangement/Deccan Chronicle)

One of the noteworthy feature of the floods in ongoing on monsoon so far has been what is happening around large dam projects, particularly in Central India, Eastern India and Southern India. The Polavaram dam on Godavari river, the largest under construction dam in India, again suffered damage this monsoon as confessed by the Andhra Pradesh Irrigation Minister Ambati Rambabu after his frequent visits to the dam. The dam had suffered damage in 2019 floods and it is still not clear what is way forward and the dam has again suffered damage. This will make the unviable project even more unviable, but the government will continue to sink good money after the massive sunk funds.

The Kaleshwaram project in Godavari basin, the largest lift irrigation projects of India has also faced damages with at least two pump houses with large number of massive capacity pumps getting submerged, and third one partially flooded. The full impact of this damage will only be known after assessment once the floods recede.

Continue reading “DRP 180722: Polavaram, Kaleshwaram projects damaged, Kadam dam overflowed”
Floods

Rivers Breaching and flowing close to HFLs in May-June 2022

In pre-monsoon month of May 2022 and first month of south west monsoon season June 2022, there have been Highest Flood Level (HFL) breach incidents at 5 sites on rivers in North East and North India. The rivers have also touched or missed crossing the HFLs at 6 sites in the region in these two months. This include Kopili river at Kampur Level Forecast (LF) site in Nagaon district of Assam breaching HFL[i] in both  May and June 2022 months and Barak river at Fulertal LF site in Cachar district, Assam narrowly missing HFL breach in May 2022 and breaching the extreme flood level in June 2022.

SANDRP has been tracking the HFL breach incidents during pre-monsoon and monsoon months for past four years. The analysis of such HFL breaches in 2018[ii], 2019[iii] and 2020[iv], May-Sept 2021[v], Oct.-Nov 2021[vi] can be seen on our website.

Continue reading “Rivers Breaching and flowing close to HFLs in May-June 2022”
DRP News Bulletin

DRP 040722: Stalled, delayed, cancelled Hydro in Bhutan

(Feature Image: Stretch of Punatsangchu River that will be diverted through the tunnel when the dam is commissioned Photo: SANDRP)

Puncturing the prevalent notion about India Bhutan Cooperation on hydropower projects, there is news this week (in fact the news on this score has been coming for more than a couple of years, but Indian media seems to be practicing a self-imposed ban on putting out such stories – but that is another story as they say) that hydropower projects have been stalled, delayed, reconfigured, and even cancelled in Bhutan. This is broadly in line with the increasing economic non viability of hydropower projects.

Kuensel, Bhutan’s national newspaper, has reported about such projects quoting the National Council recommendation to the government of Bhutan to expedite the decisions about the stalled projects like the massive Punatasanchchu-I HEP and the Kholongchu HEP. It has also reported that the government of India conveying to Bhutan that India has sufficient electricity supplies, suggesting that the proposed Nu 200 Billion Sunkosh Hydropower project may not have any definite dateline and hence likely to not go forward. The happenings at the geologically unstable site selection for Punatsanchchu project involving India’s Central Water Commission, Wapcos and Geological Survey of India among others is in fact major scandal and how the whole issue has been dealt with so far. The happenings at the Kolongchu HEP being executed by the SJVN (erstwhile Sutlej Jal Vidhyut Nigam Ltd) as the first ever joint venture project in Bhutan in terms SJVN not giving the promised contracts to Bhutanese companies also does not bode well for Joint Venture projects in future. Both Punatsanchchu and Kholongchu HEPs are stalled and delayed for long, increasing the cost of the projects and power from the projects. While all this is broadly in line with increasing economic non viability of hydropower projects, a lot of this can be avoided by increasing transparency and accountability in governance of these projects.

Continue reading “DRP 040722: Stalled, delayed, cancelled Hydro in Bhutan”
DRP News Bulletin

DRP 270622: There are many man made factors behind Assam Floods, Mr CM

(Feature Image:- DDMA, UNICEF and Oxfam have innovated boat-mounted water treatment units to provide life-saving water to the people in need within Silchar & its peripheral areas. Source:- Assam State Disaster Management Authority )

The Assam Chief Minister has called the unprecedented floods in Silchar town along Barak river in South Assam as man-made floods. The reason given is that the breach of embankment along the Barak river in the town was created by some people. It is good to see that the Assam CM Mr Himanta Biswa Sarma has recognised that some of the floods can be due to man made factors. And indeed, investigation followed by action is required in all such cases. But the CM should not limit this to just the breach of Barak embankment or the role of some of the people who may have breached the embankment earlier in May to provide outlet to one of the lakes. The investigation must also look into the role of the water resources department as to why they did not swing into action earlier, both in terms of repair and investigation. .

In fact, according to reports so far, no less than 297 embankments have breached during this monsoon so far already. Many or rather most of them have happened due to systematic neglect and lack of proper maintenance by the water resources department and needs proper investigation and action. There is also an urgent need for assessment of cost benefit and efficacy of the embankments in Assam.

Continue reading “DRP 270622: There are many man made factors behind Assam Floods, Mr CM”