With work on NHPC Ltd’s 2,000-MW Lower Subansiri hydro power project restarting after a wait of almost eight years, anti-dam organisations led by the All Assam Students’ Union (AASU) and Krishak Mukti Sangram Samiti (KMSS) vowed to launch an intense resistance movement to stop further construction of the project. AASU, in a statement, alleged that work on the Lower Subansiri project at Gerukamukh along the Assam-Arunachal Pradesh border has been started ‘treacherously’, risking the lives and property of people living in the downstream area. AASU said a scientific study on the possible impact of the dam in its downstream areas besides a cumulative impact study must be completed before expediting work at the dam site.