Dams

Dams, Rivers & People: August 17, 2015

HYDROPOWER

UTTARAKHAND: National Institute of Disaster Management asks Govt. to make disaster study must for Uttarakhand hydel projects (17 Aug. 2015) This is good to see, it uses almost the exact language some of us having using since the disaster.

SIKKIM: Lanco in talks to sell Sikkim hydro power project (11 Aug. 2015) The Lanco group confirmed that it is in talks with strategic investors to sell its 500 megawatt (MW) hydro-electric power plant in Sikkim, as part of an effort to consolidate its businesses and reduce debt.

ARUNACHAL PRADESH: Neha Sinha (BNHS) in her article titled A bird, a dam and a belief explores the ethical and environmental aspects intertwined with construction of Nyamjang Chhu dam which will destroy the habitat of the Black-necked crane at Zemithang in Arunachal Pradesh. The Save Mon Region Federation (SMRF), a group spear-headed by local Buddhist Lamas, has challenged the environmental clearance in the NGT. LIFE are the lawyers for petitioners. Sanjay Upadhyay and Raj Panjwani are lawyers for Bhilwara group.

MANIPUR:  Why Manipur is flooded (12 Aug. 2015) Interesting to see Down to Earth sees role of dams in Manipur floods: On the other hand continuing their agitation Mapithel dam affected downstream people hold protest meet (16 Aug. 2015) Joint Action Committee (JAC) for Mapithel Dam Downstream Affected People organized a protest meeting at Tumukhong Village, Imphal East District. The meeting demanded immediate rehabilitation and resettlement of Mapithel Dam affected people in the downstream areas. Also get to see a special news report on 26 years long protest of Chandog village against Mapithal Dam.

Continue reading “Dams, Rivers & People: August 17, 2015”

Dams

Tata Power responds on the issue of Tata dams diverting water from Drought hit Bhima Krishna basin to Konkan, but it is a vacuous, insensitive response

On the 7th August 2015, SANDRP published a Press Release titled “As Krishna Bhima basin farmers in Maharashtra, Karnataka, AP & Telangana face drought, crop failure, Water scarcity, Maharashtra DIVERTED 350 MCM water from the basin & stored another 2535 MCM reserved to release, literally to sea!”[1]. On August 9, 2015[2], DNA, a leading newspaper in Mumbai published a report based on this story as their front page top story titled “Drought? Last month alone Maha govt drained 350 MCM water into sea!” Continue reading “Tata Power responds on the issue of Tata dams diverting water from Drought hit Bhima Krishna basin to Konkan, but it is a vacuous, insensitive response”

Dams, Rivers & People

Dams, Rivers & People: August 10, 2015

HYDROPOWER

NORTH-EAST:ASSAM: Experts warned Centre Govt against rushing through big dam projects  (08 Aug. 2015) Even local BJP leaders are against Big dams in North EAST: “BJP leader and former bureaucrat Chandrakanta Das said that the power-starved Northeast should generate electricity through small and run-of-the-river dams instead of big dams. We need power for development, but that should not come at the cost of our pristine environment. We should explore power generation through small and run-of-the-river dams,” he said.

SIKKIM: Delay in completion of 500 MW Teesta Hydropower Project cost Lanco dearly as lenders prepare for Rs. 2400 crore debt-equity conversion (10 Aug. 2015) Lenders to Lanco Teesta Hydro Power will convert part of their Rs 2,400-crore outstanding loans to the company into 51% equity in the most significant such takeover since the Reserve Bank of India allowed lenders to do so when borrowers fall behind on repayments. A consortium of lenders, including some large private and public sector banks, agreed to convert part of their loans to Lanco Teesta into equity at a recent meeting. Senior executives at a large commercial bank said that close to Rs 780 crore will be converted into equity under the capital market regulator’s formula. This will be the second such instance of a bank exercising its right to acquire a majority stake in an ailing company.

Continue reading “Dams, Rivers & People: August 10, 2015”

Dams

As Krishna Bhima basin farmers in Maharashtra, Karnataka, AP & Telangana face drought, crop failure, Water scarcity, Maharashtra DIVERTED 350 MCM water from the basin & stored another 2535 MCM reserved to release, literally to sea!

(Photo above: Koyna Dam)

Large parts of Krishna basin spanning Maharashtra, Karnataka, Andhra Pradesh and Telangana are facing massive rainfall deficits, drought like conditions and crop failures. The tail-end reservoirs of Srisailam and Nagarjun Sagar are almost empty. Telangana and Andhra Pradesh are already thinking of conserving the available water for drinking water. They are not even thinking of releasing any water for saving the crops in delta farmers. In upstream Maharashtra itself, the Ujani dam has ZERO live storage and perennially dry Marathawada has the highest rainfall deficit. Shockingly, in this very period from July 1 to Aug 6, Maharashtra has diverted more than 350 Million Cubic Meters of water (at most conservative estimates) FROM this very Krishna and Bhima basins to the High Rainfall area of Konkan (it already has had 1467.1 mm rain till Aug 7, 2015) and down to the sea! If this diversion was stopped since July 1, when the signs of severe monsoon deficits in the three states were already there[1], this water would have been available to save crops in lakhs of acres in the river basin, and some of it would have also flowed to Andhra Pradesh and Telangana and water may have been available for saving some crops. Even now these Koyna and Tata dams have 2535 MCM water in live storage that is reserved for diversion to Konkan and to sea, but wont be release for the failing crops across the basin. How can we continue such wasteful use of water in a water deficit basin, at the cost of livelihoods of lakhs of farmers? Even now it is necessary to URGENTLY review this situation and consider stopping diversion of water FROM Krishna basin to sea. This may save crops and livelihoods of lakhs of farmers. Continue reading “As Krishna Bhima basin farmers in Maharashtra, Karnataka, AP & Telangana face drought, crop failure, Water scarcity, Maharashtra DIVERTED 350 MCM water from the basin & stored another 2535 MCM reserved to release, literally to sea!”

Dam Induced Flood Disaster

Damodar Valley Dams role in W Bengal Floods – DVC Dams could have helped reduce the floods, they increased it

As at least 222 blocks of 13 districts of South Bengal suffered massive floods with over 51 lakh people affected and crops on 5 lakh hectares ruined, questions have once again been raised if Damodar Valley Corporation[1] dams played a role in increasing this flood disaster. Available information and the statements of the DVC officials leave no doubt that DVC dams indeed released water into the rivers and this release worsened and prolonged the flood situation in South Bengal. If DVC had held back the water while cyclone Komen was active in the region, bringing heavy rains, then the flood intensity, its impact area and the flood duration could have been reduced. The DVC operators should also have kept in mind that this was high tide period when the rivers’ capacity to drain out the water was significantly lower in the delta area. The DVC dams had sufficient storage capacity to hold this water during the period. However, instead of holding back the water during this crucial period, DVC increased water releases from the dams during the flood disaster. Continue reading “Damodar Valley Dams role in W Bengal Floods – DVC Dams could have helped reduce the floods, they increased it”

Dams

Dams, Rivers & People: August 03, 2015

HYDROPOWER  

NORTH-EAST: ARUNACHAL PRADESH: Mapithel Dam; Social organization demand decommissioning of Mapithel dam (03 Aug. 2015) Asia Indigenous Peoples Pact (AIPP) and Naga People’s Movement for Human Rights (NPMHR) submitted memorandum to the Prime Minister of India Narendra Modi demanding a halt to the construction of Mapithel Dam and immediate decommissioning of the project. A joint statement issued by AIPP Secretary General Joan Carling and NPHRM Secretary General Neingulo Krome said the construction of Mapithel Dam under the supervision of the Government of Manipur directly affects and threatens the several scheduled tribes in the affected districts whose sources of income are land and agriculture. It may be mentioned that when it is commissioned the dam would affect over 8,000 people in 22 villages. http://e-pao.net/GP.asp?src=28..030815.aug15

UTTARAKHAND: Expert Body recommends modification of Uttarakhand hydro projects prevent 2013-like disaster (31 July 2015) An expert body appointed by the Centre to analyze the adverse ecological and environmental impact of hydroelectric power projects (HEPs) in Uttarakahand has told the Supreme Court that comprehensive modification of the projects is required to prevent a repeat of 2013 disaster in the state. In an affidavit filed in the Supreme Court, the Centre said the expert body (EB) had suggested promoters of the six projects– National Thermal Power Corporation (NTPC), National Hydroelectric Power Corporation (NHPC), Tehri Hydro Development Coporation (THDC), GMR and Super Hydro Pvt Ltd—to incorporate a number of safeguards in view of the 2013 disaster. The government said the projects would not be allowed to operate till the companies modify their projects. http://timesofindia.indiatimes.com/india/Uttarakhand-hydro-projects-need-to-be-modified-to-prevent-2013-like-disaster-SC-told/articleshow/48290097.cms

Chief Minister asks industry to invest in small hydroelectric projects (27 July 2015) Chief Minister Harish Rawat today sought help from the PHD Chamber of Commerce and Industry Uttarakhand for investment in small and micro hydel projects in the state. He sought support for 2 MW to 5 MW hydel projects under the policy formulated by the state government. The state is still not realizing how small hydro projects are equally disastrous for sensitive mountains.  In June 2015 SANDRP visit in Yamuna valley highlights how Gangani and Hanuman Ganga small hydro projects have caused irreversible losses to local environment and community people as well.http://www.tribuneindia.com/news/uttarakhand/cm-asks-industry-to-invest-in-small-hydroelectric-projects/110988.html

Continue reading “Dams, Rivers & People: August 03, 2015”

Dams

Dams, Rivers & People: July 27, 2015

HYDROPOWER

Thermal, Hydro Power projects on the blink despite clearances by government (23 July 2015) Power sector is now bereft of capital flow. While thermal power projects might see some respite, hydropower projects continue to fester even after getting all the clearances. This puts a question mark on the claims of the hydro lobby that environment ministry and environment clearances are responsible for delaying the projects. Of the 80 stalled power projects, around 25 are hydro-based. Due to delays, the cost of the project, in almost all cases, has increased manifold thereby inviting regulatory tiff over tariff. NHPC’s Subhansari Power Project remains stalled due to the agitation in Assam. NHPC officials need to be held accountable as to how did they start the work without addresing the downstream impacts issues. Due to their callousness, the cos has doubled and work is stlled for over 3.5 years. http://www.business-standard.com/article/economy-policy/power-projects-on-the-blink-despite-clearances-by-government-115072200024_1.html

JAMMU & KASHMIR:  Baglihar Hydro Electric Power project threatens Doda, Kishtwar (27 July 2015) Baglihar HEP is making life difficult with landslides, floods and additional submergence: “Before construction of dam, rocks were visible on both banks of the river. But when water level increased and became stagnant, rocks are nowhere in sight and water has entered loose soil. The root cause of frequent landslides and sinking of area in Doda districts on both side sides of the dam is stagnant water.”GM Bhat, Geological expert. http://www.tribuneindia.com/…/baglihar-power-pr…/111641.html

Continue reading “Dams, Rivers & People: July 27, 2015”

Climate Change · Dams · Maharashtra

We pushed large dams, not irrigation, this has to change: CM Fadnavis’ Assembly Speech

“Maharashtra has the country’s 40% large dams, but 82% area of the state is rain fed. We have moved away from our vision of watershed and conservation…We did not think about hydrology, geology and topography of a region before pushing large dams everywhere. But this has to change”

These are not the words of an activist or water researcher. This was said by Maharashtra’s Chief Minister Devendra Fadnavis, during Monsoon Assembly Session of Maharashtra on 21st July 2015. Continue reading “We pushed large dams, not irrigation, this has to change: CM Fadnavis’ Assembly Speech”

Dams

Maletha; Battle won but war remains to be fought

Chronicle of an emphatic victory against crushers continued from May 2015 onwards

After hosting two days long workshop on Sustainable Mountain Development (02-03 May 2015) Maletha continued its agitation against stone crushers. The event popularised the villagers’ strength and struggle on wider platform.

On 8th of May 2015, villagers issued warnings of resuming indefinite hunger strike if the govt. failed to take a stand on the issue of stone crushers. A protest march was organized on 15th of May 2015 and two villagers Vimla Devi, head of Mahila Sangrash Samiti and Dev Singh Negi started observing fast on alternate days. Setting 25th May 2015 as deadline for State Govt. to act, villagers again demanded closing down of all illegal stone crushers running in Kirti Nagar block.

Meanwhile referring to High Court Nainital (HCN) April 2015 order, State Govt communicated that firm action will be taken against crusher units violating the stipulated norms. Following that, Commissioner Garhwal (GC) CS Napalchyal visited Maletha. Despite finding one stone crusher belonging to Satyam Shivam Sundaram Company violating environmental norms, he ordered a magisterial probe in the matter. Feeling disappointed by state machinery, Hemanti Negi a village woman sat on indefinite hunger strike on 25th May 2015.

Continue reading “Maletha; Battle won but war remains to be fought”

DRP News Bulletin

Dams, Rivers & People: 20 July, 2015

HYDROPOWER

NORTH-EAST ARUNACHAL PRADESH: Green clearance to Dibang Project challenged in NGT (17 July 2015) The 2880 MW Dibang Multipurpose Project will see construction of a mammoth 278-metre tall concrete gravity dam and it will submerge a vast forest area of 4,577.84 hectares or 45.77 sq km, of which major chunks are community forests. The forest land to be diverted is also a major habitat of endangered species such as tiger, leopard, snow leopard, Himalayan Black Bear, Slow Loris, Himalayan Black bear, Leopard cat and Fishing Cat. http://www.dnaindia.com/india/report-green-clearance-to-country-s-biggest-proposed-hydro-project-challenged-in-ngt-2105267 Continue reading “Dams, Rivers & People: 20 July, 2015”