DRP News Bulletin

DRP: 14 Jan 2019: Will the campaign of 17-yr old Alappad Girl Wake us up to the perils of unsustainable sand mining?

The coastline between Chavara and Alappad in Kollam district of Kerala, has a decades-long story of people’s battle for survival against mining companies. This stretch in Kerala is where the extensive mineral beach sand mining has been happening since the 1960s. The abandoned buildings are the remains of people’s failed agitations and indefinite strikes. One by one the villages in the area are vanishing from the map of Kerala.

Continue reading “DRP: 14 Jan 2019: Will the campaign of 17-yr old Alappad Girl Wake us up to the perils of unsustainable sand mining?”
Water

Uffrenkhal’s Legacy of Recharge Pits Ensures Water Security

Inspiring tale of three villages in Thalisain tehsil (Pouri Garhwal district, Uttarakhand) which have been putting in sustained efforts for years in creating recharge pits, plantation and forest protection that has ultimately resulted in revival of water sources and Gadganga a small stream part of East Nayaar River basin. Continue reading “Uffrenkhal’s Legacy of Recharge Pits Ensures Water Security”

DRP News Bulletin

DRP: 7 Jan 2019: NGT REJECTS FLAWED GROUNDWATER NOTIFICATION

Good to see NGT rejecting the flawed Groundwater notification dated Dec 12, 2018 from CGWA that was also critiqued by SANDRP: https://sandrp.in/2018/12/31/groundwater-governance-why-dec-12-2018-cgwa-notification-would-be-disastrous/. However, NGT should have asked an independent panel to formulate the policy for sustainable groundwater use, rather than a committee of the same government persons. Besides, there is also need for restructuring of currently totally ineffective CGWA and make it COMPLETELY INDEPENDENT of government.

Continue reading “DRP: 7 Jan 2019: NGT REJECTS FLAWED GROUNDWATER NOTIFICATION”
Ganga

East Nayaar River: The Scenic Stream of Ganga in Trouble

The East and West Nayaar rivers[i] of Uttrakhand are small natural streams feeding the National River. They may meet the fate of Ganga and Yamuna, if the current trend damaging them remain unchecked. This pictorial report highlights the plight and beauty of East Nayaar river.  The River is also spelt as NAYAR by a number of documents. 

Degradation of Ganga river and its big tributaries gets adequate attention amongst concerned, while such small natural streams feeding the National River, largely remains absent in the mind and memory of stakeholders.

These perennial streams are making the River Ganga living and flowing in founding basin area. They seem healthy and living, however the problems of dumping of solid and liquid waste, construction debris, road cutting, water abstraction and hydro projects are rapidly catching up with the smaller streams.

Continue reading “East Nayaar River: The Scenic Stream of Ganga in Trouble”

Drought · Rainfall

More bad water news: 2018 Post monsoon rains 44% below normal

Even as large parts of India are facing drought, following deficit North West Monsoon, there is more bad news that farmers already know and experience. The rainfall in the three post monsoon months, from Oct 1 to Dec 31, 2018 at all India level has been 71.2 mm, which is 44% below normal rainfall of 127.2 mm. While the quantum of rainfall in these months is not expected to be high except in some South Indian areas, it is crucial for providing life saving and life sustaining moisture for the Rabi crop. It was particularly important since the second half of the South West monsoon was significantly below normal in large parts of Central and South India[i]. These same areas are experiences biggest deficits in Oct-Dec rains. Continue reading “More bad water news: 2018 Post monsoon rains 44% below normal”

Dams · DRP News Bulletin

DRP: 31 Dec 2018: China Built Ecuador Dam, Advt For What Dam Can Do To River, Environment, Nation & Future

Best Advertisement of What Dam Building can do. Great Expose by NYT: “The dam sits under the glare of an active volcano, with columns of ash spewing toward the sky. Officials had warned against the dam for decades. Geologists said an earthquake could wipe it away. Now, only two years after opening, thousands of cracks are splintering the dam’s machinery. Its reservoir is clogged with silt, sand and trees.

Continue reading “DRP: 31 Dec 2018: China Built Ecuador Dam, Advt For What Dam Can Do To River, Environment, Nation & Future”

Groundwater

Groundwater Governance: Why Dec 12, 2018 CGWA notification would be disastrous

On December 18, 2018, the principle of Bench of the National Green Tribunal, called the CGWA (Central Groundwater Authority) notification gazetted[i] on Dec 12, 2018 as against “national interest”.[ii] The trouble is can we even expect CGWA and their parent, Union Ministry of Water Resources, River Development and Ganga Rejuvenation (MoWR for short) to get us out of the deep murky groundwater pit that we are in today?

NGT rightly asked, can just charging fees regulate groundwater? But it seems the MoWR cannot think in terms of a policy for groundwater, which is what the NGT had asked, not price tag list.

Continue reading “Groundwater Governance: Why Dec 12, 2018 CGWA notification would be disastrous”

Dams · Hydropower

Inquiry into Srinagar HEP Canal Leak Reveals Poor Quality of Construction

The power channel (canal) of 330 Mw, Srinagar Hydro Electric Power (HEP) project has been leaking since December 16, 2018 affecting Surasu, Mangsu, Naur and Supana villagers in Srinagar, Uttrakhand.

Villagers were alarmed when the gushing water started reaching fields, cowsheds and some village homes. They staged a protest and demanded that canal be repaired within three days. Following complains to local MLA Vinod Kandari, a team from Uttrakhand Irrigation Department and Public Work Department (PWD) inspected the affected areas.

dj 17 dec 2018

The Kritinagar SDM Anuradha Pal also inspected the villages and issued notices to Alaknanda Hydro Power Construction Limited (AHPCL) the developer and operator of the project. She also formed three member probe team comprising of Executive Engineers from Irrigation Department, PWD and Revenue official to look into the issue.

Continue reading “Inquiry into Srinagar HEP Canal Leak Reveals Poor Quality of Construction”

Char Dham Highway · Dams

Char Dham Road Project Kills 8 Labours: Will State & Central Govts Wake Up Now?

The landslide incident[i] on under construction Char Dham All Weather Road Project in Rudraprayag district of Uttrakhand has killed 8 labours on 21 December 2018 around 12.30 pm near Banswada in Ukhimath Bhiri area on the Rudraprayag-Gaurikund national highway (NH 107).

Continue reading “Char Dham Road Project Kills 8 Labours: Will State & Central Govts Wake Up Now?”

DRP News Bulletin

DRP: 24 Dec 2018: MoEF & WII’s Compromises for Hydro Interests

In a shocking revelation, Jay Mazoomaar in this Indian Express report exposes how Wildlife Institute of India not only accepted consultancies from hydropower companies, but also diluted the mandate for the studies for given by statutory bodies like NGT, NBWL and FAC, but also provided compromised reports catering to the interests of the hydropower developers, thus trying to clear the way for the two controversial mega hydropower projects, one each in Dibang and Lohit river basins in Arunachal Pradesh. https://indianexpress.com/article/north-east-india/arunachal-pradesh/wildlife-institute-all-for-hydel-projects-in-arunachal-pradeshs-tiger-zone-5499656/

In case of the 3097 MW Etalin project being developed by Jindal and Arunachal Pradesh govt, the IE report says: “the WII was asked by the Ministry (MoEF) to assess the feasibility of the plan that requires 1,166 hectares of forestland in the valley. The Ministry’s move followed a recommendation from its Forest Advisory Committee (FAC) to conduct an environment impact assessment study. Instead, the WII initiated a study to find how the project’s impact on wildlife can be minimised”. Thus instead of doing the mandated scientific impact assessment, the WII initiated a study to minimise the project’s impact.

Continue reading “DRP: 24 Dec 2018: MoEF & WII’s Compromises for Hydro Interests”