This photo is possibly the worst advertisement for a hydropower project with landslide rocks sitting on top of the dam. A massive landslide has severely damaged the 55 m high dam of the 510 MW Teesta Hydropower Project of NHPC, at 00.20 hours on June 27, 2020. This is a major blow to NHPC, considered India’s premier hydropower company. It’s also a major blow to the propaganda of International Hydropower Association, falsely pushing this very project as an example under IHA’s Hydropower Sustainability Assessment Protocol[i].
NHPC PR on June 28 afternoon said the landslide happened “at Dam Axis on left abutment hill side from a height of about 40 meter from Dam top NHPC Teesta-V Dam at Dikchu, East Sikkim. The access to Dam Control Room (DCR) as well as electrical connection to Dam top was cut-off due to this slide.” The electricity supply was restored about 9 hours later. (https://www.facebook.com/1764846020501239/posts/2689927154659783/)
Continue reading “Landslide in Sikkim damages NHPC’s Teesta V Dam Project”