DRP News Bulletin

DRP NB 26 July 2021: “Unprecedented rainfall” used to escape responsibility?

(Feature image source: India TV https://www.indiatvnews.com/news/india/monsoon-mayhem-maharashtra-floods-landslides-death-toll-latest-news-721924)

As Maharashtra faced the worst flood disaster of SW Monsoon 2021 in India, we see the phrases like “unprecedented rainfall”, “record breaking rainfall”, “frequent landslides” etc. with increasing frequency along with phrases like climate change floating around. While these are not entirely incorrect claims, these should not be used to escape the responsibility and accountability for failing to either accurately forecast the rainfall or to manage the proportions of disasters, including operation of dams, encroachments into water bodies and water path, not accurately marking locations vulnerable to landslides in landslide prone areas or taking up inappropriate “development” projects in vulnerable areas. All of these factors can be seen at play in disasters this monsoon in Maharashtra, Uttarakhand, Himachal Pradesh among others.

Using such phrases, there is an attempt to escape the accountability or responsibility. This is a culture increasing being propagated by Central Water Commission as they did in Kerala in 2018 and Krishna basin floods in Maharashtra in 2019 as in numerous other occasions. It is known now to everyone that climate change is going to lead to more instances of heavy rainfall that can frequently fall in unprecedented category, but that only means we need to take measures to reduce the damage in such instances, predict them accurately and manage them effectively. That is what the Action Plans for Climate Change and Disaster Management apparatus needs to work on, but we have clearly failed there so far.

Continue reading “DRP NB 26 July 2021: “Unprecedented rainfall” used to escape responsibility?”
Environment Impact Assessment · Ministry of Environment and Forests

Draft EIA 2020 will weaken every aspect of EIA process

Experience of the current Environment Impact Assessment (EIA) process under the current EIA notification of Sept 2006 tells us that the process needs strengthening in every aspect. The Narendra Modi government has now proposed a new EIA notification, whose draft has been made public, strangely during the lockdown period. The draft notification, in stead, proposes weakening of the whole EIA process in practically every aspect. Continue reading “Draft EIA 2020 will weaken every aspect of EIA process”

Dams · DRP News Bulletin

DRP NB 13 April 2020: Check dams revival in Dakshina Kannada

Zilla man, students revive check dams For the first time in decades this February, Sundara Gowda, a 55-year-old farmer in the Dakshina Kannada district, doesn’t have to spend Rs 6,000 to mine water. In the past he has had to hire an earthmover to do the digging because the rivulet that runs by his farm would dry up. This year, to his surprise, the rivulet, a tributary of the Phalguni river, didn’t dry up. Miraculously, it had plenty of water. A check dam had been built upstream at Paldyaru.

The check dam was one of many such structures built by Paljal Dharanendra Kumar, a zilla parishad member from Venoor village, with the help of student volunteers. The check dams have resulted in water in the river rising six feet for a distance of 2.5 km. The river now has 90 million litres of water and rivulets which used to run dry have come back to life. Dharanendra and his student volunteers have been zealously building check dams, called kattas, from December to February. The dams have been built at absolutely no cost to the exchequer.  https://www.civilsocietyonline.com/environment/zilla-man-students-revive-check-dams/  (24 March 2020)

Continue reading “DRP NB 13 April 2020: Check dams revival in Dakshina Kannada”

Dams · Environment Impact Assessment · Expert Appraisal Committee · Himalayas · Irrigation · Landslide · Ministry of Environment and Forests · Nepal · Public Hearing

Who exactly needs the Pancheshwar Dam?

Bolo Jai Jai Baba Bhole”, the Prime Minister Narendrabhai Modi, while speaking at Kedarnath in Uttarakhand in Oct 2017[i], asked the people in audience to chant with him. Indian deity Mahadev, the presiding deity at Kedarnath on the banks of Mandakini river is possibly the closest to rivers and nature among all the deities, as is also clear from his attire. Baba Bhole is one of the many names of this deity. Incidentally, the massive, controversial Pancheshwar Dam a pet project of Mr Modi will also submerge the Pancheshwar Mahadev Temple, where too, the presiding deity is same Bhole Baba. But we will come back to Bhole Baba. Continue reading “Who exactly needs the Pancheshwar Dam?”

Dams · DRP News Bulletin

DRP News Bulletin 04 December 2017 (Protests Against Pancheshwar Dam in Champawat, Pithoragarh, Almora, Delhi)

Protests and controversies around Pancheshwar Multipurpose Project (PMP) are only growing louder and wider. While Expert Appraisal Committee (EAC) Rivers Valley Project in unnecessary hurry considering the project tomorrow (05 Dec. 2017)  http://environmentclearance.nic.in/writereaddata/Form-1A/Agenda/2811201745T4GD5I10thAgendaEACHydro05122017.pdf

Villagers and local groups people also continue raising their concerns and objections against 5040 Mw dam project. Today, scores of villagers, environmental groups including regional political party have protested at Jhulaghat in Champawat, Pithoragarh, Almora and in Delhi demanding EAC to listen to the voices of local people and groups.

Continue reading “DRP News Bulletin 04 December 2017 (Protests Against Pancheshwar Dam in Champawat, Pithoragarh, Almora, Delhi)”

Environment Impact Assessment · Ganga · Nepal · Public Hearing · Uttarakhand

Letter to MoEF’s Expert Committee: Why Pancheshwar Project should not be considered for Environment Clearance

(Above: Protest outside MoEF on Oct 24, 2017 when EAC met to consider EC for Pancheshwar Project)

Oct 23, 2017

To

Chairman and Members, Expert Appraisal Committee (River Valley Projects), Union Ministry of Environment and Forests, Jor Bagh, New Delhi

Respected Chairman and Members,

The agenda of the EAC (for RVP) to be held on Oct 24, 2017, put up on the EC website only on Oct 18, 2017, just six days before the EAC meeting includes the 5040 MW Pancheshwar Multipurpose project (PMP), India’s largest proposed hydropower projects. The agenda should be available at least ten days before the meeting, and this should also be a reason for not considering the Pancheshwar project by EAC for its meeting on Oct 24. Moreover agenda mentions 5600 MW Pancheshwar project, where as the capacity as per EIA is 5040 MW. Is MoEF just callous in mentioning wrong installed capacity or has the capacity gone up? In either case, the 5040 MW Pancheshwar project should not be on EAC agenda. Continue reading “Letter to MoEF’s Expert Committee: Why Pancheshwar Project should not be considered for Environment Clearance”

Dams

पंचेश्वर बॉध की अनुचित, अन्यायपूर्ण एवं गैरकानूनी पर्यावरण जनसुनवाई रद्द हो

Featured Image: Saryu River winding through Pithoragarh by Sumit Mahar, HIMDHARA

This is Hindi version of SANDRP petition submitted to District Magistrate Almora, Pithoragarh and Regional Official, Environment Protection and Pollution Control Board, Uttarakhand pleading them to postpone the unfair and unjust public hearing of Pancheshwar Multipurpose Project on Mahakali River. The English version of same can be seen here https://sandrp.wordpress.com/2017/08/10/cancel-pancheshwar-dam-public-hearings-it-involves-too-many-violations-and-illegalities/

भीम सिंह रावत, सैनड्रप,

we4earth@gmail.comhttps://sandrp.wordpress.com/

पंचेश्वर बॉध पर्यावरण जनसुनवाई, 

अल्मोडा, उत्तराखण्ड, 17 अगस्त 2017 

सेवा में, 

अध्यक्ष पंचेश्वर बॉध पर्यावरण जनसुनवाई, 

एवं जिलाधिकारी, अल्मोडा उत्तराखण्ड

dm-alm-ua@nic.in

  
अध्यक्ष क्षेत्रीय कार्यालय प्रभारी

उत्तराखण्ड पर्यावरण सुरक्षा एवं प्रदूषण निंयत्रण बोर्ड देहरादून, 

dkjoshi21@yahoo.com

आदरणीय पंचेश्वर बॉध पर्यावरण जनसुनवाई अधिकारिक सदस्य दल,  

आज पंचेश्वर बॉध परियोजना की अल्मोडा जिले में तय तीसरी एवं अंतिम पर्यावरण जनसुनवाई, पूरी तरह से पर्यावरण प्रभाव आकलन Environment Impact Assessment (EIA) राजपत्र 2006 के नियमों के विपरीत है। अतः इस जनसुनवाई को निरस्त कर, प्रभावित गॉववासियों से समोचित चर्चा के बाद, भविष्य में यथोचित स्थान पर जनसुनवाई कि जानी चाहिए। 

इस जनसुनवाई को निरस्त करने के अनेक कारणों में से कुछ मूल कारणों को निम्नांकित किया जा रहा है।  Continue reading “पंचेश्वर बॉध की अनुचित, अन्यायपूर्ण एवं गैरकानूनी पर्यावरण जनसुनवाई रद्द हो”

Dams · Environment Impact Assessment · Ministry of Environment and Forests · Ministry of Water Resources · Nepal · Public Hearing

Cancel Pancheshwar Dam Public Hearings: It involves too many violations and illegalities

From: SANDRP,

50-D, AD block, Shalimar Bagh, Delhi 88

we4earth@gmail.com, https://sandrp.wordpress.com/

August 11 2017

To

1. District Magistrate,

Pithoragarh, Uttarakhand

dm-pit-ua@nic.in

2. Chairman/ Regional office incharge,

Uttarakhand Environment Protection and Pollution Control Board,

Dehradun, dkjoshi21@yahoo.com

COPY to: 1. IA Division (River Valley Projects) MoEF, Delhi

2. Chairman and Members of Expert Appraisal Committee on River Valley Projects

Respected Members of Public Hearing Panel for Pancheshwar Dam,

The public hearing now being conducted for the massive Pancheshwar Dam at Pithoragarh today, as part of the requirement under the EIA notification of Sept 2006 is being held in complete violation of letter and spirit of many norms of the EIA notification. Hence these public hearings should be cancelled. They should be rescheduled after appropriate conditions are achieved for the public hearing. Some of the key reasons for this are listed below, but these are not exhaustive reasons, but only a list of key indicative reasons. Continue reading “Cancel Pancheshwar Dam Public Hearings: It involves too many violations and illegalities”

Dams · DRP News Bulletin

DRP News Bulletin 24 July 2017 (Pancheshwar Dam Public Hearing Needs To Be Postponed)

In the middle of monsoon season, authorities have fixed August 7, 11 and 17 as public hearing dates for the Pancheshwar Dam project, a giant dam on Mahakali river at India Nepal border. The proposed dam will submerge 134 villages in Pithoragarh, Champawat and Almora districts. http://www.tribuneindia.com/news/uttarakhand/public-hearing-dates-for-land-fixed/437736.html

The public hearing is happening, when media news reports have widely revealed that villagers have not been informed properly. Many to be affected villagers have even said that they have no information regarding the public hearing. http://timesofindia.indiatimes.com/city/dehradun/ngo-seeks-postpone-of-pancheshwar-dam-hearing/articleshow/59727412.cms  Social media reports, too have disclosed that the state govt has disseminated no relevant information regarding Pancheshwar dam public hearing. https://www.facebook.com/pg/dev1bhoomi/posts/?ref=page_internal

The Environment Impact Assessment (EIA) of the project is incomplete and not shared with villagers in affected area in local language. On the contrary the environment ministry has waived off the requirement of a joint mechanism to assess its environmental impact. https://www.masterbuilder.co.in/india-nepal-pancheshwar-project-assessment-guidelines-now-eased/

The public hearing place is far away from the dam site making the public hearing site unreachable for many concerned villagers. It is worth to mention that its monsoon season, the region in landslide affected, several roads are blocked and it’s not possible for the most of the concerned villagers to reach the hearing venue.

20139587_1969050769787030_8371146017204709374_n.jpg

Local people, regional parties, individuals and civil societies groups have been raising concerns on the disastrous impact of second highest dam project of the world.  http://timesofindia.indiatimes.com/city/dehradun/pancheshwar-dam-spells-doom-for-locals-of-130-villages-who-fear-tehri-re-run/articleshow/57561939.cms

Experts’ demand of postponing the meaningless is right. In a democratic system, the concerned authorities must hear the public voices. It is their responsibilities to share all the relevant information in public domain beforehand, conduct the public hearing in each and every dam affected districts instead of just one place. The present weather conditions are not favorable for the public hearing at all and it must be postponed. http://matuganga.blogspot.com/2017/07/23-8-2017.html

Its also beyond understanding that why such a unviable, high impact, risky project is being pushed in a seismically active region is a multi billion rupee question. http://www.firstpost.com/india/pancheswar-dam-uttarakhand-makes-steady-progress-project-to-generate-employment-power-irrigation-3837837.html

HYDRO POWER

Himachal Pradesh Lahaul-Spiti people condemn Jispa dam, demand eco tourism During a public hearing held on July 17, 2017, regarding 300 mw Jispa hydro project, local people of Jispa village have severely criticized the project making it clear that they would not allow the project. Agitated people also forced the officials to leave the meeting without any outcome. It is worth to mention that since 2009, people of Todh valley in Lahaul-Spiti district are opposing the Jispa Dam project proposed over Bhaga river, a tributary of Chenab, at Jispa village. http://timesofindia.indiatimes.com/city/shimla/jispa-dam-locals-demand-eco-tourism-not-hydel-project/articleshow/59665492.cms

As per, Rigzin Samphel Hayerpa, Convener of Jispa Baandh Jan Sangarsh Samiti (JBJSS), hundreds of residents of the affected villages had made it clear to the officials that they would not allow the valley to be ruined in the name of development. He added that merely on the ground that the project was of national importance, destruction of fragile ecology could not be allowed.

Zila parishad member from Kwaring Chhime Lhamo said the state government wanted to construct the dam against the wishes of the local people. She said that from the start the people were against the project but the government was not scrapping it. She also said that development at the cost of destruction cannot be allowed. http://timesofindia.indiatimes.com/city/shimla/meeting-over-jispa-dam-yields-no-result/articleshow/59657026.cms

National There is very interesting discussion with Union Power Minister, which clearly shows that Hydro is no longer viable even with all the additional subsidies the govt is considering.  https://www.youtube.com/watch?v=YaGujdFCwCA&sns=em

Continue reading “DRP News Bulletin 24 July 2017 (Pancheshwar Dam Public Hearing Needs To Be Postponed)”

Chenab · Jammu and Kashmir

Open Letter to J&KSPCB: Cancel Public Hearings for Sawalkote HEP for violations

Above: Title page of Sawalkote EIA Executive Summary

January 14, 2016

TO:

J&K State Pollution Control Board,

Parivesh Bhawan, Forest Complex, Gladni, Narwal, transport Nagar,

Jammu (J&K) Telephone Nos:- 0191-2476925, 2476927

  1. Sh. Abdul Razak, IFS

Chairman, J&K State Pollution Control Board, Mob:- +91-9419188852, chairman87jkspcb@gmail.com

  1. Sh. Vasu Yadav, IFS

Member Secretary, J&K State Pollution Control Board, Mob:- 0194-2311165, membersecretaryjkspcb@gmail.com

  1. Regional Director, Jammu,

J&K State Pollution Control Board, Jammu. Email:  regionaldirectorspcbjmu@gmail.com

Sub: Violations in public hearing for 1856 MW Sawalkote HEP

in Ramban, Udhampur and Reasi districts in J&K

Respected Chairman, Member Secretary and Regional Director,

We understand from J&K SPCB website that the pubic hearings for the proposed 1856 MW Sawalkote Hydropower project is to be held in Udhampur (Village Panchari), Reasi (Village Mahore) and Ramban (Village Tanger) districts at 10 am on January 18, 21 and 28, 2016 respectively. However, we notice a number of problems in this context, some of the key ones include: Continue reading “Open Letter to J&KSPCB: Cancel Public Hearings for Sawalkote HEP for violations”