The public hearings required for the Ken Betwa River linking project (KBRLP) are to be held on Dec 23 and 27, 2014 at Silon in Chhattarpur and Hinouta in Panna districts of Madhya Pradesh. However, these public hearings violate fundamental legal norms in letter and spirit and should be cancelled and not held till these violations are rectified.
Firstly, the EIA (Environment Impact Assessment) notification of September 2006 clearly states that project EIA and EMP (Environment Management Plan) should be put up on the website of the Pollution Control Board a month before the actual public hearing. However, a perusal of the MPPCB website (http://www.mppcb.nic.in/) shows that the full EIA and EMP are still not uploaded on the website. When I talked with the concerned officers of the MPPCB, they confirmed that full EIA-EMP reports have NOT been uploaded on the MPPCB website.
Secondly, even the executive summary of EIA-EMP Report on the website is put up in such an obscure fashion that it is not possible for any common person to locate it. So I called up the phone number given on the MPPCB website: 0755-2464428. I was then told that I should call 0755 2466735 to talk to Mr Kuswaha about this. When I called Mr Kuswaha, he directed me to call Mr Manoj Kumar (09300770803). Mr. Manoj Kumar told me at 5.15 pm on Thursday, Dec 18 that he was already home and that I should call him at 12 noon next day. He however, confessed that even the executive summaries were not there about 15 days ago! When I called Mr Manoj Kumar next day and succeeded in connecting only after a few attempts, he told me that I need to first click on “Public Hearing” tab (Under EIA notification). On clicking this, one goes to a page with a table displaying various lists entitled List 1, List II, List III and List IV etc. Then one needs to click List IV. On clicking that one will see a list of projects from 469 to 601 and in that you go to project no 594 which is the Ken Betwa Project. There is no mention of the date of Public Hearing here.
I also called up Dr R K Jain (09425452150) at MPPCB regional office in Sagar, under whose jurisdiction Chhattarpur and Panna come to ask about the availability of the full EIA and EMP in soft copies. He said they are available at designated places, but about not being available on MPPCB website and available executive summaries not being properly displayed on MPPCB websites, he said that he is unable to do anything as that is happening from Bhopal.
When I told him that it is impossible for anyone visiting the MPPCB site to find this project and that the current public hearings need to be displayed more prominently, he hung up the phone, saying he has no time to answer such questions! In any case non-display of the public hearing date and executive summary in Hindi and English in easily searchable form is another violation of the EIA notification.
Thirdly, when we go through the Executive summaries in English and Hindi, we see that both are incomplete in many fundamental ways. The Hindi executive summary[1] has completely wrong translations. I could find nine gross translation errors in just first 16 paragraphs. The Hindi translation has not bothered to translation words like monsoon, MCM, PH, LBC, CCA, FRL, MWL, K-B, tunnel in first 16 paras, nor given their full forms. This makes the Hindi translation completely incomplete, wrong and unacceptable.
Fourthly, even the English (& Hindi) version of Executive summary on MPPCB website[2] is incomplete. It does not have a project layout map, sections like options assessment and downstream impacts.
Fifthly, the EIA claims in very second paragraph: “The scope of EIA studies inter-alia does not include water balance studies.” This is a wrong claim since water balance study of the Ken Betwa links establishes the hydrological viability of the project and by not going into the water balance study, the EIA has failed to establish hydrological viability of the project. SANDRP analysis in 2005[3] of the NWDA feasibility study of Ken Betwa Proposal[4] had established that the hydrological balance study in the Feasibility of the Ken Betwa Link Project is flawed and an exercise in manipulation to show that Ken has surplus water and Betwa is deficit. As the collector of Panna district noted in 2005 itself, if the 19633 sq km catchment of the Ken river upstream of the proposed Daudhan dam (comprising areas of eight districts: Panna, Chhatarpur, Sagar, Damoh, Satna, Narsinghpur, Katni, and Raisen) were to use the local water options optimally, then there will not be any surplus seen in Ken river at the Daudhan dam site and by going ahead with the Ken Betwa Link without exhausting the water use potential of Ken catchment, which is predominantly a tribal area, the government is planning to keep this area permanently backward. But the EIA of Ken Betwa link does not even go into this issue, making the whole exercise incomplete.
Sixthly, the Ken Betwa Link project is a joint project between Uttar Pradesh (UP) and Madhya Pradesh (MP), about half of the benefits and downstream impacts in Ken and Betwa basins are to be faced by Uttar Pradesh, but the public hearings are not being conducted in UP at all, the proposed public hearing is only in MP! Even within MP, the link canals will pass through and thus affect people in Tikamgarh district, but the public hearing is not being held in Tikamgarh district either.
Seventhly, the project had applied for the legally required Terms of Reference Clearance (TORC) and the same was discussed in the meeting of Expert Appraisal Committee (EAC) on River Valley Projects of Union Ministry of Environment, Forests & Climate Change (MoEF&CC) on Dec 20, 2010. However the public hearing is being held more than four years after EAC recommended the TORC and that is way beyond the normal term of two years for which TORC is valid and even for extended term of TORC of four years. The public hearing being conducted without valid TORC can clearly not be considered valid under EIA notification and hence there is no legal validity of this public hearing.
Eighthly, the EIA done by the Agriculture Finance Corporation of India was already completed when the project applied for TORC! I know this for a fact since copies of their (most shoddy) EIA were made available to the members of the Expert Committee on Inter Linking of Rivers set up by the Union Ministry of Water Resources in Nov 2009 itself. I having been a member of the committee had critiqued the shoddy EIA in April 2010 and this was also discussed in one of the meetings where the AFC EIA consultants were called and had no answer to the questions. The same base line data that is now more than five years old is being used in the EIA being used for this public hearing! This is again in complete violation of the EIA norms.
Ninthly, in a strange development, MoEF&CC issued TORC for the project on Sept 15, 2014, following a letter from National Water Development Agency dated 18.06.2014. This letter is clearly issued in violation of the EIA notification, since as per the EIA notification, the ministry could have either issued the TORC within 60 days of Dec 20, 2010 meeting of the EAC or the TORC would be deemed to have been given on 61st day or Feb 19, 2011. However, issuing the letter almost four years after the EAC meeting and that too without mentioning the deemed clearance is clearly in violation of the EIA notification.
The TORC letter on MoEF&CC website is also incomplete as it does not mention the Terms of Reference at all! They are supposedly in the Annexure 1 mentioned in the TORC, but the letter on MoEF&CC site does not include Annexure 1. When I asked Dr B B Barman, Director of MoEF&CC and who has signed the TORC letter, he said that the project has been given standard TORs for any River Valley Project. But Dr Barman forgot that the MoEF&CC was giving the TORC for the first ever interlinking of rivers project and the TOR for this unprecedented project CANNOT be same as any other River Valley Project. The TORC letter is invalid also from this aspect.
The MoEF&CC letter of Sept 15, 2014 is also without mandate for another reason. The letter says “Based on the recommendations of the EAC, the Ministry of Environment & Forests hereby accords clearance for pre-construction activities at the proposed site as per the provisions of the Environmental Impact Assessment Notification, 2006 and its subsequent amendment, 2009”. However, MoEF&CC seems to have forgotten here that the Daudhan dam site and most of the reservoir is inside the Panna Tiger reserve. Perusal of the 45th EAC meeting held on Dec 20-21, 2010 shows that EAC did not recommend preconstruction activity and the EIA division of the MoEF&CC that issued the Sept 15 2014 has no authority to allow pre construction activities inside the protected areas like Panna Tiger Reserve. Even the NBWL (National Board of Wild Life) Standing Committee meeting of Sept 14, 2006 allowed only survey and investigation and NOT preconstruction activity and in any case such activities inside protected areas cannot be allowed without Supreme Court clearance. It is thus clear that Sept 15, 2014 letter of MoEF&CC for Ken Betwa link is also without authority.
There is a third reason why the MoEF&CC letter of Sept 15, 2014 is legally invalid: the letter giving Terms of Reference clearance did not include the conditions EAC stipulated when it recommended the TORC in the EAC meeting of Dec 20, 2010. One of the conditions was that a downstream study will be done by Central Inland Fisheries Research Institute. This becomes particularly important since there is a Ken Ghariyal Sanctuary[5] which will be affected, as also the Raneh falls, both are also tourist attractions.
However, the EIA of the Ken Betwa links has no downstream impact assessment, no mention of Ken Ghariyal Sanctuary or Raneh falls. The EIA also does not contain the CIFRI study that EAC had asked for. This is yet another reason why this incomplete and inadequate EIA cannot be basis for the public hearing from Ken Betwa Project.
This article is not a critique of the EIA of the Ken Betwa Link, I hope to write a separate article for that. Here we only see how illegal is the Public hearing for Ken Betwa link to be held during Dec 23 and 27, 2014 in Chhatarput and Panna districts. The Ken Betwa link project itself is unviable and unjustified and should not be taken up at all. But that will need another article.
It seems the current Union Government under Mr Narendra Modi and Water Resources Ministry under Sushri Uma Bharti are trying to push ahead with their River Link agenda, putting aside even legal stipulations. They also do not seem to be bothered that the Ken Betwa link will only have adverse impact on Ganga and this will also affect the Ganga Rejuvenation that they say is their priority. The EIA does not say a word on this count.
NWDA Index Map of Ken Betwa link proposal
We hope the proposed public hearing will be cancelled. In any case, any clearance given to the project based on such a public hearing will remain open to challenge.
In its initial pages, TSR Subramanian Committee Report (High Level Committee Report) comes across as a well-written, even eloquent document. That the environmental laws and governance needed streamlining and a strong, unbiased review was beyond doubt. Such a step was welcome and not an issue for environmentalists or rights groups to take umbrage to,in principle. In reality, overlooking the socio-political realm that infuses political and executive discourse is hardly possible or advisable. As pointed in this critique published in EPW, the report came at a time when environmental issues were abused and made to stand in judgment like no other.
The report has been lauded by the Env Minister who has taken pains to reiterate that his ministry “will not be a roadblock to development anymore”. The report also comes at heels of PM’s affirmation at the overflowing Madison Square Gardens about dismantling old laws. Even the most unbiased observer cannot miss context in which the report is laid out.
Even so, looking at the implications of the report it deserves an unbiased analysis and this is our attempt at it [1]. (We have not dwelt too much on the structure or details of the report as these have been laid out clearly in other critiques.) The High Level Committee constituting of 4 members and 2 Secretaries[2] under the Chairpersonship of Shri T.S.R. Subramanian, Former Cabinet Secretary, was formed on 29th August 2014 vide OM No. 22-15/2014-IA.III. Terms of Reference of this committee were:
(i) To assess the status of implementation of each of the aforesaid Acts* vis-à-vis the objectives;
(ii) To examine and take into account various court orders and judicial pronouncements relating to these Acts;
(iii) To recommend specific amendments needed in each of these Acts so as to bring them in line with current requirements to meet objectives; and
(iv)To draft proposed amendments in each of the aforesaid Acts to give effect to the proposed recommendations.
The third objective of bringing “laws in line with current requirements to meet objectives” is unclear in the absence of stating what the current requirement pertain to: What requirement? Whose requirements? Environmental, Social or Economic requirements? What Objectives? Whose objectives? The committee did not even attempt to clear air about these issues, though questions were raised. The composition of the committee also raised serious issues. (See SANDRP blog and Ritwick Dutta’s guest blog.)
So we had a committee of 4 members and 2 secretaries with questionable credentials, with an unclear TOR and put together by a government which had taken a biased stand on environmental issues sitting in judgment on all 6 environmental laws of the country[3], related orders, institutions and mechanisms which would affect myriad communities, forests and ecosystems, in a period of initially 2 months, extended by a month. Unbelievably, in these three months the committee not only suggested radical changes in all of the above, but also recommended a brand new Law (strangely) called Environmental Laws (Management) Act or ELMA, which, they suggest, would prevail over all contrary judgments issued in past decades or provisions of any environment law promulgated till date!
The committee states in the preamble of the ELMA that conclusions were reached “after interacting with diverse groups of people in different parts of the country”. This may give an impression that the Law or the recommendations are based on wide consensus. This is not the case at all and the output has to be looked clearly as a 6-member committee’s recommendations.
Going through the report As pointed out by Shripad Dharmadhikary in his critique, the report does make a relatively sound diagnosis of the problems of environmental governance of the country. Anyone, either from civil society or industry, who has experienced Forest Clearance or Environmental Clearance procedures, cannot but help be amazed at the entrenched bureaucracy, pathological reluctance to be transparent, colossal lack of accountability while taking decisions affecting ecology-social systems-industries, laziness to change any of the problematic entrenched systems and lack of respect for the people who are affected by decisions. Anyone who has made rounds to Pollution Control Board offices cannot miss the apathetic atmosphere, the couldn’t-care-less attitude of the officials.
So the diagnosis did detect the aching nerve when it states: “The legal instruments have really served only the purpose of a venal administration, to meet rent-seeking propensity at all levels. This impression has been further strengthened by waves of large scale ‘clearances’, coupled with major delays in approvals in individual cases” or “The state – arbitrary, opaque, suspiciously tardy or in-express-mode at different times, along with insensitivity – has failed to perform.The administrative machineries in the Government in the domain of Environment & Forests at all the levels, authorized to administer by Parliament’s statutory mandate, appear to have abdicated their responsibilities.”
“Environmental management is currently seen as an anti-thesis to development; development is seen as inimical to the habitat, natural assets, and in certain circumstances undermining peoples’ livelihood.” “Legislations are weak, monitoring is weaker and implementation is weakest.” And: “Our businessmen and entrepreneurs are not all imbued in the principles of rectitude – most are not reluctant, indeed actively seek short-cuts, and are happy to collaboratively pay a ‘price’ to get their projects going.”
Finally when the report evokes not only current challenges, but even inter-generational equity, it sounds too good to be true! “That environment is sacrosanct; that the purity of air, water and land has been inherited by a generation in mortgage for children of tomorrow; that it is implicitly imperative for each generation to leave the environment to the next generation in a better state than they found it.”
Where are the people? But as you continue reading through the lucid prose, you get that strange feeling of missing the elephant in the room. Where are the people? Where are the millions of people who live in forests or mountains or river valleys and islands or far flung villages, who are most affected by shoddy environmental governance? Why is the report not even mentioning the hardships faced by thousands of such fishermen who lost their livelihoods due to pollution of Vashishthi creek while the MPCB sleeps, or the cracks on the homes of people in Uttarakhand due to hydel projects which received clearances from MoEF CC, or the remote hilly settlements in Himachal who lost their sources of water due to tunneling and blasting for hydropower, or millions of fisherfolk who lost their rights to their rivers, or millions of tribals and others who are still awaiting rehabilitation after being driven out of their homes and their livelihoods?
Why are they not a part of this discourse on environmental management? The report spouts Upanishads and Vedas but does not seem to acknowledge that coexistence with nature has been a part of our eco-region for millennia.
Tribal women protesting against Lower Suktel Dam Photo: Down to Earth
Suddenly, one stumbles on sentences like “India’s growing prosperity is increasing demand for environmental quality”. This reduces environment to a consumable product, aspired by the upper middle class and negates the battles ongoing in the hinterlands of India, where environment equates with livelihood and survival.
As one reads on, the bias against communities and community protests gets clearer, starker and more disturbing. Along with communities, there is hardly any mention of impacts of destructive projects on forests, communities and wildlife. The lines are clearly drawn at compensatory afforestation, raised NPV, monitised afforestation, web-based monitoring, priced data bases, etc. But we are not to question the rationale behind several large scale destructive projects. To illustrate, in the case of Wild Life Protection Act, the report does not talk about habitat destruction due to development projects as one of the major threats to wildlife, but limits itself to hunting, poaching, man-animal conflicts and loss of corridors. Just to put things in perspective, in Arunachal Pradesh, Dibang Basin projects and Siang Basin projects can together submerge more than 23,000 hectares of prime wildlife habitat and affect several Schedule I species.
Some other issues too start getting too big to ignore. In the 113 page report, the word “speed” in context of speedy clearances gets repeated thirteen times. As we move from initial sagacious pages, the emphasis swiftly shifts from concern for environment to “time consuming clearance processes”. After notable recommendations in Forest Conservation Act, (succinctly critiqued here), the report seems to get down the business: Environmental and Forests Clearances. It is here that the superstructures NEMA (National Environment Management Authority) and SEMA (State Environment Management Authority) are introduced. Briefly, NEMA is proposed to be a full time board which will deal with a whole gamut of issues from Project clearances, monitoring, database creation, creation of standards etc,. CPCB will be subsumed under NEMA and it will function under the central government. SEMA at the state level will appraise Category B and C projects, monitoring and compliance, etc,. SPCBs will be subsumed under SEMA which will be under the State Govt.
Public Hearings (PH) According to the report:
Only environmental, rehabilitation and resettlement issues can be raised at the Public Hearing.
Only “genuine local participation” is permitted. Mechanism to be put in place to ensure this.
Public hearing can be entirely dispensed with if local conditions are “not conducive”.
There is no necessity for holding a PH if project site is away from settlements, if the projects are in industrial zones or complexes, for power, mining and line projects, if the projects are of national or strategic importance.
Appeal against NEMA SEMA approval has to be filed first with the Board formed under ELMA (which is without any subject experts), which can summarily reject the appeal and levy heavy costs against appellants for pursuing frivolous matters.
Gram Sabha Consent for Linear Projects not required, Settlement of Forest Rights not a necessity for Stage I Forest Clearance, no site inspection required for stage I forest clearance!
Protest in Assam against Lower Subansiri Project in Arunachal Pradesh Photo: KMSS
Let us see how these provisions, if accepted, will play out in real life, for example in case of Assam, which faces downstream impacts of Hydropower projects in upstream Arunachal:
Assam will not be a part of Public Hearing for dams like Lower Siang, despite the fact that impacts of Siang basin projects will deeply impact Assam. This is because PH is restricted to distance from Project Site, and is delinked from the impact of the project! Diurnal fluctuations from the Siang project will result in change in water levels by 22 feet near D’Erring Sanctuary, very close to Dhemaji District of Assam, every day in lean season, but affected people will not be able to participate in public consultations.
Even population from downstream Arunachal or interested Ecologists, NGOs who have important points to make about the EIA will not be allowed as PH is limited to “Genuine Local Participation” (this violates NGT judgment about who is aggrieved by a project).
The population of Arunachal, which finally does get to attend, will not be able to talk about social impacts, downstream impacts, impacts of having too many projects in a cascade, safety issues, impacts on their homes and drinking water sources etc., as the scope of their inputs is limited to “environment and rehabilitation and resettlement issues.”
Requirement of Public hearing itself can be done away with, if the “Local conditions are not conducive”. So in places like Tawang where Monpas are leading nonviolent struggle against destructive dams, the public hearing can simply be cancelled and the project proceed!
In fact there may be no public hearing for hydropower projects or for any power projects or river link projects!
In case affected groups want to appeal against NEMA decision, they will have to file a complete case within 15-30 days of MoEFCC’s order, which is extremely difficult for rural communities
If surmounting all obstacles, a case is filed, the petitioners better be wary as the board has powers to reject their appeal summarily and levy heavy fine on them.
Monks protesting against dams in Tawang Region in Arunachal Pradesh Photo: Urmi Bhattacharjee
Does this look like a conducive, encouraging environment to bring out accountability, transparency and inclusive environmental governance? On the ground, this may mess up issues further, fuel conflicts and delay projects, rather than fast tracking them!
Process of Project “Approval”: All in Three months: The Report has also recommended how the clearance process should be. This is possibly one of the most problematic areas of the report where all the focus is centered on getting the file move in full throttle. The report recommends Model TORs (Terms of Reference) for sections, which already exist. It also assigns just 10 days for the NEMA to work on a site specific TOR failing which the proponent will use the Model TOR. Laying down TORs for an Environment Impact Assessment Study is one of the crucial parts of the clearance process. Many stalemates we witness today have their roots in inadequate TORs. In fact in some developing countries, there is a Public Hearing at the TOR stage also so that affected communities and interested stakeholders can raise points to be included in the study. NEMA is supposed to recommend approval or rejection (with reasons) within two months of receiving the application. The basis of 2 months is not clear as the EIA study itself has to be at least a single season (one year) study!
Fast track clearances: On this Clearance express, there are some compartments which belong to the bullet train. Because nearly three months is too long a time to wait for projects which have the potential to change an entire eco region evolved over thousands of years, linear projects, projects of strategic importance and power and mining projects which are “engines of the nation’s growth” are put on a separate fast track. It is not clear how soon they will be appraised, or, approved, but imagination runs wild here..
Villagers affacted by Gosikhurd Dam in Vidarbha. The construction has faced huge corruption charges, cost escalation, lack of proper clearances, no rehabilitation of affected communities, and extremely poor quality work Photo: Aparna Pallavi
So what constitutes projects of national importance? As pointed by Shripad, much debated Polavaram Dam which can submerge nearly 300 villages in three states or the GosiKhurd dam which can submerge 100 villages, hundreds of hectares of forest land and is mired in deep corruption charges, can be fast tracked for being of National Importance as they already have the tag of being “National Projects”.
As for Monitoring, the committee stresses an ironically-named tool “Mandatory provision of voluntary disclosure”! Monitoring will be web-based, technologically assisted and with minimal need for site visits. This leaves absolutely no chance for any local affected community to be a part of monitoring, or be able to voice its concerns which may not show up on the hightech monitoring devises. The only place where committee mentions accountability is with reference to speed of clearance, failing which the Chairperson of NEMA will be held accountable. There is no accountability demanded either about failing to address impacts on ecology or on people.
Overreach of the Committee: ELMA: Hugely overstepping their mandate, the committee then proposes a new law for streamlining clearance and approval for projects at state and center by proposing Environment Laws (Management) Act, ELMA. As stated at the outset, this is no product of interactive discussions with civil society or general public, but is a part of a report by 4 individuals assisted by 2 secretaries in a period of 3 months.
Uberrima fides? It’s the environment we are talking about! According to the committee, ELMA is based on the principle of Utmost Good Faith or Uberrima Fides, used in Insurance Laws, as against Caveat Emptor, or Buyer Beware principle, where the NEMA, SEMA and the Ministry will put absolute faith in whatever studies, impact assessment reports, compliance reports that the proponent submits. According to the committee, “The law of insurance (Utmost Good Faith) supposes that the insurer knows everything about himself or about his activity to be insured; and the insurance company cannot be expected to know anything about the insured nor will it be able to verify all that is stated, speed being the essence. If the statements made by the insured turn out to be incorrect or if material facts were suppressed or concealed, the insurance company could avoid its liability.” (Emphasis added)
This stress in Insurance Law is entirely misplaced and non-applicable in the realm of environment!
Firstly, the Insurer owns his body, and there is a solid footing to believe him. In case of projects, say for example a dam about to submerge 5000 hectares of prime forest or displace lakhs of people, the proponent is making a claims about something he does not own, but which is public property on which many others depend and whichwill be irreversibly impacted by the proponent. While in case of Insurance laws the Insurer does not have any concern for the Insured, in case of environment, it is exactly the opposite. The MoEFCC’s prime duty is to safeguard the environment. If the project affects environment in a bid for quick clearances, it is the MoEF which would be (should be) deeply impacted. It cannot just “avoid its liability” like the insurance company as the Report suggests!
Vehicle drowned in muck, much of it dumped by Srinagar Hydropower Dam in Garhwal, Uttarakhand Floods, 2013. Photo: Kavita Upadhyay, The Hindu
There is absolutely no justification for using principle of Utmost Good Faith in the environmental realm, because most EIAs are fraudulent and compliances do not exist. Even currently, any false information provided at the time of appraisal process is a violation of Environment Protection Act and invites punishment. But there are examples by the dozen about how the MoEFCC refuses to take action even when clear evidence is presented to them about false information presented by proponent. This was violation of EPA 1986, how is this violation different than violation of ELMA?
We know that monitoring is the weakest link in environment governance and there no reason to believe that it will improve in any way by making it web-based. In the absence of this, taking proponent at his word about the information he provides at the time of clearance or monitoring is not workable, justifiable or acceptable.
Appealsagainst decisions of NEMA or SEMA: The primary space to file an appeal against decision of NEMA or SEMA is now taken by a board Chaired by a retired High Court Judge and two senior officials of the government and the National Green Tribunal is restricted to only judicial review. Merit-Based review and subject experts is one of the strongest assets of NGT, differentiating it from other courts and it is clear that this very role is being clipped by ELMA.
The ELMA will have an overriding effect on any judgments, orders of courts or tribunals under acts dealt with by ELMA.
ELMA also envisages Special Environmental Courts at district level which will take “Cognizance of the serious offences only on a complaint by the officers authorized by the NEMA or SEMA.” As an afterthought, these courts may also hear public only if they are satisfied that responsible authority failed to take action about their complaint in three working days. Taking action is a very vague term.
While the ELMA has provisions for “protecting officials acting in good faith”, it has a penal provision to scare litigation by a provision which says “Punishment for false or frivolous complaints”. So while the proponent will be treated in “Utmost Good Faith” aggrieved citizens will be treated with utmost skepticism and will have to: File appeal within 30 days, prove their bona fides, be wary and careful about filing as it may be deemed “frivolous” and they may be fined!
~~~~
The undercurrent of the HLC report is indeed that the environmental governance will have utmost good faith towards the industry and utmost suspicion towards the affected, the concerned or the civil society. There is no evidence till date to prove that this good faith in the industry is warranted without stringent checks and balances. Even in current compliance system the developers are supposed to voluntarily submit six monthly compliance report, but nothing happens if they do not and no one reads them if they do.This undercurrent overshadows some useful recommendations of the committee.
The HLC report cannot be accepted in this form. Any review of environmental laws needs a consultative and consensus-based process and not a rushed work of two months by a biased panel with unclear and open-ended TORs. The characteristic of ELMA, NEMA and SEMA of excluding participation and not attempting to address issues related to inclusive governance has the potential to polarize environment discourse rather than making it swift and accountable.
The remedy, unfortunately, seems more problematic than the illness. Reminds one of Sahir’s words, जो दवा के नाम पे जहर दे, उसी चारागर की तलाश है…
-Parineeta Dandekar, parineeta.dandekar@gmail.com
END NOTES:
[1] The report has already been critiqued excellently by various authors.
HLC – TSR Subramanian report: Climate blind or a climate disaster? Himanshu Thakkar, SANDRP https://sandrp.wordpress.com/2014/12/15/hlc-tsr-subramanian-report-climate-blind-or-a-climate-disaster/
Full Report of MoEF’s Committee to Review Environmental Laws Confirms Initial Apprehensions: Recipe for Dilution of Environmental Protection Regime– Shripad Dharmadhikary: http://shripadmanthan.blogspot.in/2014/12/full-report-of-moefs-committee-to.html
Executive’s Environmental Dilemmas: Unpacking a Committee’s Report: Manju Menon and Kanchi Kohli: http://www.epw.in/commentary/executives-environmental-dilemmas.html
[2]Members include: Shri Vishwanath Anand, Former Secretary, Justice (Retd.) Shri A.K. Srivastava Former Judge of Delhi High Court, Shri K.N. Bhat, Senior Advocate, Supreme Court of India. Secretaries: Shri Bishwanath Sinha Joint Secretary, MoEF&CC, , Shri Hardik Shah, Member Secretary, Gujarat Pollution Control Board
[3] [1] The Environment (Protection) Act, 1986, [2] The Forest (Conservation) Act, 1980; [3] The Wildlife (Protection) Act, 1972; [4] The Water (Prevention and Control of Pollution) Act, 1974; [5] The Air (Prevention and Control of Pollution) Act, 1981; [6] The Indian Forest Act, 1927.
As pointed out by Rohit Prajapati in his excellent critique, the HLC has also suggested changes to [1] The Forest Right Act, 2006 and [2] The National Green Tribunal Act, 2010, though these were not part of HLC’s TOR.
The 126 MW Larji Hydropower project near Aut on the mainstem of the Beas is run by the Himachal Pradesh State Electricity Board (HPSEB)[2]. The dam is constructed a little downstream of the confluence of the two main tributaries upstream, the Sainj and the Tirthan, at the narrowest part of a spectacular gorge, towering with limestone cliffs. The impounded waters of this dam have, since its construction in 2006, drowned the access road to the entire upper Kullu valley including Manali and the hundreds of villages upstream, including access to the entire Lahul valley and the region of Ladakh over the high passes from this end. The HPSEB then constructed a 3 km long tunnel to enable passage of traffic, and many people have warned of the hazardous nature of the tunnel. The 220 odd gods that descend from different valleys, on the backs of people to the lower Kullu valley every year in autumn however, refuse to use this tunnel. This is what compelled the HPSEB to build and maintain this tunnel, and during autumn to winter, to keep the water-storage in the dam low to enable the passage of gods, who have been traveling this route for over three and a half centuries. It is remark-worthy though, that this dam constructed as recently as 2006, seems to be heavily silted-up already and the dark shadows of sediment-shoals are visible just below the waters of the reservoir[3].
Being among the most recently completed, the Larji dam is the only dam on the Beas that has a fish-ladder, so it was of particular interest to us. Seeing no guard at the security booth, we walk in to the HPSEB dam operating office, and ask to speak to an officer about the fish ladder. To our complete surprise, we are spoken to and even taken on a tour of the ladder by a foreman who has worked on the dam for many years.
Having seen an elaborate fish ladder on the Kuri Chhu river in Bhutan of doubtful effectiveness[4], we could not help but look at this one with hope and excitement. Located at around 1,000 meters altitude, this dam was clearly in the way of a host of migratory species of fish. If this ladder design was effective, then surely the ‘barrier’ problem to seasonal migration for breeding and dispersal would have been addressed. Here though, is what we saw and heard.
For one, the flow through the fish-pass seems too small to create an ‘attraction flow’ for fish. But even more obviously, the downstream entrance of the fish ladder is a steep cascade over a couple of meters of broken masonry and rock, that would clearly be un-negotiable by any fish that does not jump that high[5].
Downstream entrance of Larji fish ladder: The 2 m high jump that fish require to enter the ladder can be seen here (all photos by the author)
2. The outlet from the dam reservoir into the fish ladder is blocked off by a metal grill-mesh that is narrow enough to trap flotsam like Bisleri water-bottles. The mesh seemed too fine to let Mahseer of breeding-age pass through, either upstream or downstream.
3. The fish ladder was in a serious state of disrepair. To our questions about whether the ladder worked or not, the foreman says honestly that it does not. We see the reasons for this when we walk down the ̴100 meter length of the fish-pass channel.
Fishladder can be seen in serious state of disrepair and blocked by broken concrete parts can be seen here
4. The Larji fish ladder seemed to be a hash of different designs of fish passes. There were four different design elements in this one fish-pass. It had a slotted-weir fishway design, a low gradient Denil fishway, a steep-pass Denil fishway and a plain concrete culvert on a grade design. Most of these slotted weirs were clogged with fallen rocks and debris from the slope above, and in places, the pools in them were over-flowing the weir in a vertical fall almost 2 meters high.
Steep-pass Denil fishway part of the fishladder can be seen here, water is flowing too rapidly here for any fish to be able to go upstream. The water picks up momentum down an extremely steep slope with the baffles at 45 degrees to the flow, not offset to slow the water, but concentrating the force of the water in mid-stream flow. The slope seemed to be at almost 40 degrees angle, and the water was turbulent in the extreme in this section. A workable Denilway slope, even for the strongest of swimmers among fish, is not designed to exceed a slope of 20% at most. This was close to a 100% slope
5. The oblique baffles on a Denil fishway are supposed to be placed in a manner that provides staggered partial-obstructions that slow the water down at variable velocities to make it passable for fish. However, here we saw that the water picks up momentum down an extremely steep slope with the baffles at 45 degrees to the flow, not offset to slow the water, but concentrating the force of the water in mid-stream flow. The slope seemed to be at almost 40 degrees angle, and the water was turbulent in the extreme in this section. A workable Denilway slope, even for the strongest of swimmers among fish, is not designed to exceed a slope of 20% at most. This was close to a 100% slope[6].
This part of fish ladder is less steep Denil
The last part of the fishway was a plain concrete culvert on a grade channel, essentially a sloping channel, where even the concrete sides of the channel had toppled over into the river-bed, and the final drop was over a two meter fall into the downstream flow. I asked the foreman whether he knew whether fish managed to make it over this extreme gauntlet. He said that they did not, but that he often saw fish gather and concentrate at the bottom of the dam under the sluice gates, and make futile leaps in an attempt to get over the dam. Clearly, the Larji dam fish ladder is just an unlovely trinket, a deceptive ornament.
Watch a 41 seconds video showing how fast the water is moving through the Larji Dam fishladder at: http://youtu.be/grVaxXPdeyY, Video is by the author.
It seemed to me that the dam builders and operators, the HPSEB in this case, both at the design and the executive levels, were not serious about constructing a fish-pass that would work, and neither were they serious about this at the operation and maintenance aspects. Whether they were serious at all even at the conceptual level, to put in place a mitigation measure that actually helped migratory fish bye-pass the barrier of the dam, or was this part of the design merely to obtain environmental clearance, can only be conjectured about. That hydropower projects can devise deceitful strategies for obtaining environmental clearance is one thing, but what does this tell us about the Union Ministry of Environment and Forests, the Expert Appraisal Committee on River Valley Projects appointed by MoEF, the regional office of the MoEF, the state Fisheries Department and also the state pollution Control Board, who are all variously part of the approval processes for hydropower projects, when they get their environmental clearances based on such ‘mitigation measures’?
Larji Dam – about 100 m long fishladder channel can be seen on the right side
[2] The 126 MW Larji project is also infamous for being the costliest hydro-power project per unit electricity generated so far in India. Finally built at a cost of R.s 10.27 billion, which was twice the estimated cost, the Vigilance department unearthed major financial misappropriation by HPSEB officials.
[5] Other than loaches, those tiny finger sized fish that can even climb (squiggle technique) up high waterfalls, provided there is something like a water-slide at the margins of the fall. They however, are not migratory fish.
[6] CIFRI recommends that the speed of flow of water in a fish-pass should not exceed 2 meters per second. Please see ‘Status of fish migration and fish passes with special reference to India’. MK Das and MA Hassan. CIFRI 2008.
SANDRP has just published a new report: “Headwater Extinctions- Hydropower projects in the Himalayan reaches of the Ganga and the Beas: A closer look at impacts on fish and river ecosystems”, authored by Emmanuel Theophilus. The report[i] was released at the India Rivers Week held during Nov 24-27, 2014.
Front Cover of the report HEADWATER EXTINCTIONS
Headwater Extinctions deals with impacts of hydropower projects in Beas basin in Himachal Pradesh and Alaknanda-Bhagirathi basins in Uttarakhand on river ecosystem and its components, mainly fish. While the harrowing impacts of hydropower projects on local livelihoods and social systems are being realized gradually, we are yet unclear about the extent of impacts of these so-called green projects have on fish and aquatic biodiversity.
Environmental Impact Assessments of large hydropower projects (> 25 MW as per EIA Notification 2006[2]) are supposed to assess ecological impacts of such projects, but we are yet to come across any comprehensive effort in this direction from EIA reports that we have assessed so far.
The Expert Appraisal Committee (EAC) of Union Ministry of Environment, Forests and Climate Change (MoEF & CC) which is entrusted with appraising these projects and their EIAs has paid very little attention to this issue. Since over a decade, the EAC has had expert members from Wildlife Institute of India (WII) and Central Inland Fisheries Research Institute (CIFRI). Both these institutes are supposed to have expertise on fish and aquatic biodiversity. But sadly, their presence has not helped fill the serious lacunae in appraisal and EIAs of the hydropower projects.
SANDRP had been trying to highlight the impact of hydropower on fish and the long standing problems in the so-called mitigation measures being recommended by the EAC. We thought that it may be useful to bring out a first-hand report bring out ground realities of what is happening to our rivers. Emmanuel Theophilus, based in the Dhauliganga Valley and who is an avid mountaineer, storyteller, ecologist and our ally was commissioned by SANDRP to study the impacts of hydropower on fish and ecosystems, review the EIAs as well as mitigation measures recommended by EAC as a part of Environment Management Plans of hydropower projects. We are very glad to publish the report as a first of the hopefully many steps to be taken to understand and address this important issue.
Headwater Extinctions has been written in an eminently readable style that Theo is known for, as could be seen from the earlier blogs[3] he wrote for us! The report has a section on ‘Travelogue’ which records Theo’s travels and thoughts as he visits Bhagirathi and Alaknanda sub basins in Uttarakhand and Beas basin in Himachal Pradesh. The report also brings illuminating photos from these trips. The fact that the travels happened within months of the Uttarakhand disaster of June 2013 could be seen in his photos and travel reports. It further substantives the role hydropower projects played in increasing the proportions of the disaster.
Travelogue is followed by discussions in two parts: Discussions on the impact of hydropower projects on fish and aquatic habitats along the two sub-basins and the role of EIAs, EMPs, Fisheries Plan and the government approval process. The findings of this report are valid for all Himalayan states & rivers.
Back Cover of the report HEADWATER EXTINCTIONS
Headwater Extinctions ends with some striking insights. Sample this: “We are in the midst of river extinctions in the Himalaya, but are surrounded by a tragic drama of double-speak and equivocation. And a horde of jostling brokers. Ranging from reputed universities, government departments, research institutions, everyday bureaucrats, and of course, politicians and contractors from within ‘the community’[4] along the developers and regulators. They not only write the script of this drama, they even play all the part”.
The inside covers of the report have detailed maps of the two basins with locations of hydropower projects, with annexures containing lists of hydropower projects in Upper Ganga and Beas basins and also list of fish found in Upper Ganga basin.
Theo has completed this report on a stringent timeline and budget, which meant that all the proposed and implemented fisheries management plans could not be assessed. We hope Headwater Extinctions provides sufficient material and compelling reasons to overhaul the way impacts of hydropower projects on fisheries and aquatic biodiversity are treated by EIAs, EMPs and government committees. We would also urge agencies like WII and CIFRI to do justice to their work inside EAC and beyond. That they are not doing that is apparent.
For EAC and MoEF&CC, we certainly would like them to ensure proper and full impact assessment of projects on aquatic biodiversity in the EIAs. The EAC also needs to stop approving completely ineffective fish hatcheries. They could initiate a credible independent study of the costs, benefits and performance of the fisheries development plans they have been approving in recent projects. It does not only smell fishy, but more like a scam! Here is a relevant quote from the report: “I can’t help see a few things here, as perhaps you do? Bluntly put, I see slush funds being dangled to a whole range of possible collaborators. The kindest term I can find for them is ‘brokers’.”
We look forward to your comments and suggestions on all aspects of Headwater Extinctions. If you would like a hard copy, please write to us.
[2] We have been saying this for long and this report helps substantiate our contention that the assumption that projects below 25 MW are benign and do not need EIA-EMP or environmental monitoring and public consultations is wrong.
The Report of the High Level Committee to review various Acts administered by MoEF & CC (the report hereafter) has been submitted[1] on Nov 18, 2014[2], though it has been made public only in early Dec 2014. The High Level Committee (HLC) headed by former cabinet secretary T. S. R. Subramanian faced a lot of well deserved criticism from its inception[3]. While a comprehensive critique of the 106 page HLC report will take time, some critiques have already been published[4].
At the outset it should be mentioned that the HLC report is replete with recommendations for expediting environmental clearance, fast tracking projects and they show anti environment bias, as reflected in its use of “Single Window clearance”, “Fast track clearances”, “making business easier”, “utmost good faith” to name only a few phrases frequently used by HLC. However, this article is limited to commenting on the direct and indirect implications of the HLC report on climate change concerns.
While the mandate of the HLC report was “to review various Acts administered by MoEF & CC”, as the title page of the report says, the report rightly acknowledges that such a review would entail analysis of functioning of the environmental governance in India. And any review of environmental governance would be considered grossly inadequate in 21st century, when climate change is the biggest over arching environmental concern of our times that is also dictating the developmental priorities and options. As the world moves from deeply disappointing negotiations at Lima (Peru), symbolizing the continued let down of recent COPs (Conference of Parties) under United Nations Framework Convention on Climate Change, to the next (21st) COP at Paris in 2015, it would be useful to see the HLC report through the climate change lenses.
HLC is climate blind Scanning through the report for the phrase “climate change”, one finds that it appears just once in the report outside the name of the commissioning ministry (Ministry of Environment, Forests & Climate Change), in para 1.3 in preamble chapter, where it says: “We need to take heed of the very recent Intergovernmental Panel on Climate Change (IPCC) call from Copenhagen that the earth is flirting with danger – the alarm flag has been hoisted.” That reference, one would have thought would lead HLC to give more importance to Climate Change, but that hope is belied when we read through the report. Even the word climate appears just one other time in the report (para 7.10.4 (e)) but that has nothing to do with climate change.
The other phrase generally used synonymously with climate change is global warming. This phrase appears in the report just once in preamble chapter, in para 1.7, which generates some hope: “Global warming, environmental degradation, loss of biodiversity and potential for conflict growing out of competition over dwindling natural resources are the current focus of humanity and should occupy the centre stage in policy formulation.” Indeed, Climate Change is “current focus of humanity and should occupy the centre stage in policy formulation”. But the HLC has nothing to do with that concern as the report does even care to mention that in any of its analysis or recommendations!
That shows that as far as direct reference to climate change is concerned, HLC has shown not referred to it in its analysis or recommendations. It would seem from this that may be HLC report is blind to climate change concerns.
But how can it be blamed for inviting a climate disaster? Let us see how.
Indian government is proud of its National Action Plan on Climate Change which is supposed to drive our developmental plans and priorities during the ongoing 12th Five year plan and beyond. There are several national missions, including National Mission for a Green India, National Mission for Sustaining the Himalayan Ecosystem, National Solar Mission, National Water Mission, National Sustainable Agriculture, National Mission for Enhanced Energy Efficiency and National Mission for Sustainable Habitat, all of which have far reaching implications for environment governance and climate change. The prime minister himself chairs the PM Council on Climate Change, which is a policy making and national monitoring body.
The 12th Five Year Plan specifically gives importance to climate change when it says (para 1.42): “It is known that India will be one of the countries most severely affected if global warming proceeds unchecked and as such appropriate domestic action is necessary. A National Action Plan for climate change has been evolved with eight component Missions. Implementation of these missions must be an integral part of the Twelfth Plan.”
But HLC takes no cognizance of any of these. Nor does it see the ecology, forests, rivers, biodiversity from climate change perspective and how vulnerable groups from climate change point of view would be affected by projects that would adversely impact the ecology, forests, rivers, biodiversity & other natural resources. In fact HLC completely ignores the fact that millions of Indians directly depend on these natural resources. HLC seems to have no clue about this.
Here it will be illuminating to quote what the HLC chairman said recently[5]: “Villages in Gujarat could have got the water five years earlier had there been no andolan. Though some people lost their land in Madhya Pradesh (MP), the result is that half of MP and three-quarters of Gujarat today has access to water. So, there is some cost attached to everything. Some larger force will have to look at it. Ultimately, it is all about striking a balance. We are suggesting that the government should not go after development blindly but also not let people of one village blackmail it by shouting “my right, my right”. Mr Subramanian here is clearly referring to Narmada Bachao Andolan agitation against the Sardar Sarovar Dam on Narmada River. This is not only grossly ill informed opinion, it shows his shocking anti people and anti people’s movement bias.
The HLC was expected to consider populations that are vulnerable due to climate change and also affected by destruction of environment. In fact the entire HLC report has nothing to do with people or populations, leave aside identifying the vulnerable populations and giving affected people any effective say in environmental decision making process. Absence of such role for people is one of the key reasons for current environmental problems in India, as is apparent in any of the environmental and natural resources conflict. But HLC analysis not only ignores this lacuna, HLC recommendations are for further reducing say for the people by suggesting that public consultations can be done away with in most projects.
Let us see some further direct implications of HLC recommendations with respect to climate change. HLC is essentially dealing with forests (chapter 5), wildlife (chapter 6), biodiversity (chapters 5, 6 & 7), environmental governance (chapter 7). It makes a large number of recommendations on these issues and all of these have implications for climate change and how the populations vulnerable to climate change would become further vulnerable when these resources are taken away from them. But here again HLC sees no need to mention climate change. For example, forests are a major storehouse of carbon and HLC recommendations are going to lead to massive deforestations, thus increasing the release of stored carbon and reducing the carbon absorption, besides taking away the adaptation capacity of the forest dependent communities, but HLC finds no merit or reason to mention that. Even in section 7.9.2 where HLC mentions the kind of expertise NEMA (National Environmental Management Authority), there is no mention of climate change.
It is in this context that we need to view the HLC recommendations for faster and single window clearances with advocacy for utmost faith in the project developers, for relaxing the environmental governance on several counts, for fast track clearances for mining, power, line projects and large number of other projects, for recommending relaxation of public consultation process in most of the projects, for insulating the officials and the ministers (the executive) from environmental governance, for delaying the legal challenge process to clearances and also for debarring the legal challenge on merit. These HLC recommendations are all going to help relax the environmental governance and hence invite greater environmental disaster and by implication, climate disaster for India.
The claim of HLC chairman that HLC had tried “to optimize the efforts to balance developmental imperatives causing least possible damage to environment” is clearly unfounded. The remarks of the Union Environment Minister Prakash Javdekar, while accepting the report from HLC, that “the Report was a historic achievement that would strengthen processes to balance developmental commitments and environment protection. The recommendations of the Report would enhance Ministry’s efforts to avoid undue delays and ensure transparency in clearances and implementation of projects” is deeply disappointing and seems to begin an era where environmental conflicts will only increase and deepen.
It is thus clear that HLC report will invite greater climate disaster for India, particularly for those who are poor and already vulnerable to climate change implications. The HLC report should be rejected for this reason alone, besides its other acts of omissions and commissions.
Since 2012, farmers in Maharashtra, especially in Marathwada and Vidarbha region of central and eastern Maharashtra are faced with unending mountains of crisis. What started as drought of 2012 went on in form of violent rains at places in 2013, hailstorms of February-March 2014, scanty monsoon in 2014 and unseasonal rains at places in November 2014, affecting lakhs of farmers. Agricultural production has suffered losses as impact of scanty rainfall has been compounded by absence of rains in critical time windows when soybean was filling and cotton bolls were forming. More than 8000 villages in Marathwada region which comprises of Aurangabad, Nanded, Parbhani, Latur, Beed, Hingoli, Jalna and Osmanabad have recorded crop losses of more than 50%.
Marathwada region in Maharashtra Map from: Marathi Wikipedia
The entire Winter Assembly of the newly formed Government seems to be clouded by discussions of drought package and increasing farmer suicides in Marathwada and Vidarbha. Since January 2014, more than 400 farmers have committed suicide in Marathwada region, and the pace is picking up worryingly since the past month. Hydrological, meteorological and agricultural droughts are becoming more pronounced in Marathwada.
But can this be attributed to vagaries of nature alone?
A brief analysis of the underlying reasons for the crisis in Marathwada and its future implications:
Truant Monsoon of 2014
As per SANDRP’s analysis of district-wise rainfall figures of Marathwada in monsoon 2014, the picture which arises is dismal:
For 2014, departure from normal rainfall for 6 out of 8 districts in Marathwada was more than 40% and rest two districts it was more than 50%, indicating a huge reduction in rainfall. However, contrary to what is being stated in the media, the region received satisfactory rainfall in 2013 monsoon. In fact, 6 districts of the 8 received more than 100% of normal rains and remaining two districts received 88% and 95% of normal rains last year. This is one of the reasons that the reservoir storage in 2014 did not fall as sharply as they did in 2012-13 drought. On 15th October 2014, Jayakwadi dam in Aurangabad had 42% Live storage, which was more than October 2013 storage of 33% and 2012, when it had reached dead storage already (http://www.mahawrd.org/). The entire Marathwada region too showed large reservoir storage of 47%, which is not extremely alarming.
Significantly, 2012-13 drought also unfolded in a similar manner, with highly satisfactory monsoons of 2011.
At the same time, the region is facing one of the worst droughts in recent history today.
This seemingly contradictory situation underlines a number of things, most important being: large dams do not automatically equate with water in farmers’ fields. Work on many projects (most projects in Marathwada) is incomplete ( for example: canals of projects like Lower Dudhana, Jayakwadi Phase II, etc), while contractors and politicians have made a pretty packet from the contracts, many projects are ‘evaporation machines’ than a water supply systems, without canals and distributaries or systems to govern water management. The available impounded water is a valuable political tool, and is used as such. Water allocation and management is far from being sustainable, transparent and accountable.
Projects under the jurisdiction of Godavari Marathwada Irrigation Development Corporation
According to news reports, in the past 11 months, 454 farmers only in Marathwada[1] have committed suicide due to number of reasons, most linked to crop failure and debt. Strikingly, after late November 2014, 52 farmers committed suicides mainly from Beed, Nanded and Osmanabad regions.
District
Number of farmer suicides since January 2014
1.
Beed
122
2.
Nanded
104
3.
Osmanabad
54
4.
Parbhani
49
5.
Aurangabad
40
6.
Jalna
22
7.
Hingoli
29
8.
Latur
34
The issue has been raised in the Winter Assembly by the enthusiastic opposition and the CM is yet to announce a drought relief package. It is expected to be close to 8000-9000 Crores or more.
At the same time, there is a huge tussle going on between Nashik and Nagar on one hand and Marathwada on the other, for waters Godavari which originates in Western Ghats flows through Northern Maharahstra and then becomes the lifeline of Marathwada region. Nashik and Ahmednagar have constructed slew of large dams on Godavari and have always been reluctant to release water for Jayakwadi dam in Aurangabad in the downstream. We saw this episode flaring up last year and we are seeing an action replay this year as the HC has ordered immediate release of water from upstream dams for Jayakwadi. (See:http://indiatogether.org/share-environment). (Notably, this is the first time I have witnessed that the Dam Storages data of www.mahawrd.org, the official website of the Water Resources Department is not updated with weekly Dam Storage Levels. This had not happened even at the peak of 2013-12 Drought. Our queries to WRD on this front have been unanswered till date.)
WRD officials and administration have taken cautious stand and water in reservoirs is now reserved mainly for drinking water purposes, any release in downstream for irrigation is being delayed and is being made only after strong negotiations, badly hitting rabi cultivation, which is already less than last year.
Even as conflicts flare up, protests rage and assembly is disrupted, sugarcane crushing goes on unhindered in Marathwada, in whopping 61 Sugar factories!
On the unfortunate and expected lines, the government has not said a word about restricting cane crushing in Marathwada this year, which itself guzzles massive amounts of water, apart from cane cultivation. On the other hand, the party president, Amit Shah himself attended first crushing day of some factories (one of which was reportedly captured by relatives of a BJP MLA by fraud![2])
A look at sugarcane cultivation and crushing season so far in Marathwada:
(All data obtained by SANDRP from Sugar Commissionarate, Maharashtra Government, December 2014)
Area under sugarcane in Marathwada in 2013-14 and Sugar factories
District
Area under sugarcane (in hectares)
Number of Sugar factories
1.
Aurangabad
15,373
9
2.
Jalna
11,083
5
3.
Beed
27,299
10
4.
Parbhani
25,567
6
5.
Hingoli
18,037
3
6.
Nanded
28,057
9
7.
Osmanbad
43,635
16
8.
Latur
61,479
12
TOTAL
2,30,530 Hectares
61 Factories
TOTAL SUGARCANE CULTIVATED IN MARATHWADA FOR CRUSHING
154.28 Lakh Tonnes
So around 61 sugar factories will crush 154.28 Lakh Tonnes Cane in a period when drought is so bad that water will not be released from reservoirs for irrigation!
In doing so, the factories will use a minimum of 1500 litres of water to crush one tonne of cane. To crush 154.28 lakh tonnes, minimum amount of water used will be: 23,142,000,000 Litres or 23.1 Million Cubic Meters. This is the lowest estimate.
This amount would be sufficient to irrigate nearly 8,000 acres of high yielding groundnut, more of Jowar or can be sufficient for drinking water needs of nearly 15 lakh 85 thousand people[3] till the onset of 2015 monsoon!
This water will be used till the end of crushing season when the drought will be extremely severe if we look at current indices.
Is there a justification of doing so? Will a 10,000 Crore drought package come close to ameliorating the impact of water loss at the peak of drought?
In addition, the pollution control mechanism of most sugar factories is pathetic. Pollution Control Board has raised this number of times. Uncontrolled water and soil pollution by sugar factories will additionally pollute groundwater and water bodies, further affecting water security of the region.
This water may be sourced from dams and groundwater. SANDRP has witnessed in 2012-13drought, sugar factories in Marathwada, mainly Osmanabad region lifted water from dams even when water levels had dipped below dead storage. What will be the impact of this siphoning on local drinking water security?
We should not forget that one of the costliest political lesson for NCP came when Ajit Pawar uttered extremely insulting remarks on dry reservoirs, mocking people’s plight. This was in context of a protest by a lone farmer from Mohol, urging water for drinking, even as sugar factories on Mohol used lakhs of litres of water when the farmer, Prabhakar Deshmukh, was fasting in Mumbai! Needless to say, the ruling party’s defeat was sealed through such acts. (More about Sugarcane in Solapur here: https://sandrp.wordpress.com/2013/04/22/why-solapur-sugarcane-and-sustainability-do-not-rhyme/)
Even in terms of groundwater, Marathwada region has literally touched rock bottom. In a report by GSDA (Groundwater Survey and Development Agency) submitted to Government of Maharashtra,[4] it has been reported that in 249 villages of Marathwada, abstraction has been 100% and there is no more water to draw. Not surprisingly, the regions suffering largest groundwater problems are surrounded by sugarcane and sugarcane factories.
In the past too, SANDRP has underlined how sugarcane in drought affected areas contributed to worsening drought of 2012-13. Then Solapur was in crisis. This year, the district which has 28 sugar factories two years back has 34 sugar factories!
All government announcements about bringing sugarcane under drip have remained on paper and sugarcane continues to rule the drought politics of the region, regardless of the political party. In fact, the Cooperation Minister BJP Government Chadrakant Patil has announced that the only clause which has been limiting further sugar factory rush (of having a minimum aerial distance of 15-25 kms between two factories[5]), can be diluted “ to promote healthy competition”. 200 factories are lined up for licenses with the Sugar Commissionarate! There is no thought about the impact of this decision on water profile of Maharashtra.
This defies logic. The work of Winter Assembly was disrupted several times yesterday (10th December 2014) by aggressive opposition asking for an immediate drought package for Marathwada and Vidarbha. How can a 4,000 or 10,000 Crore Drought Package address these systemic issues? How can this package address siphoning off water from a drought hit region in peak drought? The opponents are happy discussing help to sugar factories for drought relief, not raising any points about impending impacts of crushing cane in drought.
In the long term, there is a need to reduce area under sugarcane and provide proper incentives, fair support price, forward and backward market linkages and support for initiatives like horticulture under drip (and there are several success stories from Marathwada on this), dairying, oil seed and pulses cultivation and processing, dryland farming and importantly, equitable and transparent water management involving all farmers in the region, not restricted to a few.
It is high time that long term decisions are taken in order to make Marathwada truly drought proof and free from clutches of ‘drought packages’ and opportunistic politics, year after year. A start can be made by restricting cane crushing in the region immediately.
Above: Latha with her friends at Athirappilly Falls. Photo: Parineeta Dandekar
It is difficult for me to write impersonally about the work of Bhagirath Prayas Samman recipient Dr. Latha Anantha. She is Latha Chechi to me, a close friend and more of a sister. The bond is based on water and rivers, possibly stronger than blood. This is only an attempt to introduce the readers to the exemplary work of Latha Chechi (and that of the River Research Centre and Chalakudy Puza Samarakshan Samithi team) as the recipient of the first Bhagirath Prayas Samman for “exemplary capacity for combining sound research with the mobilization of community, political and state agencies, and for ushering in a unique methodology of consensus- based conservation of rivers in the country’”.
Ravi from CPSS receiving Bhagirath Prayas Samman Award on behalf of Dr. Latha, from Justice Madan Lokur
Latha is an agricultural scientist by education and holds a doctorate in the subject. But how did she start working with rivers? In 1989, Latha was a part of a nature camp which took her and many like her into the Silent Valley National Forest. Then, Silent Valley National Forest was declared as a protected area only 4 years back after protracted, and possibly one of India’s foremost anti-destructive dam struggle, led by people. (A fascinating account here )
It was here that, under the guidance of Dr. Sathish Chandran Nair, Latha saw that while forests of Silent Valley are the birth place of beautiful river Kunti, Attapadi region was devoid of forests and most streams were dried up. The Bhavani river was hardly flowing there. The contrast was self revealing. It was here that the connections between forests and water and rivers and tribals and wildlife were forged. She says she was a changed person after witnessing all this.
In 1995, Latha married Unnikrishnan, also an ardent river lover and activist (and a poet!) and together they conducted several nature camps for children and young adults all over Kerala, always coming back to the Chalakudy River and her thick forests near Vazachal and around. By then, she had made friends not only with the river, but with the Kadar tribes who lived with the Chalakudy, on her banks, one amongst them was young Geeta. The learning and exploring continued for a few years, until in 1998 they heard that a dam project on Chalakudy, the Athirappilly dam, had received sanctions from Delhi. They were shell shocked. Back in 1998, this couple and their friends like Ravi, in a remote part of Kerala knew nothing of EIA Notification, sad monotony of sham EIAs, compromised EIA agents, project-friendly meetings at MoEF, nothing. But they persevered.
Helped by stalwarts like Dr. V.S Vijayan, Dr. Sathish Chandran Nair, this tenacious group slowly put the jigsaw puzzle together, piece by piece. They understood the EIA Notification of 1994, got hold of the EIA and saw how the Kadar tribe, living just by the river was not even mentioned. They say how the fact that Chalakudy was already dammed six times before it comes to Athirappilly and how 35% of its flows are already diverted was hidden from the EIA. .Kadar tribal settlement was mentioned incorrectly outside the project impact area. Latha by then also realized that the mandatory public hearing was also not conducted for this project.
Now there was no stopping this group, which also included hydrologist Madhusoodan and botanist K Amitha Bachan. Ravi and Unni filed a case in Kerala High Court in 2001, challenging the EC granted to Athirappilly and Latha & team did all the research, putting together a water-tight case. The court ruled in favor and asked for a fresh public hearing.
Latha and friends already had strong ties in the Chalakudy region. This was not a single day affair, but a trusted relation built over years. The tribals knew this team’s love for them and their river. They listened and they discussed. They were aghast at the dam building plans. The public hearing saw overwhelming participation not only from the tribal communities, but from scientists, shop keepers, hotel owners, farmers, gram panchayat members, etc. The District Collector witnessed this and would not push the project until a river basin study was done, possibly the first such in India.
Public Hearing of Athirappilly Project
There was a lull in the meantime, giving a false sense of security for these Chalakudy lovers. But it also gave them time to get introduced and work with friends like Himanshu Thakkar from South Asia Network on Dams, Rivers & People (SANDRP), Shripad Dharmadhikary from Manthan with whom they had been in touch for long, supporters like Dr. Ramaswmay Iyer, etc. Through SANDRP, in 1998 itself, the group had made submission to the World Commission on Dams opposing the Athirapally project. The CPSS, in collaboration with SANDRP, organized a meeting on the report of the World Commission on Dams at Thrissur on June 22-23, 2002. A meeting against Interlinking of Rivers in Kerala was organized by CPSS and SANDRP on July 12-13, 2003. A book “Tragedy of Commons: The Kerala Experience in River Linking” was published in 2004 by River Research Centre & SANDRP.
Shripad Dharmadhikary at Charpa Falls, also threatened by the Athirappilly project
But Athirappilly dam plan put up its head again in February 2005 when the project gained Environmental Clearance through back door from the MoEF. This time the EC was challenged by none other than the young Geeta, the Kadar woman, living on the banks of the Chalakudy who filed a PIL in the High Court of Kerala in April 2005 challenging the new Clearance granted to the project. The Athirappilly Gram Panchayat President also filed a PIL on EIA violations. The High court again upheld the plea and ordered for a public hearing afresh! This public hearing in 2006 witnessed massive turnout of the tribal community members.
Geeta ji, the petitioner for Athirappilly Project in the backdrop of the falls. Photo: Parineeta Dandekar
In the meantime, Latha also wrote to Jairam Ramesh to intervene in the issue and Unni and Lathachechi met him personally when he was in Kochi. He issued stop Memo to KSEB on January 4th 2010. After this KSEB again approached MoEF. Once again PIL was filed in HC challenging the EIA in 2007 and is still pending in the HC.
This proposal was again recommended environmental clearance by the Ministry of Environment, Forests & Climate Change’s Expert Appraisal Committee (EAC) on River Valley Committee in their meeting in May 2007. However, following directions by Kerala High Court to KSEB, the project came back before EAC in March 2010 and was again discussed in April 2010 and July 2010, till when no conclusion could be reached by EAC and EAC had asked for more information and clarifications. There is no mention of the project in any of the minutes of the subsequent EAC meetings[1].
Since then there has been a lull on the plans though it has not died out completely. River Research Centre, though existing since many years back informally, was formally registered as a Trust. RRC, Chalakudy Puzha Samrakshan Samiti and Latha’s dedication is one of the strengths of Athirappilly waterfalls, which would have been dammed and dried long before if it was not for this people-led, nonviolent struggle.
The Athirappilly Falls
Latha was simultaneously working on campaign against the proposed Pathrakkadave HEP across Kunti River near Silent Valley National Park on several angles such as community mobilisation, EIA, Public hearing, etc. The very destructive dam project has been stalled and the public sentiment and pressure is very big on this project as not to build the dam.
Since early 2000, she has also been involved in education program for children along the banks of the Chalakudy River. RRC and the Schools for Rivers program were instrumental in forming a ‘Kuttikoottam’ (meaning a group of children) of more than 50 children aged between 10-20 years who would set out to know more about their panchayath, its natural resources, human resource potential, culture, folklore, institutions, governance, destruction of environment, problems faced by the river and related livelihoods etc. ( More on it here)
While working on environmental governance and advocacy, CPSS has also worked on novel and promising initiatives like Reservoir Reoperation Model. The project is steered by CPSS and Forum for Policy Dialogue on Water Conflicts in India of which Latha is a Steering Committee member.This model is specifically aimed at dammed rivers, where impacts are supposed to be a way of life. In the much-dammed Chalakudy, RRC, with its dedicated members like Ravi and others demonstrated how operations of a hydropower scheme can be and should be changed to maintain summer irrigation in the downstream and also rudimentary flows for the river. This is far from perfect, but a great step in the direction. At the heart of these processes is joining the dots and bringing people together: from power company, irrigation department, farmers, local self-governments, etc. In April 2013, the CM of Kerala agreed to increase the off peak generation of Poringalkuthu Left Bank Hydro Electric Project. More on this here.
Latha also played an active role in the Save Western Ghats Movement group. In a meeting of this group Kothagiri in Keystone Campus, Environment Minister Jairam Ramesh made the announcement of Western Ghats Expert Ecology Panel, after relentless advocacy by the group, including Latha. The subsequent Panel under the leadership of Dr. Madav Gadgil and what followed had deeply affected the environmental discourse in India. The way MoEF and government of India hid Gadgil report was a shameful, underlining the unwillingness of the administration to take any visionary or long term actions towards people-led environmental governance. Along with organization like Goa Foundation, RRC was a part of the petition filed in the NGT against this opacity and for implementation of the Gadgil Report. The court ordered the MoeF to bring out the Gadgil report. The din that followed, especially in Kerala, was massive and bewildering. Gadgil Report was then subsumed to the problematic Kasturirangan Committee, which decision itself was flawed. Powerful interest lobbies, including religious groups, did not miss a single opportunity at misleading locals about eco sensitive areas. If Western Ghats was tense, Kerala was in the eye of the storm. At this juncture, Latha chechi came out and wrote about Kasturirangan Committee report as one of the reason for political polarization for Kerala, and asked for a sane and democratic approach through the Gadgil Report. Latha organised meetings as well as participated in many meetings and debates organised on the subject all over Kerala.
She has also been working endlessly on the issue of eflows, from upcoming as well as existing dams and has engaged consistently with the MoEF on this. Way back in 2009 RRC, along with SANDRP and Svaraj organized the first consultative National Workshop on Eflows. She has also co-authored the first Primer on Environmental flows, aimed not at scientists, but at community groups and activists who are more likely to urge for the implementation of the concept of eflows. (http://www.internationalrivers.org/files/attached-files/eflows_primer_062012.pdf)
While keeping a balanced, soft spoken and people friendly stand she has not shied from criticizing consultants like NIH and CIFRI for their shoddy eflows assessments. She has served on several government appointed committees in Kerala and has been a resource person for countless programs on rivers and forests. She also serves as the South Asia Advisor, International Rivers and is the Ashoka Fellow, 2012.
Latha’s story, intrinsically linked with River Research Centre, CPSS, Chalakudy River and beyond is a story of soft spoken courage. It is a story of bringing people together and looking at a river as a shared heritage, not only as a part of a conflict.
Today, Latha is undergoing a challenging time physically, undergoing several rounds of treatments. But mentally, she is the same strong and sensitive river woman of the Western Ghats.
She is a natural recipient of the Bhagirath Prayas Samman and we look forward to having her back with us soon in her full form: singing, laughing and loving rivers as she does..
Parineeta Dandekar (parineeta.dandekar@gmail.com)
Near Jog Falls on Sharavati, made dry by the Linganmakki Hydropower Project Photo: Parineeta Dandekar
“Government will not proceed with interlinking of rivers if environmental consequences are adverse”, says Uma Bharti, Union Minister of Water Resources, River Development and Ganga Rejuvenation at the India Rivers Week 2014
Sushri Uma Bharti, Union Minister of Water Resources, River Development and Ganga Rejuvenation speaking in the valedictory function of the first ever India Rivers Week hailed the first ever event on the vital issue. She emphasized “if we want to save our rivers, the first step is to ensure that no untreated effluent or sewage is mixed with treated water and finds its way into our rivers.” She assured that minimum environmental flows will be maintained in the river itself . Manoj Misra, member of the organizing committee of India Rivers Week cautioned her not to proceed hurriedly on the project given its adverse social and ecological consequences.
The Indian Rivers Week-2014 conference awarded individuals and organizations the “Bhagirath Prayas Samman” for their dedicated work on river integrity and safety. Mr Justice Madan Lokur, Hon’ble Judge, Supreme Court of India was the Chief Guest at the Awards Ceremony, held on 26 November, 2014. Speaking on the occasion he stressed on the need to put in place alternative dispute resolution mechanisms to resolve water conflicts. Courts are not the best option for this, he said. Sri Anupam Mishra, Gandhi Peace Foundation, who was the Guest of Honour in this ceremony spoke on the value of time-tested systems of water harvesting and the need to promote the use of indigenous knowledge to solve water problem instead of gigantic and destructive schemes like interlinking of rivers.
Akhil Gogoi receiving Bhagirath Prayas Samman award from Just Madan Lokur of SC 261114
The awards were given to the following extraordinary individual/ organisations:
Dr Latha Anantha, Chalakudy Puzha Samrakshana Samiti who has worked on safeguard the integrity of the river Chalakudy (Kerala) was awarded for her exemplary capacity for combining sound research with the mobilization of community, political and state agencies, and for ushering in a unique methodology of consensus- based conservation of rivers in the country. Their group has been able to stop clearance to the Athirapally project on the Chalakudy for close to two decades now.
Akhil Gogoi, Krishak Mukti Sangram Samiti who has successfully utilised the Right to Information Act in conjunction with mass mobilization of communities with respect to ill conceived projects in river Subansiri (Assam) that could threaten their life, property and livelihoods. Due to the efforts of KMSS led by Akhil Gogoi, in association with a number of other organisations, the government had to make large number of changes in the construction and operation of the Lower Subansiri project and work on the project has remained stalled for close to three years now.
Koel Karo Jan Sangathan, an organization born in 1976 for untiring efforts to safeguard the integrity of the rivers Koel and Karo (Jharkhand). Koel Karo Jan Sangathan has through community mobilisation effort to conserve their sacred sites and to look at alternative development paths in place of the proposed Koel Karo hydroelectric dam. The Sangathan has carried on a long and heroic struggle in the face of enormous pressures from the vested interests, battling tremendous odds to forge one of India’s foremost resistance movements to save rivers, riverine communities and their culture. The Sangathan has demonstrated the use of many innovative methods of struggle including people’s curfew and people’s check points.
Koel Karo activists singing song at IRW 261114
K J Joy, SOPPECOM, Pune speaking on the issue of community initiatives for conflict resolution on rivers said that “there is a need to recognize the complexity, diversity and heterogeneity of conflicts around rivers. These conflicts often end up in courts for redressal. The experiences and struggles reveal limitations in the processes being handled in the court, thus raising the question of whether courts/tribunals are adequately equipped to redress these conflicts. At the same time there are several community evolved and driven resolution mechanisms, sometimes in the form of customary practices. These are often co-opted and/or sabotaged by vested interests and inappropriately mandated state agencies/ laws. There is a need to search for policy, legal and institutional avenues for legitimizing these resolution practices, and also frame alternative mechanisms within a normative framework of social justice, sustainability, and equity and democracy.”
Bhai KK Chatradhara on behalf of the group on “Campaigns for protection or rejuvenation of rivers” said that “river rejuvenation should be looked at from a holistic perspective – from source to sea. Cumulative Impact Assessment including downstream impact assessment should be done before taking up of any new project. That should require consultations with and consent of Gram Sabha and local panchayat raj institutions. Local community people should be involved in discussions and decision making processes at all levels. Effective cost benefit analysis including options analysis and direct and indirect costs incurred such as cost of decommissioning, aesthetic and landscape loss, disaster potential of an area should be assessed. Sand auditing should be carried out.”
Deliberations at India Rivers Week-2014, New Delhi
Preeta Dhar representing the group on “Good legal interventions and secured rivers” pointed that “there is a need for addressing outdated laws and standards, gaps and for accounting for changes in technology.” The greater role of panchayati raj institutions and local communities in governance was stressed. The group also recommended the need for use of legal spaces to develop best practices and do go for strategic litigation.
Sudhirendar Sharma, speaking on behalf of the group on “Dams decommissioning and restored rivers” said that “decommissioning of dams is new in the Indian context and in the light of the Mullaperiyar Dam, highly contentious and political. The arguments favoring decommissioning, if at all, are in a nascent stage both in terms of arguments, language and its presentation. The idiom of decommissioning has yet to be located. Locating decommissioning in the context of potential politics is weak in argument and smells of what critics might argue as a case of kinetic politics.”
The India Rivers Week event is being organized between 24-27 November, 2014 by a consortium of NGOs including WWF India, INTACH, SANDRP, Toxics Link and PEACE Institute Charitable Trust, with additional support from Arghyam (Bengaluru), International Rivers (Mumbai), and Peoples Science Institute (Dehradun) to discuss, deliberate and exchange their experiences and ideas aimed at the conserving, rejuvenation, restoration of rivers in the country. With ‘Rivers in crisis’ as the theme, the Conference endeavors to devise a National Charter for Rivers and promote a National Forum for Restoration of Rivers.
“A river is an ecological system that flows and performs many functions” says Ramaswamy R Iyer, former Secretary to the Government of India, at the India Rivers Week 2014
Over 125 river experts, planners, researchers, artists, enthusiasts and activists from different parts of the country that have congregated at first ever India Rivers Week being held in Delhi, discussed and debated on how to define a river. Ramaswamy R Iyer, former Secretary to the Government of India, defined the river as “A natural organic hydrological ecological system that flows & performs many functions.” The attempt was to pen an aspirational, visionary and implementable definition of rivers to underpin an India Rivers Charter”, to be prepared at the end of these deliberations.
Manoj Misra of PEACE Institute, New Delhi, speaking at the India Rivers Week-2014, said the working group he convened defined river as a, “Hydrological, ecological, geomorphic living entity containing other life forms, landscape level ecosystem in dynamic equilibrium between rainwater, snow, glaciers surface water, groundwater, sea, estuary and providing a large number of social, cultural, ecological and economic services to people and ecosystems all along its basins.”
The event is being organized between 24-27 November, 2014 by a consortium of NGOs including WWF India, INTACH, SANDRP, Toxics Link and PEACE Institute Charitable Trust, with additional support from Arghyam (Bengaluru), International Rivers (Mumbai), and Peoples Science Institute (Dehradun) to discuss, deliberate and exchange their experiences and ideas aimed at the conserving, rejuvenation, restoration of rivers in the country.
Can we think in terms of ‘rights of the river’ and then make it part of some legal system, questioned different groups. The groups were discussing the rivers right to unfettered flow, space for flood plains, flood, breathe, perform ecosystem functions, lateral connectivity and natural water.
Manu Bhatnagar, INTACH, representing the deliberations of another group said, “River is a living commons that drains a catchment along a natural course with natural and dynamic flow and providing ecological goods and services necessary for the development and sustenance of human civilizations under challenging social, economic, political and climatic drivers.” Speaking on the issue Professor Brij Gopal noted that, “River regulation is the root of all problems. We need to regulate human activities”.
“We are not obliging the rivers by editing her flow, we in fact are obliged by the rivers due to their life-giving flows”, said Mallika Bhanot, representing another group.
The conference also deliberated on what a river is not. Manshi Aasher said that a river is not static, an artificial drain, lifeless, embanked/ obstructed, without sand and sediments, carrier of wastewater or just a channel of water.
A living, wide, water course which has natural fresh, flow of water above and under the surface, in its course, nurturing life forms, ecosystems, culture, conserving biodiversity in it and is inclusive of small and big tributaries in its catchment area.
Shashank Shekhar explaining about river flows, clarified, “The flow with its natural variability includes natural water, nutrients, sediments and biota and is the defining characteristic of river systems.” Dinesh Mishra, Barh Mukti Abhiyan, said, “Rivers are self cleansing, flooding is purifying and rivers become pure after floods.” Pranab Choudhary discussed the issue of conservation of biodiversity as against utility and noted the importance of defining and protecting rights of riparian communities especially the poor, including from downstream areas, today these are neither assessed, nor compensated.
Paritosh Tyagi summed up the discussion by saying that the older concept of River Action Plan that focused on river flow should be replaced with focus on the complete basin.
2015 Rivers Calendar The organizers have brought out the 2015 desk calendar featuring the photos of 12 different rivers and highlighting the sacrifice tribals have made during the famous struggle against the Koel Karo project in Jharkhand.
“When Farakka barrage was built, the engineers did not plan for such massive silt. But it has become one of the biggest problems of the barrage now” said Dr. P.K. Parua[1]. And he should know as he has been associated with the barrage for nearly 38 years and retired as the General Manager of Farakka Barrage Project (FBP). I remembered the vast island of silt in the middle of the river barely a kilometer upstream of the Barrage and the people who told us their homes were devastated by the swinging river.
Silt Islands just upstream the Barrage. Photo: Parineeta Dandekar, SANDRP
Though called a barrage, Farakka Barrage is a large dam as per ICOLD, WCD and CWC definitions, with associated large dimensions and impacts. To call it a Barrage is misleading.
Commissioned in 1975[i] across Ganga in Murshidabad District of West Bengal and just 16 kms upstream of the Bangladesh Border, Farakka Barrage has been mired in controversies from the very beginning. Its role is singular: to transfer 40,000 cusecs water from Ganga to its distributary Bhagirathi-Hooghly (hence forth referred as Hooghly). And to make Hoogly river navigable from Kolkata port upstream till Farakka barrage. It was thought that this water will push the silt that is eating up the Kolkata Port and will protect the Port for navigation and economy. In reality, Kolkata Port continues to decay and the barrage has had such severe and unforeseen impacts on the people of India and Bangladesh that the call to review Farakka Barrage entirely is getting louder by the day.
A lot has been written about Farakka Barrage by Indian (and many times by Bangladeshi) authors, so why are we discussing Farakka again? Because Political leaders like Shri. Nitin Gadkari have stated that there are plans of building a barrage after every 100 kms in Ganga from Haldia to Allahabad, a 1600 kms stretch. So we are looking at possibly 15 more barrages on Ganga. But before taking decision about building any other such structure, we need to understand the range of impacts a single barrage has had on the lives of millions of people and how inadequate has been our response in addressing these impacts. Farakka holds critical lessons for Indian politicians, policy-makers, international groups and financial institutions like World Bank dreaming of making a string of barrages across a river which has one of the highest silt loads, densest population and the largest deltas in the world.
Ganga as a “Waterway” Government of India is planning to aggressively develop 1620 kilometers of National River Ganga as “National Waterway 1” (NW1). There is a profound difference between a Highway and Waterway. A highway is simply a road while NW1 is actually River Ganga, performing several other functions, it is important to recognise how the NW1 would affect these functions and the river itself. NW 1 spans from Haldia, near the mouth of Ganga Estuary in West Bengal, to Allahabad in Uttar Pradesh, passing through four states and cities of Haldia, Howrah, Kolkata, Bhagalpur, Buxar, Patna, Ghazipur, Varanasi and Allahabad.
The Inland Waterways Authority of India (IWAI)[ii] plans to use this waterway for the transport of “coal, fly-ash, food grains, cement, stone chips, oil and over dimensional cargo.” Not surprisingly, companies keenly interested in using this waterway include “thermal power plants, cement companies, fertilizer companies, oil companies” etc. In order to make this stretch navigable, IWAI plans initiatives like “river training and conservancy, structural improvement, dredging, and Construction of terminals at Allahabad, Varansai, Gazipur in Uttar Pradesh, Sahibganj in Bihar and Katwa in West Bengal.”
Although this plan was on paper for some years, the new government has approached the World Bank for support of nearly Rs 4200 Crores (700 million dollar) for its implementation. In July 2014, the World Bank agreed to fund initial 50 million dollars including technical support (thus creating work for its own experts!). World Bank Team has already visited Patna for this project and joint meeting of IWAI and World Bank has taken place at Varanasi[iii]. No public consultation has been held thus far.
Although River Navigation has nothing to do with River Rejuvenation, Shri. Nitin Gadkari, Union Surface Transport & Shipping Minister with additional portfolio of Rural Development, who played an active role in the Ganga Manthan, announced this navigation plan as a part of ‘Ganga Rejuvenation’.[iv]
He also announced that the plan entails erecting barrages (dams) on the Ganga at every 100 kilometer interval from Haldia to Allahabad. This would mean damming the Ganga rough about 15-16 times, to maintain water levels and navigability.[v]
If the plan moves ahead, it may escape environmental clearance as the very limited EIA Notification 2006, being actively amended for dilution by the Modi government, includes only irrigation and hydropower dams in its ambit. This does not mean that these barrages will not have severe impacts on the river, its people and its ecosystems. Far from it. SANDRP has written about the impacts of Upper Ganga Barrage at Bhimgouda, the Lower Ganga Barrage at Narora and the Farakka Barrage in Murshidabad, West Bengal (SANDRP’s Report on Farakka, 1999: https://sandrp.in/dams/impct_frka_wcd.pdf).
The analysis at hand is based on official documents and research, site visit, interviews and discussions with experts and local people.
Farakka Barrage, in the backdrop of proposed Barrages
Farakka Barrage, 2.62 kms long, commissioned in 1975 has a unique purpose. The barrage was built for diverting waters of Ganga into its distributary The Hooghly/ Bhagirtahi, for flushing sediments and maintaining the navigability of Kolkata Port (& Hooghly River) which lies at the mouth of Hooghly. Records about high sedimentation in Hooghly can be traced back to 17th Century, but is known to increase following building of Damodar Dams in post independent India. Construction of a barrage on Ganga and diverting its waters into Hooghly was suggested in the 19th Century by Sir Arthur Cotton. After independence, the historic Kolkata port was becoming hugely silted due to sluggish freshwater from upstream on the one hand and and strong saline intrusion from the sea on the other. At that time, Farakka Barrage was thought to be an answer to these problems.
The Farakka Barrage. Photo: Author
Even then, some lone voices highlighted the possible impacts of Farakka Barrage. Notably Mr. Kapil Bhattacharya, Engineer-in-Chief of West Bengal had warned about absence of sufficient water, catastrophic floods and sedimentation in the upstream back in 70s. When Pakistan (current Bangladesh was part of Pakistan during 1947-1971) upheld his views, he was branded as a traitor and lost his job. He had highlighted that one of the main reasons why Hooghly was desiccating was Damodar Valley Corporation (DVC) dams on Damodar and Roopnarayan Rivers.
The Farakka Barrage completed in 1975 has 109 gates, and a feeder canal of 38.1 kms emanating from the right bank, carrying water from Ganga to Hooghly. There is one more barrage at Jangipur in the downstream and afflux bunds in the upstream of Farakka, diverting waters of all smaller rivers like Pagla and Choto Bhagirathi into Farakka, effectively drying them in the downstream.
The Feeder canal is supposed to divert 40,000 cusecs water continuously from Ganga into Bhagirathi/ Hooghly. Hooghly-Bhagirathi itself is not a small river. It is a system drained by 7 tributaries like Pagla, Bansloi, Mayurakshi, Ajoy, Damodar, Rupnarayan, Haldi and the two offshoots of Ganga – Jalangi and Churni.
Location of Farakka Barrage Depiction From : Rudra, Encroaching Ganga and Social Conflicts
Impacts and performance of Farakka Barrage
Several grave questions are being posed on the utility of the barrage itself and its impacts. Some of the main points are illustrated below:
Hooghly estuary cannot be made silt-free by 40,000 cusecs from Farakka only
River Expert Dr. Kalyan Rudra, an authority on rivers in Bengal, especially their interactions with sediment, says that the initial objective of Farakka of flushing silt from the mouth of Hooghly has been “frustrated”[vi]. This assessment has been supported by many, including the past Superintending Engineer of Farakka Dr. P.K. Parua (Pers. Comm.) According to Kolkata Port Trust, the dredging of silt at Kolkata Port has been rising from 6.40 million cubic meters (MCM) annually from Pre-Farakka days to four time increase at 21.88 MCM annually during 1999-2003.
The answer, according to Dr. Rudra, lies in the fact that freshwater flow brought by the Hooghly Estuary, even with 40,000 cusecs from Farakka is just too meagre to flush sediments deep down the estuary. The difference between volumes of freshwater brought by Hooghly, as against the tide bringing saline water from south to north is as much as 1:78, making any deep flushing due to freshwater nearly impossible. Dams in the Hooghly Bhagirathi Basin by Damodar Valley Corporation have further arrested freshwater which could have naturally replenished Hooghly estuary. At the same time the stated aims of Damodar Valley Corporation, fashioned on the lines of Tennessee Valley Authority have not been fulfilled.
Currently, the functioning of Kolkata Port and Haldia port is entirely at the mercy of Dredging Corporation of India (DCI) to desilt the river to maintain sufficient draft (allowable depth of a ship’s keel under water). DCI gets about Rs 300-350 Crores per year for dredging the channel, although several problems have been unearthed like dumping the excavated silt back in the estuary from where it is washed back in the channel. In 2009, the Government of India had actually written to the Kolkata Port Trust, saying that it has become a “liability” and it should explain why it should continue to receive dredging subsidies. A PIL has been filed[vii] in 2013 in Kolkata High Court to save Kolkata and Haldia ports by intensive dredging.
Dredging the National Waterway I Photo: WRIS
It is clear that 40,000 cusecs water from Farakka is not able to help the Kolkata Port much as was envisaged earlier. SANDRP tried to talk with officials at the Kolkata Port Trust, but they declined answering any questions saying that Farakka is a bilateral issue.
This has led to a situation where we have the barrage and the impacts of two countries and millions of people, without even achieving objective for which the project was developed.
2. Sedimentation in the upstream of Farakka Barrage and its massive implications for India and Bangladesh
It is estimated that Ganga carries a silt load of 736 Million Tonnes (MT) annually, out of which about 328 MT of sediment gets deposited in the upstream of Farakka Barrage ANNUALLY[viii]. This annual addition of enormous sediment in the upstream of the barrage has made the river extremely shallow and any ship transport past Farakka has become nearly impossible. As we saw during our visit, islands/chars have formed barely a kilometer upstream the barrage, where animals graze, making any transport nearly impossible.
This massive retention of sediments has resulted in a two-pronged problem:
3. Contribution to delta subsidence and rising sea level in Bangladesh and India
Water released below Farakka barrage has significantly less silt load as about 328 MT silt gets deposited at Farakka. This water has a higher eroding capacity and erodes downstream riverbed. But there is an additional problem: World Heritage site of Sunderbans at the mouth of the Ganga-Brahmaputra-Meghna delta, shared between India and Bangladesh is witnessing possibly the first and highest numbers of Climate Change refugees in the world due to Ingressing Sea which is eating away at smaller islands and the delta. Part reason for this delta subsidence is sea level rise due to global warming and related changes, but the driving reason for encroaching seas is not only sea level rise, but the sinking river delta due to trapping sediment in the upstream dams and barrages like Farakka. The role of river sediments in building deltas is crucial. Ganga-Brahmaputra-Meghana Delta is subsiding rapidly and is categorized as a ‘Delta in Peril’ by experts like Syvitski et al, due to reduction in sediments reaching the delta and compaction of delta, furthering sea level rise. According to recent studies, the rate of relative sea level rise per year in the Ganga Brahmaputra delta is in the range of 8-18 mm per year, one the highest in the world. The related sediment reduction has been a whopping 30% in the twentieth century. (SANDRPs report on Delta Subsidence and Effective Sea Level Rise due to sediment trapping by dams: https://sandrp.wordpress.com/2014/05/07/sinking-and-shrinking-deltas-major-role-of-dams-in-abetting-delta-subsidence-and-effective-sea-level-rise/)
Farakka Barrage has been highlighted as one of the causes for this blocking of sediments at an important juncture. Any role played by Farakka in delta subsidence of GBM Delta has a massive impact on millions of people residing in this delta. According to Prof. Md. Khallequzamman (Pers Comm.), the amount of sediment influx flowing into Bangladesh from upper reaches in India has dropped from 2 billion tons per year in the 1960s to less than 1 billion tons per year in recent years, which is not enough to keep pace with rising sea.[ix]
4. Erosion in the Upstream of the barrage due to Sedimentation
Farakka Barrage is getting silted up due to millions of tonnes of sediment being deposited in the upstream annually. Ganga has been a meandering river, changing courses over centuries, forming paleo channel and ox bows. This deposition of sediment in the upstream is accelerating swinging of Ganga alarmingly to the left bank of the river. This is leading to tremendous erosion in Malda and surrounding regions. More than 4000 hectares of land in Malda has been eroded by the Ganga since 1970s. The river has also breached 8 embankments. Although a number of authors have conclusively written about this and even Legislative Assembly of West Bengal has been unequivocal in saying that “It is accepted all levels that the construction of Farakka Barrage is solely responsible behind the erosion of river Ganges in Malda district”, Central Water Commission trivializes this fact and does not accept any responsibility of Farakka.The only issue CWC seems to be bothered about is the health of the barrage itself which is compromised by erosion on the left bank. In official correspondences of CWC and MoWR scrutinized by SANDRP, the agencies do not mention anything about plight of thousands of people, who are refugees of a swinging river, but are only concerned about the strength of the barrage.[x]
According to Audit Report on Farakka Barrage by Indian Audit and Accounts Departments, between 2006-2012, the “Unintended Consequences” of Farakka include:
Induced water through feeder canal raised water level of Bhagirathi by about 5 meters near Jangipur and does not allow Bansloi and Pagla to join Bhagirtahi freely. A new wetland due to congestion formed Ahiron Beel which has submerged fertile land.
The barrage has trapped substantial sediment and hence river in changing course. In homogenous situation the oscillation of river is secular but it gets aggravated due to Farakka Barrage. On account of Rajmahal hills on right bank and Farakka barrage on the channel, the river erodes the left bank.
The 10 day cycle of increased and decreased release of water from the Barrage has resulted in a complex phenomenon of recharging ground water by river and then receiving base flow from groundwater ( when river is low). The frequent change in water level on account of 10 day altered flow adversely affects the rivers hydro geomorphology leading to escalating bank erosion.
River bed height in Farakka pondage has increased and the river is compensating this reduction by expanding its cross section sideways
Bank Erosion and Embakment breach at Hiranandpur Phot with thanks: Soumya Desarkar
5. Erosion Downstream of the barrage, leading to loss of life and property:
Sedimentation upstream the barrage, coupled with natural swing of Ganga has meant that the river is swinging to the left, encroaching the left bank, leading to erosion in thousands of villages, roads, fields in the downstream of the Barrage in India as well as Bangladesh, causing annual floods. The Irrigation Department West Bengal (Report of the Irrigation Dept for 1997-2001) itself has agreed not only about this erosion due to Farakka Barrage, but has also cautioned about the possibility of outflanking of the Farakka Barrage itself. Many experts maintain the eminent possibility of Ganga outflanking the barrage to flow through its old course of the 15th century, which will reduce the barrage to just a bridge.
On our visit to Farakka, Kedarnath Mandal, a veteran activist working on issued of Ganga and Farakka accompanied us to see extensive erosion in the left bank of the river in the upstream at Simultola as well as downstream in ChaukBahadurpur. In both these regions, the eroding river has paid little heed to the erosion control measures on the banks. Huge boulders have been swept with the current, destabilizing land in their wake.
Washing away erosion control measures at Chow Bahadurpur downstream FBP Photo: Author
We saw extensive bank erosion in the left bank on the downstream where all measures like bull headed spurs, dip trees, porcupines, gunny bags, geo-synthetic covers, boulders bars, boulder crates with nets, etc. have been eroded.
In all this din, the people residing in the chars, their leaders like Kedarnath Mandal, River experts and even the Legislative Council of West Bengal maintain that though erosion and changing courses is a character of Ganga, it has worsened and accelerated hugely since Farakka Barrage. In fact the 13th Legislative Assembly Committee (2004) in its 7th Report notes “It is accepted at all levels that the construction of Farakka Barrage is solely responsible behind the erosion of river Ganges in Malda district”.
6. Near Impossibility of desilting Farakka Barrage
To say that the challenge of desilting Farakka Barrage is Herculean, will be an understatement. The irreversible circle of events is highlighted by the fact that in order to have any appreciable impact, the amount of sediment lifted from the barrage should be at least twice the amount deposited per year, if the project is to be completed even in thirty years. But that seems impossible. According to Dr. Rudra, “Doing so will require a fourteen lane dedicated highway from Malda to Gangasagar” and the transport cost alone “would be nearly twice the revenue earned by Government of India in a year.” Dr. P.K. Parua also accepts that desilting the barrage will be next to impossible.
Such is the scale of sedimentation at Farakka.
7. Source of conflict with Bangladesh
Experts and authorities from Bangladesh have been raising the issue of impact of Farakka for several years now. Farakka Barrage not only obstructs the flow of sediments in Bangladesh, but also diverts waters of Ganga away from Bangladesh delta, depriving millions of fisherfolk and farmers from their livelihood. Water sharing from Farakka, particularly in lean season is now governed by Ganges Water Treaty of 1996. The Treaty holds force between 1 January to 31st May each year and water sharing calculations are based on 10 day flows. Some experts from Bangladesh have maintained that Ganges Water Treaty is not being implemented properly and Bangladesh is receiving less water than its due.[xi] There are issues raised by the Indian side as well of dwindling water availability. All in all, the barrage and the resultant Treaty continues to be a source of impacts for the river and people of the two nations.
Meeting officials at Farakka Barrage
SANDRP met with the Authorities at the Farakka Barrage Project office, which is under the Ministry of Water Resources (MoWR), at New Farakka. After meeting the officials, it was clear that they have no program for silt management at all. They do not even see this as an area of concern and are only concerned with anti-erosion works, which are failing miserably, and releasing water to Kolkata Port, which is not improving its navigability.
While some may argue, rather irrelevantly (considering the warnings of Kapil Bhattacharyya), that Engineers in 1950s, 60s and 70s were not equipped or aware of the issues related to sediment and its far-reaching impacts like erosion, deposition, floods, even sea level rise, the same in any case cannot be said about the current water management. They have the privilege of better knowledge, better resources and also lessons from past experiences. But despite having clear evidence that silt of Ganga is playing havoc with millions in India as well as Bangladesh, the Farakka Barrage Authorities tell us that they have no plan for silt management the barrage except annual erosion control measures.
The mandate of the barrage authorities is also 120 kms of bank erosion works, 40kms in the upstream and 80kms in the downstream. We were told on the condition of anonymity that this extensive work leaves little time even for maintaining the barrage. The bank protection work is also not permanent and is eroded with flood waves. The bureaucratic set up at Farakka makes it impossible to take proactive decisions about Barrage maintenance. The gates of the barrage need replacement, but there is hardly any agency interested in working for Farakka Barrage due to bureaucratic delays.
The officials told SANDRP that the only desilting measure that can be adopted is opening all gates of the Barrage, but that will not be possible unless all gates are replaced as many gates are faulty. Replacing all gates of Farakka will take at least two more years and we do not know even after that whether silt can be flushed. Such a flushing will need a major flood event and the impact of such sudden flushing of billions of tonnes of silt in the downstream will be unprecedented & huge.
Meeting with Farakka Barrage Authorities leaves one with more questions than answers.
Interview with past official of Farakka
SANDRP discussed the multiple issues of Farakka with one of the senior retired official from the Farakka Barrage Authority who has seen the work of the FBPA closely over several years. Some excerpts from these discussions.
SANDRP: Sir, do you think Farakka is fulfilling its functions?
Answer: Farakka was not only designed for diverting water for Hooghly, it was foreseen that there may be an Irrigation component and even a hydropower component. But the inflow at the barrage was over calculated. We never had that sort of inflow in the project. Add to this Treaty with Bangladesh in 1996 and India was left with little water. I would say objectives of Farakka were only partially fulfilled. The barrage has a designed discharge of 27,00,000 cusecs and we have been able to achieve that discharge only twice since commissioning the barrage. In the recent years, water flow has been declining sharply at the barrage. This further handicaps all its functions.
SANDRP: There are several problems associated with silt deposited in the upstream of the barrage like floods, change in course of the river, erosion, etc. Is there any way to tackle this deposited silt?
Answer: Yes, that is a serious problem. This is being faced by ports and barrages the world over and also across India. There are so many players responsible for the increasing silt load and reduced water in the river, right from Nepal.
We can say that the scale of the sediment issue was not understood when the barrage was designed, the engineers then did not have the knowledge or tools for this. Even now, there is no easy way this issue can be tackled. Desilting the barrage would be very costly, and what would be do with the collected silt? Malda and Murshidabad region is densely populated, we cannot dump it anywhere. If we dump it in the river, there will be other problems. It is possibly an evil we have to live with now.
SANDRP: There are plans to erect about 16 more such barrages on the Ganga main stem. What would be the lessons from Farakka for these barrages?
Answer:I think this is a horrible plan. In addition to the challenge of silt, I wonder where will the water come from? Supplies from Upper Ganga Canals are increasing, reducing water flow in the river. Uttar Pradesh is increasing the capacity of Lower Ganga Canals. More and more abstraction will happen. Such a plan does not seem feasible and will be harmful for the river as well.
Ecological Impacts
There’s no Hilsa here
Farakka Barrage has stopped migration of economically important species like the Hilsa (Tenualosa ilsha) and Macrobrachium prawns, both Ilish (Hilsa) and Chingri (Macrobrachium) hold a special significance to people in West Bengal and Bangladesh. A lot has been written about the Barrage’s disastrous impact on Hilsa production and impoverishment of fisherfolk in India and Bangladesh[xii]. About 2 lakh fisherfolk in Malda district alone depend on riverine fisheries and Hilsa here was the backbone of the fishing economy.
Although Central Inland Fisheries Research Institute (CIFRI) has a lab to work on Hilsa, the institute is not working on Fish passes or Hilsa Hatcheries at the Barrage itself!
Fishermen upstream Farakka are a worried lot Photo: Author
Prior to commissioning Farakka Barrage in 1975, there are records of the Hilsa migrating from Bay of Bengal right upto Agra, Kanpur and even Delhi covering a distance of more than 1600 kms. Maximum abundance was observed at Buxar (Bihar), at a distance of about 650 kms from river mouth. Post Farraka, Hilsa is unheard of in Yamuna in Delhi and its yield has dropped to zero in Allahabad, from 91 kg/km in 1960s. Studies as old as those conducted in mid-seventies single out Farakka’s disastrous impacts on Hilsa, illustrating a near 100% decline of Hilsa above the barrage post construction.[xiii]
We met fishermen who have not caught a single Hilsa in the upstream of the barrage despite fishing for three days. In the downstream too, size and recruitment (population) of Hilsa is affected due to arrested migration at Farakka. Some 2 million fisherfolk in Bangladesh depend on Hilsa fishing. Hilsa in Padma river (Ganga in India) downstream Farakka has also declined sharply due to decreasing water and blockage of migration routes.[xiv]
Lone Hilsa caught by a fishermen after three days of effort, sold for a pittance to local fish dealer. Photo: Author
These fisherfolk have never been compensated for the losses they suffered. They were not even counted as affected people when the barrage was designed and they are not counted even now.
Fable of Farakka Fish Lock
The tale of Farakka Barrage Fish Lock is another tragic story. Fish Lock is a gated structure in a Barrage that needs to be operated specifically to facilitate migration of fish from the downstream to the upstream or vice versa to breed, feed or complete their lifecycles.
According to Central Inland Fisheries Research Institute (CIFRI), Farakka Barrage has two Fish Locks between gates 24 and 25. The locks need to be operated to aid fish migration and transport fish. We talked with the Engineers at Farakka Barrage Authority, local villagers, fishermen and even the Barrage Control Room officials who operate the gates of the barrage about the functioning of the Fish Lock. No one had heard about a Fish Lock. There is some information that there is one more lock further upstream in the river, but the FBP Authorities did not seem aware of this.
The control room officials kept showing us the ship lock at the Barrage (which is also rarely used due to turbulence and sedimentation) and told us categorically that “There is nothing called as fish lock here”. The locks have not been operated for a minimum of a decade, possibly much longer.
Who is responsible for the loss of fisherfolk income in the meantime? Will the Farakka Barrage Authority or the MoWR or the CWC or the Kolkata Port Trust or Inland Waterways Authority of India compensate them?
Fisherman upstream Farakka Barrage. He says Hilsa is nearly wiped out from here and there is intense conflict for a meager catch. Photo: Author
According to Dr. Parua, fish locks were operated for some time when he was posted at Farakka, but they never worked as planned. He believes that a bare 60 feet fish lock for a barrage that is more than 2.6 kms long is of little use. There should have been more fish locks planned. He also lamented about the non-functionality of Hilsa Fish Hatchery set up at the banks of the barrage. (We were not even told about the presence of this structure by any of the officials or other concerned persons we met and possibly it has now fallen to complete disrepair now.) He said despite Central Inland Fisheries Research Institute (CIFRI) is based in West Bengal and has a special cell to study Hilsa, they or the Fisheries Department have taken no interest in the functioning of the hatchery or the Fish Locks.
2. Vikramshila Dolhin Sanctuary, Bhagalpur
Bhagalpur is barely 150 kms upriver from Farakka and Dr. Sunil Chaudhary, a past Member of the Sate Wildlife Board of Bihar has been working relentlessly on conservation of Gangetic Dolphins, as well as rights of traditional fisherfolk in Bihar and around Vikramshila region.[xv] SANDRP discussed the issue of Farakka and additional barrages with him. Dr. Chaudhary states that not only barrages, but the dredging itself will have serious impacts on Dolphins. Impacts of Farakka Barrage on fish and fisherfolk in Bihar is still being felt. No Hilsa reach here from Farakka and a generation of fisherfolk has suffered due to this. Forget more barrages on the Ganga, we need a review of Farakka Barrage itself as Ganga Mukti Andolan has been asking for years now.
Any work affecting Vikramshila Dolphin Sanctuary will require clearance from State Wildlife Board, State Wildlife Warden and National Board for Wildlife. We hope that such permissions are not given without due diligence and independent application of mind and at least whatever remains of Ganga is maintained.
In conclusion
The issues arising out of Farakka are extremely serious. Our planners and decision makers may claim that many of the impacts were not foreseen (Not entirely true). But the issue cannot be ignored any longer. We need a credible independent review of the development effectiveness of Farakka Barrage, including costs, benefits and impacts.
What we seem to be doing now is to repeat the mistakes of the past with new barrages planned on the Ganga.
The existing Upper Ganga Barrage (Bhimgouda Barrage) has dried up the river in the downstream. The river is diverted in a canal, where people take ritual baths, while the original riverbed is used as a parking lot.
Dry Ganga downstream Upper Ganga, Bhimgouda Barrage in Haridwar Photo: Author
The Lower Ganga (Narora Barrage) has severely affected fish migration & dried up the river in the downstream at least in lean season. The Barrage has a fish ladder, but there is no monitoring or concern as to whether it is working or not. In its report to the World Bank, Uttar Pradesh Government has said that the “condition of the barrage is poor” and has lamented about increased siltation in the upstream of the barrage and the inability to flush the sediments due to poor condition of its gates.[xvi].
Beyond doubt, the existing barrages, especially the Farakka Barrage have had massive impacts on the river, its ecosystems and its people. We have many critical lessons to learn from these experiences. In stead, we are pushing for more barrages on a river which will only compound existing problems.
Ganga is much more than a waterway or a powerhouse. It is a river, supporting not only urban areas and industries, but rural communities, the basin, the ecosystem and myriad organisms in its wake and it needs to be respected as an ecosystem first, rather than for sentimental reasons like mother or goddess.
The Ganga is being fettered at its origin in the Uttarakhand by over 300 hydropower dams. In addition, if it is again dammed many times over times in its main channel, then the government will not have to worry about River Rejuvenation Plan. There will be no river left for rejuvenation.
A Photo Feature on Farakka Barrage: https://sandrp.wordpress.com/2014/09/29/world-rivers-day-and-ganga-a-look-at-farakka-barrage-and-other-such-calamities/