Dams

Blow by Blow, how pollution kills the Yamuna  river: A Field Trip Report

              Yamuna River from Hathini Kund Barrage to Delhi (All maps from Google Earth, created by author)

A field trip along the Yamuna River this April 2015 showed how the river is killed blow by blow, by the pollution and diversion. The visit was planned with an objective to study and observe actual status of industrial and domestic pollution reaching River Yamuna via various Escapes and Drains in Haryana, upstream Delhi. A team of two members Sri Manoj Misra, Yamuna Jiye Abhiyan and Bhim Singh Rawat, SANDRP spent three days (03-05 April 2015) closely travelling along the river through four districts of Haryana (Sonipat, Panipat, Karnal and Yamuna Nagar) and tracking various drains, escapes (from origin) which pour massive amount of effluents  in River Yamuna . Continue reading “Blow by Blow, how pollution kills the Yamuna  river: A Field Trip Report”

Arunachal Pradesh · Bhutan · Cumulative Impact Assessment · Dams · Hydropower

Cumulative Impact Assessment of Tawang Basin: Highlights from the NEHU Study

“We want sacred rivers of Tawang to flow freely, not inside Tunnels!” What makes the assertion on this banner more remarkable is the fact that the people holding it up are not fiery activists, but peace-loving Buddhist monks of the Monpa community, from the farthest corner of Arunachal Pradesh: Tawang (photo by Urmi Bhattacharjee).  About 13 hydropower projects are slated to come up on main river stem and tributaries of Tawang Chhu (River) in Tawang in a distance of just  160 kms[1].

Monpa Child from Tawang Photo: tawang.nic.in
Monpa Child from Tawang Photo: tawang.nic.in

Tawang is a tiny district of Arunachal Pradesh nestled between Tibet and Bhutan. The region has had a troubled past and is home to Monpa Buddhists who practice an ancient form of Buddhism. Monpa culture itself is unique and fragile, with less than 50,000 Monpas in Tawang and less than one lakh globally. The region is famed for Tawang Monastery, Galden Namgey Lhatse (which literally means Celestial Paradise on a Clear Night), which is the 2nd largest monastery in the world. Continue reading “Cumulative Impact Assessment of Tawang Basin: Highlights from the NEHU Study”

Hydropower Performance

Diminishing Returns from Large Hydropower projects in India

 Above: Graph showing how the power generation per MW installed Hydro Capacity has been doing down over the last two decades

As per the latest power generation figures just released by the Central Electricity Authority[1] the hydropower generation during the just concluded Financial Year 2014-15 was 4.25% lower than the previous year’s generation even though the installed capacity has gone up. Average generation per MW of hydro capacity in India in 2014-15 was over 20% less power than what our average generation was in 1993-94. More worryingly, the hydropower generated per MW installed capacity continues its downward slide, the downward slide has been going on for now over two decades. Continue reading “Diminishing Returns from Large Hydropower projects in India”

Maharashtra · Telangana

Pranahita Chevella Project: What it means for the affected people in Maharashtra

Above: A farmer family crosses the Pranahita river close to the Pranahita-Chevella project barrage site. Photo: Harpal Singh, The Hindu

Shivni is a small village of about 700-800 population in Gondpimpri Tehsil of Chandrapur District situated right at the confluence of Wardha and Weinganga rivers. These two rivers meet at juncture of three districts of two states (viz. Gadchiroli & Chandrapur of Maharashtra and Adilabad of Telangana) to form River Pranahita which is one of the biggest tributaries of Godavari. Pranahita travels a length of 113 km and meets Godavari at Sironcha tehsil of Gadachiroli Dist. Continue reading “Pranahita Chevella Project: What it means for the affected people in Maharashtra”

Dams

Reflections on the Origin of the Kosi Project

Guest blog by Dr Dinesh Kumar Mishra[i] (dkmishra108@gmail.com)

I was recently trying to look into the flood history of Bihar’s post-independence period and came across this interesting article by Hari Nath Mishra written in 1950 but published on September 3, 1967 in The Searchlight – Patna. Hari Nath Mishra later became the Speaker of the Bihar Legislative Assembly, Health Minister in Bihar and also was the Central Deputy Minister of Irrigation and Power later when Dr. K.L. Rao was the Irrigation Minister at the Centre. I was lucky to have met him in 1986 when he talked about the problems ailing the Kosi Project and that the ambitions of the people were not met as the embankments constructed along the river did not serve the purpose that they were expected to. Irrigation from the project was far below the targets fixed by the Project Engineers, power production was abysmally poor and the rehabilitation of the embankment victims was in deplorable state. I quote the article verbatim here and try to give some more to it during subsequent period. Continue reading “Reflections on the Origin of the Kosi Project”

Maharashtra

Krishna Marathwada Project: A costly pipe dream?

Above: A board at the dam site proclaims: “Beware, dam work ahead”. The warning pretty much sums up the situation of Krishna Marathwada Project Photo: Parineeta Dandekar

It was a blazing hot afternoon, made hotter by the subconscious association of Marathwada with all things dry, parched and drought-stricken. I was standing on the half completed dam wall of the Khuntephal Storage Tank in Beed, along with Macchindra Thorave and his colleagues. I’ve seen many dams and many dam walls, but it was impossible to believe this was a dam wall, supposed to impound 5.68 TMC of water (TMC=Thousand Million Cubic Feet. 1 TMC=28.317 billion liters). Primarily because there was no water in sight on either sides of the dam! There was no river in sight either! It actually looked like an under-construction road connecting two hills.

But as I realized later, being a part of the Krishna Marathwada Lift Irrigation Scheme and Krishna Bhima Stabilisation Project, issues like water were inconsequential.  This was Dam for Dam’s sake.

Half completed wall of the Khuntephal/Ashti Storage Tank, part of the Krishna Marathwada Project. Photo: Parineeta Dandekar
Half completed wall of the Khuntephal/Ashti Storage Tank, part of the Krishna Marathwada Project. Photo: Parineeta Dandekar

Continue reading “Krishna Marathwada Project: A costly pipe dream?”

Dams

DAMS, RIVERS & PEOPLE Jan 2015 and Feb-March 2015 issues

The Jan 2015 issue of DRP magazine can be found at: https://sandrp.in/wp-content/uploads/2015/03/drp-jan-2015.pdf.

The Feb March 2015 issue of DRP magazine can be found at: https://sandrp.in/wp-content/uploads/2015/03/drp-feb-march-2015.pdf.

The Cover pages of the two issues can be seen below:

DRP Jan 2015 Cover Page
DRP Jan 2015 Cover Page

Continue reading “DAMS, RIVERS & PEOPLE Jan 2015 and Feb-March 2015 issues”

Delhi

ENSURING ENVIRONMENTAL FLOWS IN INDIAN RIVERS

Above: Dead river Yamuna at Mawi (Panipat) in Haryana (Photo by Yamuna Jiye Abhiyaan)

Guest Blog by: Manoj Misra (yamunajiye@gmail.com)

A perennial river that does not flow is no river. This is because flow enables a river to fulfil its various ecological functions of which completion of the water and nutrient cycles; maintenance of aquatic and riparian flora and fauna and recharge of ground water through aquifer action is the most evident and critical. The recharged ground water also helps meet a number of human dependencies like irrigation and drinking water supplies.

On this World Water Day (March 22) 2015, following the 6th meeting of the Yamuna Review Committee held under chairperson ship of Union Water Resources Minister Sushri Uma Bharti (See Annexure for the PIB Press Release about it) on March 20, 2015, this blog shows how it is possible to achieve environment flows in Yamuna River. Hope all the concerned state governments including that of Delhi headed by Arvind Kejriwal, Union Water Resources Minister and the National Green Tribunal that made an order in this regard, will take due note of this.

The state of the Yamuna has reached a boiling point as eleven members of the Yamuna Muktikaran Abhiyaan have started a fast unto death on March 21, 2015 in Delhi, charging Union Water Resource Minister Uma Bharti that “she only made hollow promises. She barely knew about the issue”. This group has been marching to Delhi every year since last three years and have felt cheated by the authorities each time. They decided to end the protest action on March 22, 2015 under some rather vague promise by the government that within two months Yamuna river will be brought under Environment Protection Act, 1986.

Continue reading “ENSURING ENVIRONMENTAL FLOWS IN INDIAN RIVERS”

Maharashtra

Lawlessness in Maharashtra’s Water Sector

Above: Increasing height of a dam which holds no water Photo: Parineeta Dandekar

Guest post by Pradeep Purandare, pradeeppurandare@gmail.com

Irrigation Laws in Maharashtra: Politics of Non-Implementation

Laws are generally enacted to implement the policy by the ruling class & its government to promote & safeguard its own class & caste interests. However, while drafting the policy & laws, politically correct concepts & terminology in fashion is used for public consumption. New things are accepted because those come as conditions for getting the loan from donor agencies. Creating a desirable image or impression at national / international level can also be the motivation. Adopting a new policy or enacting a new law does not necessarily mean that the establishment of the day sincerely believes in that policy & law. Once the purpose of getting the loan and or creating an impression is served, government conveniently forgets implementing the policy & the law. Or, implementation is done in selective & superficial manner. Clauses / sections which were included for public consumption & which can really make the difference, if implemented in letter & spirit, are generally either put in cold storage or subsequently amended to make them more “practical & workable”. This does not happen as a result of inefficiency, callousness or indifference. This happens with purpose & by well defined strategy. This is politics of non-implementation! It is done to implement the hidden agenda. Of course, it’s not something new. It has been happening since long & in most of the walks of life. This paper makes an attempt to simply describe how politics of non-implementation is being done in water sector in general & in the field of irrigation in particular in Maharashtra – a supposedly progressive, highly industrialized & a modern State of India.

Enacting a law is not sufficient. The operative part which includes rules, notifications, agreements, government resolutions, orders & circulars as per the new Act is also equally important. If operative part is not in place, then the Act remains on paper for all practical purposes.

PLEASE SEE ANNEXURE 1 for Detailed table.

Gist of missing operative parts & its implications are given below:

In absence of rules (yes, MIA 76 does not have rules for last 37 years!) & non-issuance of basic notifications (rivers, command areas & appointment of Canal Officers), MIA 76 which is supposed to be the parent Act has remained mostly on paper. Locus standi of implementing authority i.e. Water Resources Department (WRD), therefore, can itself be questioned. The obvious result is there is no water governance. Free for all situation exists. Water theft, vandalism & tampering with canal system are rampant. Offences go un-punished. Irrigators, particularly the tail enders neither get water nor compensation. Politically influential irrigators grab all the benefits. Diversion of water from irrigation to non-irrigation, flow irrigation to lift irrigation & food crops to cash crops becomes easy. Since nothing is legally committed, nothing can legally be challenged. The overall situation is best suited for privatization. An un-notified river or command area, relatively speaking, can easily be handed over to private company. That’s seems to be the ulterior motive of missing operative part!

MMISF Act was brought in to legally provide for Participatory Irrigation Management (PIM). World Bank insisted for the enactment & made it a compulsory condition for getting the loan under Maharashtra Water Sector Improvement Program (MWSIP). WRD, therefore, had to succumb. It however did not comply in letter & spirit. Ambiguity in rules for WUAs at higher level, non formation of sub committees, delayed or non execution of agreements with WUAs, insincerity in the processes such as “joint inspection” to “handing over”, not providing measuring devices, confusion over powers of WUAs, keeping lift irrigation out of purview of the Act, inordinate delays in returning part of tariff to WUAs for carrying out maintenance & repairs and last but not the least, non involvement of WUAs either in water budgeting or in conflict resolution speak volumes about the actual implementation of MMSIF Act. Intentions of WRD are clear & obvious. It considers WUAs as just a stop gap arrangement before going for corporatization & contract farming. One can imagine WRD’s line of argument in near future. It could be as follows “We tried our level best but WUAs could not succeed. Government cannot now take the responsibility of water management. Privatization appears to be the only way out”. Incomplete legal processes thus help establishment & make tail enders vulnerable.

Maharashtra established an Independent Regulatory Authority (IRA) in water sector by enacting MWRRA Act. It’s no doubt a pioneering effort. But the actual implementation of this Act is frustrating. There was reluctance to prepare the rules. Rules were prepared after 7 years from the enactment of the Act & that too only after an order to that effect by the High Court. Prepared rules, it is alleged, are contradictory to the provisions of the Act. They have been challenged & the matter is sub-judice.[yesterday Maharashtra’s legislative council had to discuss the issue in the house & Minister for WRD had to stay the implementation of rules] State Water Board & State Water Council has been legally constituted way back in 2005 to respectively prepare & approve the Integrated State Water Plan (ISWP). Both the board & council have not yet started their functioning. Obviously ISWP which was to be prepared within one year from the enactment of the Act is still not in place even after 8 years. MWRRA as per its own Act is supposed to take decisions with reference to ISWP. But it is going ahead even without ISWP. Similarly, River Basin Agencies (RBA) have not been operationalized & issuing water entitlements by RBAs has not so far materialized. MWRRA Act has been amended in 2011 to retrospectively protect non transparent decisions of High Power Committee regarding transfer of water from irrigation to non-irrigation. Powers of MWRRA in respect of sectoral water allocation have already been withdrawn by the said amendment. Effective area under water entitlement thus has been drastically reduced. MWRRA recently decided the criteria for water tariff. But it opted for the safest path. It reduced the water tariff to avoid criticism. But in the process whether it could follow the mandate given by the Act is a moot point. Act says that water tariff should fully recover the O & M Cost & canal system should be properly maintained. Ever deteriorating condition of canals in Maharashtra, however, tell a different story. Regulation of all types of water (surface & ground water) & its uses for different purposes (drinking, domestic, industrial & irrigation) is supposed to be done by MWRRA. Nothing significant has been done so far. In fact, in case of dispute over sharing Godawari Waters between upper & lower Godawari basins, MWRRA has been a silent spectator. As a quasi- judicial IRA it could have done many things. But it preferred playing politics of non-implementation..

Very structure & framework of water governance are thus missing in Maharashtra & hence, there is no Rule of Law. Water conflicts of all types are on increase at all possible levels. Misappropriation & mismanagement is the end result.

It is necessary to develop pro-people intervention strategies & peoples participation in water sector. Implementation of existing water laws could be a necessary (but of course not sufficient) beginning. There are many provisions in the existing water laws that could help initiate pro people intervention.

Politics of ‘non-implementation by ruling class’ needs to be effectively & immediately challenged by `politics of implementation by pro people forces’. That would help promote people-centered interventions which are so urgently required to fight diversion of water from irrigation to non-irrigation & privatization of water.

Annexure 1:

Implementation of Water Laws in Maharashtra: A Critical Review

                Sections Present status Impact

MIA,76

Sec 114: Rules Rules not prepared in 37 years Act remains on paper
Sec11: River  notification Incomplete in many projects People not informed/ opportunity of being heard denied. Locus standi of WRD doubtful
Sec 3: Command  notification Incomplete in many projects —- do ——–
Sec 8: Appointment of Canal Officers Done but not operative No one takes initiative. Nobody is held responsible. Free for all situation. Water theft, vandalism & tampering with canal system are rampant. Offences go un punished. No FIR. No action.
Sec 75 to 87: Award of

Compensation

Not used at all. Irrigators don’t get compensation even if the agreed volume of water is not delivered at right time & place. No accountability for the Canal Officers.

MMISF Act, 2005

Sec 76: Rules Prepared. Excessive use of “mutatis mutandis

Ambiguity in rules for WUAs at higher level

Sec 20: Sub committees

Not formed in last 8 years Purpose of participation with decentralization & expanding the circle of knowledge & skill defeated.
Sec 21,29: Agreement Not executed in time & at all levels of WUAs

Serious complaints about not having  joint inspection in true sense, non- completion of agreed repairs & rehabilitation & reluctance by officers  to hand over the system

Purpose of delegation of powers & imbibing sense of responsibility defeated. Encroachment on powers of WUAs

Nexus between local Politicians & officers continues unabated. WRD loses its credibility. Poor quality of repairs & rehabilitation. In absence of real handing over of management to WUAs, power of water distribution remains with WRD officials. Only lip service to participation.

Sec 22: Joint inspection,

…..handing over … and

Sec 23: Measuring devices

(MD)

Not executed in time & at all levels of WUAs

Serious complaints about not having  joint inspection in true sense, non- completion of agreed repairs & rehabilitation & reluctance by officers  to hand over the system

Providing MD is not yet complete. Credibility of  measurement records is doubtful

Volumetric supply of water to WUAs mostly remains on paper.
Sec 28: Supply of water as per entitlement In absence of proper water budgeting at project level, irrigation scheduling of main system & MD, supply of water as per entitlement is an exception rather than a rule. Bulk supply of water based on entitlement given volumetrically is still a distant dream. WRD is not yet fully equipped for the purpose with compatible physical system.

Sec 30: Powers to WUAs

Not spelt out WRD officials wield the real power.
Sec 38: Competent Authority Not operative WUAs don’t get any technical advise

Sec 39 to 51: Lift Irrigation WUAs

Provisions not brought in force No control over – & regulation of – lift irrigation. Act simply not made applicable to lift irrigation..

Sec 52: Powers & functions of WUAs

Only responsibilities(& not powers) have been spelt out WUAs remain ineffective.
Sec 53: Powers & functions of Canal Officer Emphasis on powers & not on responsibilities In absence of accountability of any kind, WRD officials remain indifferent & callous
Sec 54: Sources of Funds of WUAs Water tariff collected from the members of WUA is the only source of income. WRD has promised to return substantial part of tariff to WUA. However, the promise is not being kept. Most of the WUAs are not economically self reliant. They face problems in routine maintenance & repairs of the canal system and can’t afford to maintain office & staff.

Sec 60 to 62: Offences & penalties

Not operative.

No water governance worth the name.

Sec 63 & 64: Conflict Resolutions Not operative. MWRRA indirectly attempts to bypass the powers of upper level WUAs through regulators WUAs not involved in conflict resolution. Purpose defeated.

Sec 68: Water budgeting at Project Level

Not operative. WUAs not involved in water budgeting. Purpose defeated.
Sec 70:  Water supply for  non-irrigation purposes Water entitlement issued only to select WUAs in selected projects. Unit for issuing entitlement is not project as a whole. Therefore, ineffective provision. Water supply to non-irrigation gets priority even during periods of shortage of water. Second priority given to irrigation by amending State Water Policy is not being honoured.

Sec 71: Recovery of water charges

Coercive measures not operative. Recovery of water tariff is very poor.
Sec 72: Act to apply to

Existing WUAs

Difference of opinion between WRD & Cooperative Department regarding how to operationalize the provision

Act not being applied to existing WUAs

MWRRA Act, 2005

Act amended in 2011 to retrospectively protect non transparent decisions of High Power Committee regarding transfer of water from irrigation to non-irrigation

Sec 3: Establishment of Authority

Retired bureaucrats are in control.

Powers of MWRRA regarding sectoral allocation withdrawn.

Effective area under water entitlement drastically reduced. There is hardly any regulation as per the Act. Issue of releasing water to Jayakwadi project from up – stream projects is the glaring example.

Sec 5: Selection Committee Serving bureaucrats are in control. Members of selection committee select themselves as Member / Secretary of MWRRA & join the authority soon after retirement from Government.
Sec11: Powers, functions duties of authority Selective & limited implementation. Sec 11 (f) not implemented. Project clearance even without Integrated State Water Plan [ISWP] Adhocism, confusion & regional imbalance in water resources development may further increase
Sec 12: General policies of Authority

Not implemented even when water users have moved the court of law. Several petitions pending in Mumbai High Court

Principles of Tail to head irrigation & equitable distribution of water at river basin level not implemented leading to political agitations & increased animosity within regions of the State.
Sec 13: Dispute Resolution Officers

Appointed. Not active.

In absence of information & awareness about provisions in the Act, water users don’t insist for suitable action. Hence, it is assumed that absence of complaint means absence of dispute itself.

Sec 14: Permission of River basin Agency

River Basin Agencies though exist as per law, they have not started functioning like RBAs

Since RBAs have not issued any water entitlement & not officially permitted any water use whatsoever, every water use since enactment of the Act could be, legally speaking, unauthorised & hence, illegal.
Sec 15: State Water Board

Legally constituted but not at all functioning.

SWB (Chairperson- Chief Secretary) is supposed to prepare ISWP.  Nothing happened in last 8 years.

Sec 16: State Water Council

Legally constituted but not at all functioning.

SWC (Chairperson- Chief Minister) is supposed to approve ISWP.  And then MWRRA should function as per ISWP. Nothing happened in last 8 years. MWRRA is taking decisions violating Sec 11 (f) of its own Act.

Sec 21: Special

Responsibility of

Authority

Not implemented Gravity & seriousness of issues regarding backlog in irrigation has not reduced. In fact, it has increased a lot.

Sec 22: Disputes & Appeals

Not in use by the water users. Lack of awareness.

Grievance redressal mechanism provided in the Act, if used, could reduce number of cases going directly to court of law.
Sec 23 : Directives of

Government

Not given so far Government could have used this route instead of amending the Act in haste & panic. It could have also given directions to MWRRA in case of Jayakwadi dispute.
Sec 26: Punishment for

non-compliance

Not used so far.

No effective governance

Sec 30: Rules

Prepared late only after High Court’s order. Rules to certain extent are contradictory to the provisions in the Act Discontent about Rules in Marathwada. Rules challenged in court of law. MLAs requested to challenge the rules in legislative assembly & council

References:

  1. Maharashtra’s State Water Policy, July 2003
  1. Maharashtra Irrigation Act, 1976 (MIA76),
  1. Maharashtra Management of Irrigation by Farmers Act, 2005 (MMISF Act)
  1. Maharashtra Water Resources Regulatory Act, 2005(MWRRA Act)
  1. Purandare Pradeep, “Wanted – Rule of Law”, http://www.downtoearth.com

***

– Pradeep Purandare

Retd. Associate Professor, Water & Land Management Institute, Aurangabad, Maharashtra

(The above piece is based on a paper presented at the  International Conference, Dec 19-21, 2013,Organized by College of Social Work, Nirmala Niketan, Mumbai, India)

pradeeppurandare@gmail.comhttp://jaagalyaa-thewhistleblower.blogspot.in/,  http://www.irrigationmainsystem.com

Bihar · Floods · Kosi

Breach in Chamarbandha Embankment in Samastipur-1958

Above: Samastipur Floods 2013  Photo: RailIndia

Guest blog by Dr Dinesh Kumar Mishra[1] (dkmishra108@gmail.com)

Background There was an unexpectedly heavy flood during 1953 in Bihar that led the State leaders to think about the flood control measures to be taken seriously. The losses incurred in the State in floods prompted the Government of India to formulate its first Flood Policy and take preventive and corrective steps so that the flood victims are helped in whatever way possible. While the Flood Policy was given the final shape and announced in September, 1954 Bihar was already under a severe spell of floods in 1954. The 1954 flood is still counted as one of the worst floods in the history of Bihar and remembered well by the elderly generation. Following the floods of 1954 and promulgation of the National Flood Policy many embankments were constructed along the Bihar rivers and the Burhi Gandak that passes through the present districts of W & E Champaran, Muzaffarpur, Samastipur, Begusarai and Khagaria and joins the Ganga about 25 km below Khagaria town was one to be embanked in its stretch below Champaran. Continue reading “Breach in Chamarbandha Embankment in Samastipur-1958”