Dams

Dams, Rivers & People: July 27, 2015

HYDROPOWER

Thermal, Hydro Power projects on the blink despite clearances by government (23 July 2015) Power sector is now bereft of capital flow. While thermal power projects might see some respite, hydropower projects continue to fester even after getting all the clearances. This puts a question mark on the claims of the hydro lobby that environment ministry and environment clearances are responsible for delaying the projects. Of the 80 stalled power projects, around 25 are hydro-based. Due to delays, the cost of the project, in almost all cases, has increased manifold thereby inviting regulatory tiff over tariff. NHPC’s Subhansari Power Project remains stalled due to the agitation in Assam. NHPC officials need to be held accountable as to how did they start the work without addresing the downstream impacts issues. Due to their callousness, the cos has doubled and work is stlled for over 3.5 years. http://www.business-standard.com/article/economy-policy/power-projects-on-the-blink-despite-clearances-by-government-115072200024_1.html

JAMMU & KASHMIR:  Baglihar Hydro Electric Power project threatens Doda, Kishtwar (27 July 2015) Baglihar HEP is making life difficult with landslides, floods and additional submergence: “Before construction of dam, rocks were visible on both banks of the river. But when water level increased and became stagnant, rocks are nowhere in sight and water has entered loose soil. The root cause of frequent landslides and sinking of area in Doda districts on both side sides of the dam is stagnant water.”GM Bhat, Geological expert. http://www.tribuneindia.com/…/baglihar-power-pr…/111641.html

Continue reading “Dams, Rivers & People: July 27, 2015”

Climate Change · Dams · Maharashtra

We pushed large dams, not irrigation, this has to change: CM Fadnavis’ Assembly Speech

“Maharashtra has the country’s 40% large dams, but 82% area of the state is rain fed. We have moved away from our vision of watershed and conservation…We did not think about hydrology, geology and topography of a region before pushing large dams everywhere. But this has to change”

These are not the words of an activist or water researcher. This was said by Maharashtra’s Chief Minister Devendra Fadnavis, during Monsoon Assembly Session of Maharashtra on 21st July 2015. Continue reading “We pushed large dams, not irrigation, this has to change: CM Fadnavis’ Assembly Speech”

Dams

Maletha; Battle won but war remains to be fought

Chronicle of an emphatic victory against crushers continued from May 2015 onwards

After hosting two days long workshop on Sustainable Mountain Development (02-03 May 2015) Maletha continued its agitation against stone crushers. The event popularised the villagers’ strength and struggle on wider platform.

On 8th of May 2015, villagers issued warnings of resuming indefinite hunger strike if the govt. failed to take a stand on the issue of stone crushers. A protest march was organized on 15th of May 2015 and two villagers Vimla Devi, head of Mahila Sangrash Samiti and Dev Singh Negi started observing fast on alternate days. Setting 25th May 2015 as deadline for State Govt. to act, villagers again demanded closing down of all illegal stone crushers running in Kirti Nagar block.

Meanwhile referring to High Court Nainital (HCN) April 2015 order, State Govt communicated that firm action will be taken against crusher units violating the stipulated norms. Following that, Commissioner Garhwal (GC) CS Napalchyal visited Maletha. Despite finding one stone crusher belonging to Satyam Shivam Sundaram Company violating environmental norms, he ordered a magisterial probe in the matter. Feeling disappointed by state machinery, Hemanti Negi a village woman sat on indefinite hunger strike on 25th May 2015.

Continue reading “Maletha; Battle won but war remains to be fought”

Dams

Six regions of India facing prospects of crop failure and drought?

IMD rainfall map for July 13, 2015
IMD rainfall map for July 13, 2015

At least six of the 34 Meteorological divisions of India seems to be facing the prospects of crop failure and drought, if we look at the rainfall in these divisions in last 18 prime monsoon days from June 25, 2015 (monsoon had set in almost all over India by that date) to July 13, 2015, the latest date for which division wise rainfall are available. In these six sub-divisions, the rainfall during these 18 prime monsoon days has been between 0.1 mm to 12.8 mm. Continue reading “Six regions of India facing prospects of crop failure and drought?”

Dams

Dams, Rivers & People: July 13, 2015

HYDRO POWER

UTTARAKHAND: Vishnugad-Peepalkoti Hydroelectric Project affected protested against World Bank (09 July 2015) The affected people of Vishnugad-Peepalkoti Hydroelectric Project (VPHP) have surrounded the officers of World Bank with the slogan of “World Bank Go Back, Let Ganga free”. In even the bad weather and rain, almost 70-80 people have surrounded the hotel in which the team of World Bank was staying. Their officers were present there from 03rd July without the knowledge of villagers. After the incident, Ms.Sona Thakur of World Bank has came out and asked them to sit and talk inside the hotel. https://www.facebook.com/sandrp.in/posts/1083146828379656

Why Vishnuprayag and other Uttarakhand Hydro Projects continue to affect two years after the June 2013 disaster https://sandrp.wordpress.com/2015/07/09/why-vishnuprayag-and-other-uttarakhand-hydro-projects-continue-affect-two-years-after-the-june-2013-disaster/

Small Hydro: Kharadi in Yamuna Basin: when Small Hydro unleashes big destruction https://sandrp.wordpress.com/2015/07/10/kharadi-small-hydro-unleashing-big-destruction/

Jammu & Kashmir: NHPC’s Chutak power house submerged in Kargil: NHPC clueless two weeks after the disaster https://sandrp.wordpress.com/2015/07/11/nhpcs-chutak-power-house-submerged-in-kargil-nhpc-clueless-two-weeks-after-the-disaster/

DAMS

MHA to Monitor Landslide Dams to Avoid Any Disaster (10 July 2015) The threat of severe earthquakes in the Himalayan region close on the heels of the devastating one in Nepal, as indicated by several scientific studies, has prompted India to put hundreds of landslide dams or LSDs under constant monitoring so that they do not break with catastrophic consequences. The Centre has roped in the National Remote Sensing Centre, Central Water Commission and the Indian Air Force as part of the new SOPs to ensure continuous monitoring of the quantity of water flow of all major rivers in the upper reaches by visual, instrumental, aerial and satellite surveillance, and ascertaining the cause of a reduced water flow at the earliest. http://epaperbeta.timesofindia.com/Article.aspx?eid=31818&articlexml=MHA-to-Monitor-Landslide-Dams-to-Avoid-Any-10072015003067

NAPM Press Release: Frustrated over long delay in rehabilitation, Sardar Sarovar Project Affected Commits Suicide (10 July 2015) Yesterday, on 9th July 2015, in the village Chimalkhedy, barely 10 to 12 kms away from the Sardar Sarovar Dam, TembhryaKutarya consumed poison and committed suicide. This news reveals the actual dire reality underlying the false tall claims of rehabilitation by Maharashtra Government. While this press note is being drafted the dead body of the old man Tembhrya Kutarya is decaying on the banks of the river Narmada in the village Chimalkhedy and the Govt. is “still thinking” how to take MBBS doctor there to do postmortem. Dr. Anil Patil appointed on the riverine dispensary on the medical barge that is very irregular, in spite of being in Kevadia colony (the colony near SSP) since yesterday morning was apparently neither aware of nor was concerned about this incident. https://www.facebook.com/sandrp.in/posts/1083835098310829

Continue reading “Dams, Rivers & People: July 13, 2015”

Dams

NHPC’s Chutak power house submerged in Kargil: NHPC clueless two weeks after the disaster

Power house of NHPC’s 44 MW Chutak hydropower project on Suru River in Kargil in Jammu & Kashmir was submerged on the night of June 28, 2015, two weeks later India’s premier hydropower company is still clueless about the cause. One of the costliest hydropower projects of India, the project in Indus basin was dedicated to the nation by Prime Minister Narendra Modi less than a year back on August 12, 2014. For several hours after the water started filling the powerhouse, the project officials were in the dark and media reported that it was locals who alerted the officials. Continue reading “NHPC’s Chutak power house submerged in Kargil: NHPC clueless two weeks after the disaster”

Dams · Expert Appraisal Committee · Ministry of Environment and Forests

NGT Quashes MoEF’s Office Memoranda on violating projects: Large number of irrigation projects of Maharashtra & Karnataka affected

Press Release                                                 08.07.2015

In a landmark judgement, the Hon. National Green Tribunal has quashed the Office Memoranda issued by the Union Ministry of Environment, Forests & Climate Change (MoEF for short) on the 12.12.2012 & 27.06.2013 for “Consideration of proposals for  TORs/Environment Clearance/ CRZ Clearance involving violation of the Environment (Protection) Act, 19861 Environment Impact Assessment (EIA) Notification, 2006 / Coastal Regulation Zone (CRZ) Notification, 2011”. Continue reading “NGT Quashes MoEF’s Office Memoranda on violating projects: Large number of irrigation projects of Maharashtra & Karnataka affected”

Dams · Dams, Rivers & People

Dams, Rivers & People: July 06, 2015

HYDROPOWER

NORTH-EAST: ARUNACHAL PRADESH: 4 hydroelectric projects including 2000 MW Subansiri denied environmental clearance (02 July 2015) ” The committee also noted that public hearings for the projects had not been conducted and asked the power developers to submit response to the various issues raised by the New Delhi-based NGO South Asia Network on Dams, Rivers and People.” http://www.telegraphindia.com/1150702/jsp/northeast/story_29019.jsp#.VZXfvqRdz5d Continue reading “Dams, Rivers & People: July 06, 2015”

Dams

Dams, Rivers & People: June 29, 2015

HYDROPOWER

UTTARAKHAND: 

Constructing new dams will hinder mission to clean Ganga, says Uma Bharti Flagging her concerns against the major culprit (hydro-power projects), the Union water resources minister Uma Bharti has asked different ministries including environment and power to take a cautious approach while allowing construction of any new dam on the river. Her ministry is particularly against the six contentious hydro power projects in Uttarakhand which, it thinks, would severely affect the e-flow of the Ganga. Environmentalists had already pitched for scrapping of such projects that they believe may lead to another June, 2013-like disaster in the region. (June 24, 2015: http://timesofindia.indiatimes.com/home/environment/pollution/Constructing-new-dams-will-hinder-mission-to-clean-Ganga-says-Uma-Bharti/articleshow/47793769.cms) Continue reading “Dams, Rivers & People: June 29, 2015”

Dams · Krishna River · Maharashtra · Marathwada · Ministry of Environment and Forests

Krishna Marathwada Scheme receives Environmental Clearance WITHOUT Water Availability!

Why is the Maharashtra Govt and the MoEF misleading people of Marathwada?

Press Release 29.06.15

On the 24th June 2015, the Union Ministry for Forests, Environment and Climate Change (MoEF for short) granted Environmental Clearance[1] to Krishna Marathwada Lift Irrigation Scheme for diverting 23.66 TMC (Thousand Million Cubic Feet) water from Krishna 1 Sub basin to Krishna 3 Sub basin of Krishna River Basin. The media has reported the development as a “Respite for Marathwada”.

However, as SANDRP had written to the MoEF several times[2], this Environment clearance is based on non-existent water availability and a misleading EIA[3] by Science and Technology Park, University of Pune. Continue reading “Krishna Marathwada Scheme receives Environmental Clearance WITHOUT Water Availability!”