DRP News Bulletin

DRP 091023: MoEF Panel concerned about impacts of Small Hydro

Continue reading “DRP 091023: MoEF Panel concerned about impacts of Small Hydro” →
DRP News Bulletin

DRP 021023: Why this culture of opaque governance around Joshimath?

Continue reading “DRP 021023: Why this culture of opaque governance around Joshimath?” →
DRP News Bulletin

DRP 260623: National Framework for Sediment Management

A National Framework for Sediment Management is certainly a long standing requirement and any move in that direction would have been welcome. Not only because the sediment accumulation destroys storage capacity of India’s Dams, created at such massive costs. But also because sediment is an integral part of river flow and also very important for the rivers to stop or reduce erosion at deltas. There are other issues related to sediment including creation and disposal of toxic sediment and impact of sediment free water flowing downstream from the hydropower projects.

But we need much more serious and sincere efforts in this direction than what has been suggested in following government press release. The movement on such an important subject is so snail paced, half hearted, non-comprehensive, unscientific and non-sincere that it is not clear how this is going to help.

Continue reading “DRP 260623: National Framework for Sediment Management” →
DRP News Bulletin

DRP 290523: Goa Fights to save Mahadayi River

(Feature Image: Thousands form human chain along Mhadei river to celebrate #MahadaiAmchiMai festival. Source: ToI)

On May 20, 2023 when thousands of people of Goa, Rakhondars (protectors) came out to form a 7 km long human chain to save Mhadei or Mahadayi river, they were not only celebrating Goa’s unique Mahadayi River festival, but were also coming together to declare their resolve save and rejuvenate the River that is lifeline of Goa.

A large number of organizations came together, including Earthivist Collective, Goa Heritage Action Group, Save Mhadei Save Goa front, among many others. It was a unique attempt to reconnect with the river, its history, its soul. The people from all kinds of art forms and all walks of life came together in a state where the connection with the river has always been strong for the people.

One hopes their tribe multiplies and they succeed in saving the river from dam building plans and other river affecting activities. That success will provide an example and impetus for river conservation activities elsewhere too.

Continue reading “DRP 290523: Goa Fights to save Mahadayi River” →
DRP News Bulletin

DRP 220523: Water Options as we await South West Monsoon 2023

(Feature Image: Waster Chest nut cultivators removing weeds from Giri Taal of Kashipur. April 2023)

As we await the onset of South West Monsoon 2023, we would like to highlight the water options stories in lead story here, that includes examples from Ladakh, Madhya Pradesh, Rajasthan, Gujarat, Chennai, among others. It is important to remember these as we need to be ready to welcome and nourish the coming annual bounty that monsoon brings.

It also reminds us the fascination our poets have for this season, particularly the wonderment that Gulzar keeps expressing. In this one of his non filmy poetry “Baarish” he warns:

“Mujhko ye fikr, ke is baar bhi sailab ka paani…

Kud ke utrega kohsahr se jab..

tod ke le jayega ye kachhe kinaare..”

Continue reading “DRP 220523: Water Options as we await South West Monsoon 2023” →
DRP News Bulletin

DRP 150523: Will the govt listen to caveats against Ken Betwa Project?

The following report raises three caveats regarding Ken Betwa River Link Project, among others. Firstly it urges that the substantial impact of climate change on the rivers needs to be taken into account, particularly the need for accurate hydrological assessment. It underlines that the project themselves are accelerating the climate change impact on monsoons as they are reducing freshwater flows to the oceans, which in turn has an impact on the ocean’s thermal and salinity gradients, both of which are drivers of monsoon.

Secondly, it rightly says that the impact of projects on adaptive capacity of areas like Bundelkhand needs to be taken into account. In Bundelkhand, climate adaptation can be harnessed using rain water harvesting, rejuvenation of traditional water systems, less water intensive crops and alternative agricultural practices. Thirdly, the water sharing issues that may worsen with both climate change and big projects, need to be kept in mind while taking up mega projects, particularly its impact on water and other security issues.

Continue reading “DRP 150523: Will the govt listen to caveats against Ken Betwa Project?” →
DRP News Bulletin

DRP 030423: IRENA confirms bleak future of Large Hydro globally

(Feature Image: Graph showing annual growth in hydro power capacity in MW. Source: Rivers Without Boundaries, April 01, 2023)

The annual Renewable Statistics 2023 report from IRENA (International Renewable Energy Agency) says that globally, only 1.6% was added to the hydropower capacity in 2022, that too two thirds in non-democratic China. The capacity added in rest of the world outside China in 2022 was 7.3 GW, lowest figure in last 15 years. Similarly 99% of additional capacity added in pump storage projects in 2022 was in China. The report from IRENA also says that 97% of hydropower finance comes from public or government sources and private sector seems to have little enthusiasm for this sector. The projections for future painted in the report is no better. This is broadly in line with our lead story in DRP News Bulletin last week (dated March 27 2023) painting bleak future of large hydropower projects.

Continue reading “DRP 030423: IRENA confirms bleak future of Large Hydro globally” →
DRP News Bulletin

DRP 270323: Bleak future of Large Hydro

(Feature Image: Anti dam graffiti on the wall of the civil secretariat building in Itanagar, Arunachal Pradesh in July 2022. Source: Social Media)

Large Hydropower projects have bleak future as number of reports this week suggest, including the following Video. The large hydro is not renewable, sustainable or green or people friendly. In fact, it is increasingly seen as invitation to disasters. Much better options exist. In the changing climate situation, the destruction that hydropower projects bring about becomes even more relevant when we need the Rivers, Forests, the biodiversity and less disaster prone options. Earlier our governments see this writing on the dam walls from across the world, better it will be for all concerned.

Continue reading “DRP 270323: Bleak future of Large Hydro” →
DRP News Bulletin

DRP 200323: Time to Focus on Natural Water Storages

(Feature Image: Cover page of World Bank report titled What the Future Has in Store: A New Paradigm for Water Storage)

On the occasion of World Water Day 2023, the United Nation will be organizing a conference (March 22-24) in New York, USA. In its latest report the World Bank has also raised concern over decline in fresh water storages and underlined the need of a new approach for integration of built and natural water storages as a measure to adapt to climate change related water challenges and better management of water resources.

There is no doubt that large parts of the world are facing water scarcity and insecurity from existing and looming threats both from man made reasons and changing climates. Given the omnipresent & increasing shortages of cumulative storage capacity and adverse impacts of built water storages especially big reservoirs and dams; it is time global bodies like UN, World Bank, policy makers and governments at large must focus on conservation and replenishment of natural water storages, which are far better, cost effective options available to address and mitigate ever increasing and evolving climatic threats on human water security and sources.

Continue reading “DRP 200323: Time to Focus on Natural Water Storages” →
DRP News Bulletin

DRP 270223: How much Pump Storage Hydro capacity is required in India?

(Feature Image: State steps up pumped hydro storage projects amid coal crisis. Source: EQ Mag Pro/ May 2022)

On Feb 15, 2023, Union Ministry of Power issued draft guidelines for Pump Storage Projects, inviting comments from stakeholders in 15 days to the email id – hydro2-mop@gov.in. The guidelines say that more Pump Storage Projects (PSPs) are required in view of increasing solar and wind power capacity connected to the grid, to stabilize the grid, store the power to make it available during non-solar and non-wind power hours and for peaking power, reactive power, etc. It describes the PSP as “clean, green, safe, and non-explosive” and “environment friendly” option. No studies or basis are provided for this sweeping conclusion.

Continue reading “DRP 270223: How much Pump Storage Hydro capacity is required in India?” →